required for an application. Section 260(1)(e) of the
Sustainable Planning Act 2009 provides that if the
owner’s consent is required under section 263, then an
application must contain, or be accompanied by, the
written consent of the owner, or include a declaration by
the applicant that the owner has given written consent
to the making of the application. If a development
application relates to a state resource, the application is
not required to be supported by evidence of an
allocation or entitlement to a state resource. However,
where the state is the owner of the subject land, the
written consent of the state, as landowner, may be
required. Allocation or entitlement to the state resource
is a separate process and will need to be obtained
before development commences.

Question 7
* |f the premises is listed on either the Contaminated

Land Register (CLR) or the Environmental
Management Register (EMR) under the
Environmental Protection Act 1994 it may be
necessary to seek compliance assessment. Schedule
18 of the Sustainable Planning Regulation 2009
identifies where compliance assessment is required.

Question 11

* The Building and Construction Industry (Portable Long
Service Leave) Act 1997 prescribes when the portable
long service leave levy is payable.

* The portable long service leave levy amount and other
prescribed percentages and rates for calculating the
levy are prescribed in the Building and Construction
Industry (Portable Long Service Leave) Regulation
2002.

Question 12

* The portable long service leave levy need not be paid
when the application is made, but the Building and
Construction Industry (Portable Long Service Leave)
Act 1997 requires the levy to be paid before a
development permit is issued.

* Building and construction industry notification and
payment forms are available from any Queensland post
office or agency, on request from QLeave, or can be

Used in these records

About this file

File size
7.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Form 1 and 7.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.