Approved Decision Notice - MCU24/0112 [As Published]
External Works
28. Hilton Terrace must be upgraded for the length of its frontage to the subject site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice.
Site Access and Driveways
29. A sealed access driveway must be provided from Hilton Terrace to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with council standard drawings RS-049 and RS-
050.
Car Parking
30. A minimum of 8 car parking spaces must be provided and marked on the site and made
available and accessible at all times for residents. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. 1 visitor parking spaces within the total, which are clearly marked for that purpose and
accessible at all times for visitor use;
b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
31. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Pedestrian and Bicycle Facilities
32. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. a 2 metre wide concrete footpath within the road verge for the entire length of the site’s
frontage to Hilton Terrace;
b. Floor finish for pedestrian pathways, to provide contrast in colour and texture to
driveway, generally in accordance with plan A1001, “Overall Plan – Ground Floor”,
prepared by Blight Rayner.
Stormwater Drainage
33. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and generally in accordance with:
a. “Stormwater Management Report”, ref: S24-163, prepared by Westera Partners, dated
7 November 2024.
Services
34. Reticulated electricity and telecommunication services must be provided to each unit in
accordance with the standards and requirements of the relevant service provider.
35. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
36. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Page 5 of 10
Document Set ID: 23553554
Version: 3, Version Date: 14/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Decision Notice - MCU24/0112 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 167 KB (small file)
- File type
No other editions are linked here.