Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-02-12 Planning & Environment Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                           AGENDA


   Planning & Environment
     Committee Meeting


             Tuesday, 12 February 2019


                     commencing at 9.30am
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Brian Stockwell (Chair), Jess Glasgow, Ingrid Jackson, Tony Wellington




                       “Noosa Shire – different by nature”
Log in to download the original file

2019-02-12 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 79 (of 94)

Section 2

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA            12 FEBRUARY 2019


TABLE OF CONTENTS

ITEM                                                                     PAGE

ATTENDANCE & APOLOGIES                                                      -

PRESENTATIONS                                                               -

REPORTS FOR CONSIDERATION OF THE COMMITTEE                                  3

1      RAL18/0009 - DEVELOPMENT APPLICATION TO RECONFIGURE A LOT FOR 1
       INTO 2 LOTS AT 20 MITTI STREET, NOOSA HEADS                          3

2      MCU18/0165 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
       FOR MULTIPLE HOUSING TYPE 4 CONVENTIONAL (17 DWELLING UNITS) AT
       25 KAURI STREET, COOROY                                             13

3      ENVIRONMENT GRANTS POLICY                                           43

REPORTS FOR NOTING BY THE COMMITTEE                                        64

4      ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT UPDATE -
       2ND QUARTER 2018-19                                                 64

5      ZERO EMISSIONS NOOSA (ZEN) ORGANISATIONAL STRATEGY UPDATE JULY
       2017 - DECEMBER 2018                                                75

CLOSED SESSION                                                        -




                                                                 Page 2 of 94

Section 3

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            12 FEBRUARY 2019



REPORTS FOR CONSIDERATION OF THE COMMITTEE


1                        RAL18/0009 - DEVELOPMENT APPLICATION TO RECONFIGURE A LOT FOR 1 INTO 2
                         LOTS AT 20 MITTI STREET, NOOSA HEADS
DOCUMENT INFORM AT ION




Author                              Manager Development Assessment, Kerri Coyle
                                    Environment and Sustainable Development Department

Index                               ECM / Application / RAL18/0009

Attachments                         1.    Proposal Plans
                                    2.    Amended Plans


                   APPLICATION DETAILS

                   Applicant                     Sara Marie Tritton
                                                 Peter John Cameron Loxton

                   Proposal                      Reconfiguring a Lot – 1 lot into 2 lots

                   Properly Made Date            16 April 2018

                   Information Request Date      8 May 2018

                   Information Response Date     9 May 2018

                   Decision Due Date             22 February 2019

                   Number of Submissions         Nil



                   PROPERTY DETAILS

                   Property Address              20 Mitti Street, Noosa Heads
                   RP Description                Lot 2 RP 173874

                   Land Area                     1373m²

                   Existing Use of Land          2 Detached Houses



                   STATUTORY DETAILS

                   SEQRP Designation             Urban Footprint

                   Locality                      Noosa Heads Locality

                   Zone                          Detached House
                   Overlays                      Nil

                   Assessment Type               Code




                                                                                                 Page 3 of 94

Section 4

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                12 FEBRUARY 2019


RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 12 February 2019 regarding Application No. RAL18/0009
for a Development Permit to Reconfigure a Lot - 1 lot into 2 lots situated at 20 Mitti Street, Noosa
Heads and:
A.    Refuse Application No. RAL18/0009 for a Development Permit for Reconfiguring A Lot - 1 lot
      into 2 lots, situated at 20 Mitti Street, Noosa Heads for the following reasons:
      1.    The proposal is not consistent with The Noosa Plan’s Reconfiguring a Lot Code as the
            proposed lots are not suitable for their intended use as they do not contain house site
            areas 100% above the 1% AEP flood level with lot 1 subject to significant flooding from
            an overland drainage path.
      2.    The proposal has not demonstrated suitable, safe and appropriate access to Lot 1.
      3.    The applicant has not sufficiently demonstrated the proposal will not cause offsite
            flooding impacts.
      4.    The proposed lots are not consistent with The Noosa Plan’s Noosa Heads Locality
            Code as the proposal will not maintain the safety of people and will not achieve a high
            level of residential amenity for residents given the overland drainage path that
            traverses the property.
      5.    The proposed reconfiguration will ultimately place more people within an area which
            has a clear risk of flooding compromising people’s safety.
      6.    The proposed lots do not comply with The Noosa Plan’s Reconfiguring a Lot Code as
            the lots are located within 50m of Noosa National Park.
B.    Advise the applicant that a Detached House is permitted to have only 1 kitchen and laundry
      pursuant to the Noosa Plan’s Detached House Code and therefore the second kitchen and
      any second laundry must be removed.
C.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.    PROPOSAL
This application proposes to subdivide 1 lot into 2 residential lots with both lots to share an access
from Mitti Street. An easement is to be provided over proposed lot 2 for access and services with
a drainage easement initially proposed generally over the whole of lot 1 excluding the existing
building footprint, with the area of the drainage easement reflective of the existing overland flow
path through the site.
    Proposed lot 1 is 711m2.
    Proposed 2 is 662m2 including an access easement.
The applicant recently stopped the decision period as provided for by the Planning Act 2016 and
amended their proposal plans slightly and removed the drainage easement. The applicant though
has now indicated a willingness to accept the requirement of an easement over lot 1 where the
easement’s purpose is clear. Attachment 1 shows the original proposed lot layout lodged and
drainage easement. Attachment 2 includes the recently amended plans.
This application has been lodged in response to a complaint received raising concerns that the
new buildings recently constructed at 20 Mitti Street are being used as 2 detached houses in
breach of The Noosa Plan. Review of the house plans, an online search and discussions with the
owner suggests that the house on lot 2 is being offered on line for short term visitor accommodation
with the house on lot 1 being used by the owner.


                                                                                        Page 4 of 94

Section 5

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 FEBRUARY 2019


2.    SITE DETAILS
2.1. Background
At the time the site was being redeveloped, complaints were received from neighbouring residents
concerned that the proposed works were likely to adversely impact on the neighbouring residents
due to changes in stormwater flows and clearing had been undertaken on site and potentially in
the adjoining National Park.
The matter was investigated at the time and drainage plans were provided by the applicant that
demonstrated stormwater would be suitably conveyed to prevent scouring of neighbouring
properties. The investigation also showed that vegetation cleared was not protected by The Noosa
Plan and was able to be removed without approval from Council. No clearing was evident in the
National Park.
Review of the approved house plans also indicated that the proposed development may constitute
2 houses, with 2 separate distinct buildings proposed connected by a covered walkway with the
new ‘building’ at the site’s rear on proposed lot 1 containing a large ‘rumpus’ room and ‘wet bar’, a
number of bedrooms and separate garaging. This was raised by officers at the time however the
owner maintained it was for use as one detached house. Inspection of the site and building at the
rear shows that the building on proposed lot 1 is being used as a detached house by the owner
and the building on lot 2 is being made available for online short term visitor accommodation.
2.2. Site Description
The site has a total area of 1373m2 and is a battle-axe shaped lot with access from Mitti Street.
The site slopes at a rate of approximately 17% from Mitti Street towards the rear of the site. The
site includes numerous palms and melaleucas which are not proposed to be removed as part of
this proposal, though it is noted some may require removal in the future should a fence be
constructed on the proposed boundary.
An overland drainage line extends through the site from south to north. This drainage line is not
mapped as a waterway by The Noosa Plan. Figure 1 below identifies the subject site location.




                                  Figure 1 – Aerial of the subject site


                                                                                       Page 5 of 94

Section 6

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          12 FEBRUARY 2019


2.3. Surrounding Land Uses
The site is surrounded by a mix of detached houses and units reflective of past planning schemes
with lot sizes in the area generally reflective of this existing development. The Rainforest Terraces
at 22 Mitti Street include 5 individual townhouses with a common driveway and central recreation
area. Each townhouse is on its own lot of approximately 350m2. To the south is Park Edge Court
which comprises 3 town houses with a common road, with each building lot ranging in size from
358m2 to 378m2. The site backs on to the Noosa National Park as shown in Figure 2 below.




     Figure 2 – The subject site identified lighted shaded and Noosa National Park to the subject sites right.

3.     ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
     State Planning Policy;
     South East Queensland Regional Plan;
     Planning Regulation 2017;
     The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.




                                                                                                  Page 6 of 94

Section 7

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                12 FEBRUARY 2019


South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmark from the Planning Regulation 2017 applies to the
application:
    SEQ Development Area
The proposal is for urban activity within the Urban Footprint and is consistent with the assessment
benchmarks contained in the Planning Regulation 2017.
3.3. Statutory Instruments – Planning Scheme
Locality Provisions
The subject site is located in the Noosa Heads Locality and is zoned Detached Housing. The
overall outcomes for the Detached Housing zone seek that detached housing prevails to maintain:
    a low impact, low density development form of domestic scale,
    a high level of residential of amenity
    allotment sizes and densities which are consistent with the character of the particular
      neighbourhood
    building styles befitting the character of the locality and which respond to, and are integrated
      with, site characteristics including slope, vegetation and water frontage where applicant; and
    landscaping amongst buildings, retaining trees and vegetation wherever practical.
The proposed lot sizes are consistent with the character of the particular neighbourhood with lot
sizes to the north and south of the site of a similar or lesser area to the lots proposed.
Reconfiguring a Lot
The Reconfiguring a Lot Code requires lots to have the appropriate area and dimensions to provide
for the intended use, be not less than 600m2 for detached house lots and 800m2 for battle-axe
shaped lots excluding any access handle and provide for private open space.
The proposed battle-axe lots all fall below the minimum lot size and lot 1 is not considered to have
an appropriate area to provide for its intended use, as lot 1 has a large overland drainage flow path
that traverses the site, as reflected by the drainage easement initially proposed and covers the
whole of Lot 1 and an the eastern portion of Lot 2 as shown in Figure 3 below. While there are
some relevant grounds for a lesser lot size, given the surrounding lot sizes, proposed lot 1 is not
considered a suitable lot. The proposed lot has no useable outdoor area for use by residents, with
no works such as pools, garden sheds, cubby houses and the like able to be constructed within
the overland drainage flow path due to the potential impact on drainage in the area.
Figure 3 shows the extent of inundation in a 1% AEP event.




                                                                                        Page 7 of 94

Section 8

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 FEBRUARY 2019




                                Figure 3 – 1% AEP extent shaded in blue

An existing driveway to access the rear building is located across the overland drainage path which
is not immune to certain rain events particularly during a 1% AEP rain event. Concerns are raised
regarding potential adverse offsite flooding impacts and the ability of residents to enter and exit the
property and to evacuate in major flooding events, compromising the safety of people.
In regard to these concerns, the proposal is to raise the driveway to offset some of the flooding
impacts and the applicant’s hydrology consultant advises the following:
    The flow across the site is an intermittent flow path from Noosa National Park being dry most
      of the time with only trickle flows.
    Only approximately 30% of the total flow from the upstream catchment passes through the
      site with the remaining 70% outside the site and inside the National Park.
    Adjacent the very upstream southern boundary the flow depth beside the existing residence
      in a 1% AEP is 400-500mm deep
    The required flood immunity for detached houses under the Noosa Plan is 300mm above the
      modelled floor level whereas the freeboard provided to the existing residence is 580mm
      above the highest water elevation in the defined flood event on the upper most southern
      boundary, which is compliant.
    The maximum flow depth across the driveway low point is 390mm and the velocity is 1.0m/s
      maximum which complies with Table 7.4.5 from QUDM which requires a maximum depth x
      velocity of 0.45m/s2 and the proposal is 0.39m/s2. The QUDM table limits depth x velocity to
      be less than 0.45m/s2 for vehicle safety at intersections.




                                                                                         Page 8 of 94

Section 9

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  12 FEBRUARY 2019


    The critical time for concentration during 1% flood event is 33 minutes. This means it takes
      33 minutes to reach peak depth and velocity and then gradually subsides within
      approximately 60-65 minutes back to ‘dry’. Therefore, the peak (worst case) flows across the
      driveway and the site are only happening for 10-15 minutes as per typical flood hydrograph
      below shown as Figure 4.




Figure 4 - Hydrograph

Council’s hydrology consultant has reviewed the applicant’s Flood Hazard Assessment Report and
provides the following advice:
    The flood report suggests that only 30% of the total catchment flow will drain through the site
      but there is no detail of how this has been determined. A review of the LiDAR ground level
      DEM of the area suggests most, if not all, of the total catchment runoff is likely to drain
      through the site.
    The modelling makes no allowance for fence blockages and appears to be too localised to
      provide meaningful results. While I have not inspected the site, aerial imagery shows that a
      tennis court is situated immediately downstream. Given the bushland catchment, there is a
      high potential for a chain wire fence to become highly blocked with debris and this will
      increase flood levels through the site.
    No comments have been provided in regards to the flood resilience of the dwelling. It is
      situated within a natural bushland flow path and it will be subject to flooding from time to time
      (certainly below floor level). It would need to be demonstrated that the house is resilient to
      flooding and give consideration to the high levels of natural debris that is likely to be mobilised
      during a large flood.
    Flood hazard risk associated with the proposed access should be assessed in more detail
      and account for full catchment flows and debris.
    Overall I would not support this proposal. Ultimately it will place more people within an area
      which has a clear risk of flooding.
    There is a discrepancy between the house extension architectural drawings by Void Building
      Design and the Building Pad and Site Works Plan (ST03-1) (2) by Barlow Shelley on the
      exact location of the driveway and associated culvert crossing
    Flood level and velocity impact plots are required to demonstrate no significant adverse
      flooding impacts will result on adjacent and downstream properties, and to demonstrate that
      a lawful point of discharge will be achieved
    A number of deficiencies in the information supplied to date, as well as discrepancies in this
      data, have been identified.
The proposal is not consistent with the Reconfiguring a Lot Code requirements for 100% of the
allotment to be above the defined flood level of 1% AEP water surface levels, with lot 1 located
almost fully below the 1% AEP and lot 2 in part. Lot 1 clearly does not contain a suitable house
site area being subject to flooding from an overland drainage flow path.


                                                                                          Page 9 of 94

Section 10

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 FEBRUARY 2019


Specific Outcome 05 also requires house site areas to be located at least 50m from any land within
a national park. The additional lot is located within 50m of the National Park and while a building
has already been constructed on the lot there is potential for ongoing edge effects.
4.    CONSULTATION
4.1. Referral Agencies
The application was not required to be referred to any state Referral Agencies.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
    Coordinator Operational Works
    Two external Hydrology Consultants
4.3. Public Notification
The application was code assessable and not required to be publicly notified for comment.
5.    CONCLUSION & REASONS FOR DECISION
The applicant seeks to create 2 new residential detached house lots, one of which is nearly
completely inundated in a 1% AEP event.
It is proposed to raise the driveway to help offset flooding impacts on the surrounding properties
and to gain safe access to and from the site. However, it is considered the applicant has not
sufficiently demonstrated that there will be no offsite flooding impacts as a result of the proposal
and therefore has the potential to cause actionable nuisance and compromise the safety of people
and property.
The proposal is not consistent with The Noosa Plan’s Noosa Heads Locality Code and
Reconfiguring a Lot Code as the proposed lots, particularly lot 1, is not suitable for its intended use
given the overland drainage path that flows through the site. The proposed lots are not fully located
above the defined flood event level and are subject to flooding.
While a building has been built on lot 1, the creation of a separate lot will ultimately place more
people within a flood area putting people at risk particularly where future residents are unaware of
the drainage overland flow path. Modification will also be required to the existing buildings to
ensure they meet the requirements for one detached house and are only ever used as 1 detached
house into the future.
Departments/Sections Consulted:
     Chief Executive Officer          Community Services                          Corporate Services
     Executive Officer                Community Development                       Financial Services
     Executive Support                Community Facilities                        ICT
                                      Libraries & Galleries                       Procurement & Fleet
                                      Local Laws                                  Property
                                      Waste & Environmental Health                Revenue Services

     Executive Services           x   Environment & Sustainable Development   X   Infrastructure Services
     Community Engagement             Building & Plumbing Services                Asset Management
     Customer Service             x   Development Assessment                      Buildings and Facilities
     Governance                       Economic Development                        Civil Operations
     People and Culture               Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 10 of 94

Section 11

ATTACHMENT 1




               Page 11 of 94

ATTACHMENT 1                                                                                                                                                                                                       —__ EXISTING LEGEND
                                                                                                                                                                                                                         —           ~      EXISTING STORMWATER
                                                                                                                                                                                                         cS                    Ss           EXISTING SEWER MAIN
                                                                                                                                                                                                                         _        .         EXISTING WATERMAIN
                                                                                                                                                                                                                         ~          ee      EXISTING ENERGEX - OVERHEAD
                                                                                                   \                                                                                                                       LEGEND
                                                                      1                                                                                                                                                     ——
                                                                    GTP1450                         uw                                                                                                                     —_———— _        PROPOSED LOT BOUNDARY
                                                                                                     \                                                  «
             oS                                                                                      \                                                GTP1450                                                                        a     PROPOSED ACCESS EASEMENT
             gy                                                                                      “                                                                                                                        LOT 1        LOT NUMBER
   on    £                                                                                            \                                                                                                                      689m2        LOT AREA
      “—
        ~      ay!                                    cp                                               wo                                                                                                                  a aleslentetesietenterten! PROPOSED DRAINAGE EASEMENT
      £               oe                            GTP1450                                             \
 tT s         ;              Sy                          29193m             EXISTING BDY                é                                EXISTING BDY   XS         32.03m                                                      32.03m      PROPOSED BOUNDARY MEASUREMENTS
       *                                                                                                         a                                         ~ SQ
   te   Ry   m8                             EXISTING DRIVEWAY                                                    5                                             ii                 ‘
     —              te                                                                ACCESS                  ERB                                          DRAINAGE                         :         ‘
                     —..                                                           EASEMENT A           n     oye                                          EASEMENT B
           ~,                                                                          439m?                     2                                          432m?                ay
                               17.84m   EXISTING BDY                Nw,                                                                                        i}                 z
                                                                      <                                                                      EXISTING DRIVEWAY                    3
                                                                        YAS _. LPROPOSEDACCESS EASEMENT ( _ __jit26m                                                              3
                                                                                          11.38m                                                                                  BE
                                                                                                        |                                                      I                 os
                                                                                                                                                                                  OQ
                                                                                                        |                                      S                                  ea
                                                                                                       A                       2,    ea      &
                                                                                                                                 Rp)        fy
                                                                                                                                    Sey    v
                                                                                                                                       >,                          \\
                                                                                                                                            .                         \
                                                                                                       ,                                     we,                  [ys                     »
                                                                é                                                                  —4        Wy      YB              x”                   z                        ¥
                                                                z                                                                            rg      2             /                      %         EXISTING       ra                             NOOSA
                                                                                                                                             12      g            /                       2          RESIDENCE     8      >                       NATIONAL
                                                                                                     ut                                       és     =        wf /                                                 &      8                       PARK
                                                                                                                EXISTING                    re       2        F /                                                         9
                                                                                                               RESIDENCE                       o/s   a      /f                                                            Zz
                                                                >»                                                                             gis         /                                                              B
                                                                3                                                                              84        7.                                                               a
                                                                g                                                                              a4     25m OFFSET TO
                         8                                      =                                     n                                        p- ul     y                                                                E
                     RP173874                                   a                                                    LOT2                               wi                                          LOT 1                 8
                                                                a                                                   684m?                                   :                                      689m2                  be
                                                                                                      wv         (Including                             ed reer                                 (Including
                                                                                                                   Access                              -                                         Drainage
                                                                                                                                                         CORNER                                        .
                                                                                                               Easement A)                  f          | ‘                                    Easement B)
                                                                                                                                                         }
                                                                                                      a                                    i             4
                                                                                                      |                                     ‘IF
                                                                                                                                             ‘            {
                                                                                                      “                                       ‘        i.
                                                                                                      |                                          X                         age = a
                                                                                                                                               SARS
                                                                                                     ”                                             \           Se        a        SSS
                                                                                               25.00m              EXISTING BDY                                             2ii5m — EXISTING BDY
                                                                                                     wo
                                                                                                                                                                      EXISTING WALKWAY
                                                                      2                                                                    cP                         TO BE REMOVED
                                                                    GTP1332                                                              GTP1332
                                                                                                     “

                                                                                                                                        =                                            PROJECT                                                            JOB NUMBER
Fy   5 pecompmon =| ar [onto] DRAWING DETAI                                        SCALE                      APPROVED                 oe       B a ri ow                            PROPOSED RESIDENTIAL DEVELOPMENT                                    1443
                                                                                                             wr                        a    {                                        AT 20 MITT! STREET, NOOSA HEADS
                                                                             oy                               logy. diye               ac       Shellie                               OR P LOXTON & § TRITTON
                                                              AHO                                                                 j    s
                                                                       SS                  =>             Directo: TONY   LLEY    Ae                                                 PRAWING TITLE                                                  DRAWING NUMBER | REV
                                                                                   SCALE 1:20 A3                (RPEQ 7736)            esi      p orsusens                           PLAN OF DEVELOPMENT                                                P01
                                                =               —_      suing avo nbesosied cr snesdes eine) wen se srarus             ees      © leghonhaleycon au WW www an.
                                                                                                                                                                                                                                                  Page 11         of 94

Section 12

ATTACHMENT 2




               Page 12 of 94

EXISTING LEGEND
     ATTACHMENT 2                                                                                                                                                                                                                      ———————             —_paistne stoner
                                                                                                                                                                                                                       cS               —$ —               EXISTING SEWER MAIN
                                                                                                                                                                                                                                       —w——— » ——_        EXISTING WATERMAIN
                                                                                                                                                                                                                                       —oH1P ——— HF -—     EXISTING ENERGEX - OVERHEAD
                                                                                                          \                                                                                                                              LEGEND
                                                                       GTP1450                             Ww
                                                                                                                                                                                                                                     --                   PROPOSED LOT BOUNDARY
                                                                                                                                                                  cP
              L                                                                                             b                                                   GTP1450                                                                  _—_————          PROPOSED ACCESS EASEMENT
              gy                                                                                                                                                                                                                            LOT 1         LOT NUMBER
           &                                                                                                                                                                                                                               689m?          LOT AREA
      A _ @®
         ~                                                op                                                 wo                                                                                                                          ----------       PROPOSED DRAINAGE EASEMENT
       £               ee                               GTP1450
                 Op
a s                               ay                         29:93               EXISTING BDY         —                                           EXISTING BDY   SN          32.03m                                                           32.03m      PROPOSED BOUNDARY MEASUREMENTS
        “—      P                                                                                —                                                                   SSS
 NS      Ry   m8                      |        EXISTING DRIVEWAY                                           a                                                             ‘\                   .
     NY             ot,                                                                     ACCESS         2         L                      .                               }                            .         .
                       —.,|            7                                                  EASEMENTA     E03                                     2             ‘           7
             SS                                                                             139m?       SH°
                               5                                                                           $
                                 17.84m   EXISTING BDY                  NY.                                =
                                                                           Or                                           |                              EXISTING DRIVEWAY
                                                                                PROPOSED ACCESS EASEMENT       Gn oo    es             S
                                                                                           735m                |        ’                           a
                                                                               |                                                                        b
                                                                                                                                                       &
                                                                                                             real                       pale           &
                                                                                                                              —          Oe UR       wy
                                                                                                                                    :         “os    v   .
                                                                                                                        X         7             OS                           \
                                                                                                              i                                                             |
                                                                                                                                                      !        >                                       2                         u
                                                                    &                                                                           :     \        a                7                      5                         =
                                                                    S                                                                                          2              /                        5         EXISTING       rs                                NOOSA
                                                                                                                                                                             /                                                   °
                                                                                                                                                               8             f                         2         RESIDENCE       °      >                         NATIONAL
                                                                                                             wn                                                2            /                                                    =      a                         PARK
                                                                                                                      EXISTING                                 g        ge /         5                                                  ©
                                                                                                                      RESIDENCE                                =       Jf           .                                                   z
                                                                     >                                                                                                / if         -                                                    &
                                                                     8                                                                                          251 okietio                                                             “
                                                                     g                                       i                                                    jm
                        RP173874                                    &                                                       Lor 2                                                                                LOT 1                  8
                          18                                         &                                                                                            WALL                                                                  E
                                                                    a                                                             m                                  jf                                                  2              “
                                                                                                                         (Including                                LA                                           711m
                                                                                                             w                                                  1.5m OFFSET TO ROOF
                                                                                                                           Access                                  CORNER
                                                                                                                      Easement A)                                it
                                                                                                             wo
                                                                                                             |                                              eS
                                                                                                                                                            &
                                                                                                            “                                          5         4  \

                                                                                                                                                                         TS        YY a
                                                                                                      25.00m               EXISTING BDY                                              ~ 2i1sm   EXISTING BDY
                                                                                                            “w
                                                                                                                                                                                EXISTING WALKWAY
                                                                           2                                                                       cp                           TO BE REMOVED
                                                                        GTP1332                                                                   GTP1332
                                                                                                           w

                                                                                                                                         v       =                                              PROUEOT:                                                                JOB NUMBER
          DESCRIPTION                   BY         DRAWING DETAILS                      SCALE                        APPROVED                    i,      B arlow                                PROPOSED RESIDENTIAL DEVELOPMENT                                          1443
     +                                             ee]                                                                Zz                       A'a                                             AT 20 MITTI STREET, NOOSA HEADS
                                                  DATUM            AHO                                                                          A
                                                   pee                                                              ee                          et Slhaeiley                              = [ren 212ow ss mrron                                                     —
                                                     3                                                                                    |           NN
                                                                                                                  Director: TONY  LLEY   [ieee      we                                          DRAWING TITLE:                                                      DRAWING NUMBER | REV
                                                   =                                    SCALE F200 3                   (RPEQ 7736)              ARS      p orsusens                             PLAN OF DEVELOPMENT                                                     Po1         A
                                                  Joare [07-06-18 Jodici hules    corevlne 3x                         FOR APPROVAL              BEANE    2 F0 Box 899, Maroochydore, 4558 ABN 89 215 591 O77

Section 13

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            12 FEBRUARY 2019



2                        MCU18/0165 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
                         MULTIPLE HOUSING TYPE 4 CONVENTIONAL (17 DWELLING UNITS) AT 25 KAURI
                         STREET, COOROY
DOCUMENT INFORM AT ION




Author                           Coordinator Planning, Patrick Murphy
                                 Environment and Sustainable Development Department

Index                            Application / ECM / MCU18/0165

Attachments                      1.   Proposal plans


         APPLICATION DETAILS

         Applicant                          Pace Planning Pty Ltd

         Proposal                           Material Change of Use - Multiple Housing - Type 4 Conventional

         Properly Made Date                 4 October 2018

         Information Request Date           1 November 2018
         Information Response Date          28 November 2018

         Decision Due Date                  18 February 2019

         Number of Submissions              Three (3)



         PROPERTY DETAILS

         Property Address                   25 Kauri St Cooroy Qld 4563

         RP Description                     Lot 27 C 56016

         Land Area                          4741m²

         Existing Use of Land               Vacant land



         STATUTORY DETAILS

         SEQRP Designation                  Urban Footprint

         Locality                           Cooroy and Lake Macdonald

         Zone                               Attached Housing

         Overlays                           Nil

         Assessment Type                    Impact




                                                                                                  Page 13 of 94

Section 14

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              12 FEBRUARY 2019


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment Committee
Meeting dated 12 February 2019 regarding Application No. MCU18/0165 for a Development Permit
for Material Change of Use - Multiple Housing - Type 4 Conventional (17 dwellings) situated at 25
Kauri Street, Cooroy and:
A.   Approve the application and grant a Preliminary Approval subject to the following conditions:
     1.    Development undertaken in accordance with this approval must generally comply with
           the approved plans of development. The approved plans are numbered 11594 DA 01
           – DA 11 prepared by All Design and Drafting and dated 21 November 2018. These
           plans must be amended in accordance with the conditions.
     2.    Amended plans and associated reports must be submitted to Council prior to issue of
           a Development Permit for Material Change of Use and must include the following to
           the reasonable satisfaction of the Manager, Development Assessment:
           2.1. In addition to the vegetation identified to be retained on the Site Plan –
                Landscaping and Fencing by All Design and Drafting (project 11594 DA03 dated
                21.11.2018) trees 1, 2 and 3 (Eucalyptus tereticornis) identified within the
                Arboricultural Impact Assessment Report by Consult Arborist Pty Ltd dated
                16.01.2019 must be retained.
           2.2. An amended arboriculture assessment report which includes recommendations
                on how the trees are to be retained in accordance with current AS 4970-2009
                Protection of Trees on Development Sites, including any modifications required
                to the development layout.
           2.3. An amended development layout which incorporates the recommendations of
                the amended arboriculture assessment report.
           2.4. Greater articulation to the façades of units 9 and 10 to the internal driveway to
                vary the line and plane of the building.
           2.5. Increased landscaping to the frontages of units 9 and 10 along the internal
                driveway.
           2.6. Roof pitches must be at least 12 degrees.
           2.7. A mix of materials and colours to the external building finishes reflective of
                Cooroy’s traditional character and the schedule detailed on All Design and
                Drafting plan DA03 and dated 21 November 2018.
           2.8. Further articulation of the roof form of units 11-17 to complement the traditional
                streetscape and building forms of Cooroy.
     3.    The development must retain trees 1, 2 and 3 (Eucalyptus tereticornis) identified within
           the Arboricultural Impact Assessment Report by Consult Arborist Pty Ltd dated
           16.01.2019.
           Performance Bond
     4.    Security in the form of a cash bond or trading bank guarantee to the sum of $35,000
           must be submitted to Council, to secure performance of all conditions of this approval,
           prior to the issue of a Development Permit for Operational Works. The cash bond or
           trading bank guarantee will be returned on performance of the conditions of approval
           less any costs incurred by Council in respect of enforcing performance of this permit.
           Council reserves the right to call upon the bond or guaranteed sum to effect compliance
           with conditions.
     5.    The requirements of this development approval are to be effected, prior to the use of
           the premises. Council reserves the right to call upon the bond or guaranteed sum
           referred to in this approval to effect compliance with conditions.

                                                                                    Page 14 of 94

Section 15

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            12 FEBRUARY 2019


          Water & Sewer Connections
    6.    An underground connection to reticulated water and sewerage must be provided to the
          development site in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    7.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to the development site.
          Building Appearance
    8.    All air conditioning units or other mechanical equipment must be located at ground
          level, or otherwise fully enclosed or screened such that they are not visible from the
          street frontages nor adjoining properties.
          Fencing and Walls
    9.    Any street fencing must be set back an average of 1 metre from the front property
          boundary and articulated by stepping the design at maximum 5 metre intervals. Any
          fencing on the front boundary must either:
          a.   not exceed a maximum height of 1.2m
          b.   be of open construction.
    10.   The area of land between the fence and the front property boundary must be densely
          landscaped to screen any fencing from the street.
          Clothes Drying Areas
    11.   Each dwelling unit must be provided with access to an outdoor clothes line which is
          screened from public view.
          Community Management Statement
    12.   Any proposed Community Management Statement required for the development
          pursuant to the Body Corporate and Community Management Act 1997 must be
          submitted to Council for endorsement at the same time as submission of the Building
          Format Plan (or similar) to Council for compliance assessment.
    13.   All clauses and by-laws of the proposed Community Management Statement must
          accord with the requirements of this Decision Notice.
    ENGINEERING
          Site Access and Driveway
    14.   Vehicular access driveways to serve the development shall be constructed from the
          Kauri Street and Olivine Street frontages of the site generally in accordance with the
          final approved layout plans and as amended by the conditions of this permit and in
          compliance with the applicable engineering standards and drawings.
    15.   Sealed access driveways must be provided from Kauri Street and Olivine Street
          frontages of the site to all parking and manoeuvring areas of the development generally
          in accordance with the final approved layout plans as amended by the conditions of
          this permit. The works must be undertaken in accordance with an Operational Works
          approval and must include in particular:
          a.   Driveway crossovers generally in accordance with IPWEAQ standard drawings
               R-049 and R-050, and to grades that prevent vehicles from scraping and/or
               bottoming whilst also allowing for compliant grades and must match the levels of
               any existing or proposed pathway and grassed verge without posing trip or safety
               hazards to the public.



                                                                                  Page 15 of 94

Section 16

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 FEBRUARY 2019


          b.    For pedestrian safety between vehicles exiting the site and pedestrians on the
                footpath, the driveway and any associated fencing or vegetation near the
                driveway must comply with the minimum sight line requirements as defined in
                AS/NZ 2890.1, section 3.2.4.
          c.    The proposed driveway have a maximum width of 6m at kerb line.
          d.    Driveway must have clearance of 1.0m from a power pole and 0.5m from and
                any service pit or manhole (eg telecommunication pit, water metre) unless a
                written approval obtained from the relevant provider.
    16.   All vehicles shall enter and leave the site in a forward direction.
          Car Parking
    17.   Car parking must be provided within the site generally as shown on the final approved
          layout plans. The works must be undertaken in accordance with an Operational Works
          approval and must be in compliance with the provisions AS/NZS 2890.1-2004 for user
          class 1A with allowance for vehicles to enter and leave the site in a forward gear and
          with a minimum head clearance (headroom) at any point of 2.2m.
    18.   The internal dimensions and doorway openings of all enclosed garages shall be
          designed and constructed to comply with the provisions of section 5.4 of AS/NZS
          2890.1. The applicant shall demonstrate compliance by illustrating these dimensions
          on the plans submitted for both Operational Works approval and Building Works
          approval.
    19.   All visitor carpark spaces shall be clearly defined by line marking each space with the
          words “Visitor Parking Only” and by sign posting each space with similar wording.
    20.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.
          Roadworks Widening
    21.   The full length of the Kauri Street and Olivine Street frontages of the development site
          shall be upgraded by providing kerb & channel, bitumen road widening, stormwater
          structures and landscaping improvements to the footpath in accordance with an
          Operational Works approval. The works shall include but are not limited to the following:
          a.    In regard to the Kauri Street frontage the new kerb and channel shall be aligned
                so that it is located 8 metres offset from the existing kerb and channel on the
                western side of Kauri Street measured from the nominal face of the kerb. The
                new kerb and channel shall be extended to the north approximately to the
                prolongation of the common boundary of No 21 and 19A Kauri Street and be
                joined smoothly with the existing kerb and channel.
          b.    In regard to the Olivine Street frontage the new kerb and channel shall be aligned
                at about 12m offset from and parallel to the property boundary and shall extend
                for the full frontage of the subject site. The works shall include suitable tapers
                extending beyond the frontage of the subject site to smoothly join to the existing
                pavement.
          c.    The works (Kauri Street, Olivine Street and the intersection) must include suitable
                drainage structures and stormwater collection to ensure that runoff from the road
                formation is collected, controlled and directed to ensure that the roadway is safely
                trafficable and must be in compliance with the relevant sections of the
                Queensland Urban Drainage Manual (QUDM).




                                                                                     Page 16 of 94

Section 17

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              12 FEBRUARY 2019


          d.    As part of the application for operational works, the developer’s civil engineering
                consultant shall investigate and report on the possible deficiencies in the existing
                stormwater system, to the western end of Agate Street and including inspection
                by closed circuit television (CCTV) of the existing stormwater system. The
                developer is required to rectify any deficient stormwater pipes or structures
                extending from the development frontage down to and including the manhole
                downstream of the 600x1200 box culvert which crosses Kauri Street.
          e.    The design and construction of all works shall be carried out in accordance with
                Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
                Roads, Drainage and Earthworks and the applicable engineering standards
                current at the time of construction.
                The above condition is imposed pursuant to s145 of the Planning Act 2016 being
                non-trunk infrastructure.
    22.   All associated and ancillary work including pavement correction to the existing
          pavement, drainage works, modification of the footpath, and adjustments to the existing
          infrastructure shall be undertaken to complete the roadworks widening and must be
          carried out in accordance with the applicable engineering standards and the tree
          retention requirements of this approval.
          In this regard a schedule of works, specifications and plans detailing this work shall be
          prepared and submitted to Council for approval prior to obtaining a Development
          Permit for Operational Works
    23.   The applicant shall truncate the boundaries at the intersection of Kauri Street and
          Olivine Street and shall dedicate the truncated section as “Road”. The truncation shall
          be in accordance with Council’s Planning Scheme Policy PSP 5 – Engineering Design
          Standards- Roads, Drainage and Earthworks part 3.13 (g). The dedication shall be
          undertaken at no cost to Council.
          Pathway and Frontage Works
    24.   A new 2.0m wide concrete path shall be constructed along the Kauri Street and Olivine
          Street frontages of the site in accordance with an Operational Works approval and to
          a desirable and smooth alignment for the comfort of users and protection of trees
          identified in this permit for retention. The new path shall be in compliance with IPWEAQ
          standard drawing SEQ R-065 Concrete Pathway Construction Details.
          The works must include a sufficient number of pram ramps to be provided near the
          intersection of Kauri Street and Olivine Street where identified by Council to connect to
          existing and proposed pathways network.
          The above condition is imposed pursuant to s145 of the Planning Act 2016 being non-
          trunk infrastructure.
    25.   All paths, pram ramps, driveways and parking areas shall be designed and constructed
          to ensure pedestrian safety using non-slip materials, to produce an evenly graded
          surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
          Australian Standard 1428.1 Design for Access & Mobility.
    26.   Footpath improvements such as topsoiling, grassing, tree retention and tree planting
          are required to the Kauri Street and Olivine Street frontages of the site in accordance
          with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines and in
          compliance with Operational Works approval.
    27.   The new path and frontage works must generally match the existing adjoining surfaces
          without causing a trip hazard and extend beyond the frontage where necessary to join
          and taper smoothly with any existing adjoining path and surfaces.



                                                                                    Page 17 of 94

Section 18

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 FEBRUARY 2019


          Stormwater Drainage
    28.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and the Queensland Urban Drainage Manual (QUDM) and the design
          be prepared and certified by a Registered Professional Civil Engineer, and must
          include/address in particular the following:
          a.    Collection and discharge of stormwater to Council’s existing drainage system in
                Kauri Street generally in accordance with Drawing No 2018068-P01 dated
                12/09/2018 by 360 Civil Consulting and including the provision of any required
                inter-allotment drainage within the site.
          b.    Shall be no net increase in stormwater runoff from the current undeveloped
                condition of the site.
          c.    Where applicable, extension of the site stormwater system to accommodate
                stormwater from external adjoining properties, including registration of drainage
                easements.
          d.    The use of gravity stormwater drainage and not surcharge pits.
    29.   A CCTV inspection must be carried out by a Council approved CCTV contractor upon
          satisfactory completion of construction works. The developer will be responsible for the
          full cost of CCTV inspection, including any additional inspection necessary following
          defect identification and rectification.
          Easements
    30.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    31.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard
          easement terms. Draft easement documentation must be submitted to Council for
          endorsement.
    32.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
          Earthworks
    33.   All earthworks must be undertaken in accordance with a development permit for
          Operational Works and in compliance with the provisions of AS 3798: Guidelines on
          Earthworks for Commercial and Residential Development, with geotechnical testing
          undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level
          2’ supervision Test results as required by AS 3798 and/or the directions of the
          supervising engineer. A certification of the earthworks must be provided by a RPEQ
          and submitted to Council prior to the final inspection of the completed works by Council.
    34.   Earthworks works required on site must be carried out so as not to cause the additional
          ponding of water on any adjoining lands or the blockage of, or interference with, any
          natural watercourses.
    35.   Earthworks carried out on site shall not affect the structural integrity of any of the
          existing fences and/or structures and/or lands that border the development site. Fences
          that are affected shall be replaced prior to the Building Certifier issuing the Certificate
          of Classification. In this regard any fences to be replaced shall be clearly shown on the
          plans submitted for Operational Works approval.
    36.   All earthworks and any associated batters must be contained entirely within the subject
          site unless written permission from the respective landowner(s) is provided to Council.
                                                                                     Page 18 of 94

Section 19

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 FEBRUARY 2019


    37.   Where the development involves changes to the existing levels over, or adjacent to,
          drainage, water supply or sewerage infrastructure, all access chamber surface levels
          must be adjusted to provide a freeboard of 100mm above the finished ground surface
          level or as required by the service provider and/or the approved plans for Operational
          Works.
    38.   All retaining walls and stormwater headwalls must be designed and constructed in
          accordance with the planning scheme and must be certified by an RPEQ where
          exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed
          1.0m in height must be fitted with a commercial grade safety fence.
          Erosion and Sediment Control
    39.   Any person acting on this permit shall prevent erosion and sediment export from
          leaving the site. Site control measures such as silt fencing, controlled gravel access to
          the site and controlled disposal of waste, will be necessary.
          In this regard plans prepared by suitably qualified person detailing the methods and
          measures of controlling erosion and sediment are required to be submitted to the
          Council in conjunction with an application for the Development Permit for Operational
          Works.
          Electricity and Telecommunication Services
    40.   Underground reticulated electricity and telecommunication services must be provided
          to the development site in accordance with an approval for Operational Works and be
          in compliance with the standards and requirements of the relevant service provider.
    41.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    42.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and all
          applicable legislation at the time of construction.
    43.   Conduits for electrical power or other services and connections proposed to be
          installed within existing and proposed road reserves under existing sealed
          carriageways, concrete pathways, concrete/sealed driveways or vegetation identified
          for retention must be installed by boring. Trenching is not permitted, unless specifically
          approved by Council.
          General - Engineering
    44.   A suitably qualified Registered Professional Engineer shall prepare engineering
          drawings and specifications for all engineering works that will become Council
          infrastructure, which shall be submitted in conjunction with an application for a
          Development Permit for Operational Works. To avoid conflict with underground pipes
          or services, all existing and proposed services required by the development shall be
          shown on the plans.
    45.   Any alteration of any public utility or other facilities necessitated by the development of
          the land or associated construction works external to the site shall be at no cost to
          Council.




                                                                                     Page 19 of 94

Section 20

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             12 FEBRUARY 2019


    LANDSCAPE & ECOLOGY
          Landscaping & Vegetation Clearing
    46.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and the Noosa Planning Scheme
          Policy 3 Landscaping Plants and Guidelines for Cooroy and must include in particular:
          a.    Provide landscaping plans using local native species that provide detailed
                sections and plan of a 6.0 and 5.0 metre landscaped buffer adjacent to Kauri and
                Olivine Street respectively to buffer the adjacent residential uses from the
                development.
          b.    Provide 100L NATSPEC street trees every 8m of road frontage, positioned in a
                manner that supports adequate sightlines and maintains existing trees identified
                for retention in this permit.
          c.    Provide details of internal landscaping to the development, including provision of
                suitable growing media and area to sustain landscaping, which will provide
                shading and soften the visual appearance of the development.
          d.    Provide landscaping to each dwelling frontages and internal driveway networks
                to provide shade and visual amenity.
          e.    Provide details of the methods to be used during the vegetation clearing including
                the use of licensed spotter/catchers, disposal of cleared vegetation, methods to
                ensure retained vegetation is protected from development works, in particular
                where works are proposed adjacent to root zones of vegetation located on the
                road reserve with reference to current AS 4970-2009 Protection of Trees on
                Development Sites.
    47.   The open space and setback areas are to be landscaped in accordance with Council’s
          Policy on Landscaping Guidelines and a properly prepared landscape plan prepared
          by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to
          be completed prior to the premises being occupied and maintained at all times
          thereafter.
          ENVIRONMENTAL HEALTH
          Waste Management
    48.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
          and Industrial Premises”. The facilities must include an external impervious area
          correctly sized for all refuse and recycling containers and suitably screened from public
          places and neighbouring properties. A bin wash area is required with a cold-water tap,
          hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be
          designed to prevent storm water entry to the sewerage system. This can be achieved
          with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively
          the waste area can be roofed, or any other design approved by Council.
    49.   Refuse containers must be provided in accordance with the requirements of the
          Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
          Regulation 2000, for the storage and collection of refuse.




                                                                                    Page 20 of 94

Section 21

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              12 FEBRUARY 2019


           Mechanical Equipment
     50.   Written certification is required from a suitably qualified person confirming that sound
           pressure levels from all mechanical plant and equipment comply with the following:
           a.    Air-conditioning and Refrigeration
                  7am to 10pm: Maximum background + 5dB(A)
                  10pm to 7am: Maximum background + 3dB(A)
           b.    Pumps
                  7am to 7pm: Maximum background + 5dB(A)
                  7pm to 10pm: Maximum background + 3dB(A)
                  10pm to 7am: No audible noise.
     51.   The certification must be submitted to Council, which certifies that operational noise
           from any fixed plant and equipment complies with the requirements of this Decision
           Notice.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The application seeks approval to develop the site for 17 single storey multiple dwelling units,
comprising 13 x 2 bedroom dwelling units and 4 x 3 bedroom dwelling units. A double garage is
provided to each 3 bedroom dwelling unit and a single garage provided to each 2 bedroom dwelling
unit. Seven uncovered spaces are provided throughout the site. Two access points are proposed
from Kauri Street and one access point is proposed from Olivine Street.
The following image provides a Locality Plan of the subject site and surrounding properties:




                                      Figure 1 – Locality Plan

                                                                                    Page 21 of 94

Section 22

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            12 FEBRUARY 2019


The following images detail site and elevation plans of the proposal. The proposal plans are also
included in Attachment 1.




                                       Figure 2 – Site Plan




                                     Figure 3 – Elevation Plan


                                                                                  Page 22 of 94

Section 23

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                12 FEBRUARY 2019




                                     Figure 4– Elevation Perspective


2.      SITE DETAILS
2.1. Background
There are no recent planning approvals relevant to the site.
2.2. Site Description
The development site is situated on the corner of Kauri and Olivine Streets. It is an undeveloped
site which contains a number of mature eucalypt tree. The property has 2 street frontages with no
formalised access and no kerb or channel.
2.3. Surrounding Land Uses
The area is characterised by a mix of residential development reflective of varying zoning within
Kauri Street and Olivine Street. Dwellings on the opposite side of Olivine Street are generally
reflective of the Cooroy character as they are clad in weatherboard, include a veranda to the front
of the dwelling and a substantial roof pitch. A broader range of dwelling types have been developed
in Olivine Street and it is noted that these contain dwellings which are reflective of the traditional
built form of Cooroy. A description of the properties adjacent to the site is provided below:
North:      21 Kauri Street - undeveloped land owned by Queensland State government
            8 Olivine Street – residential dwelling situated on Detached Housing zoned land
South:      Olivine Street
East:       1 -15 Olivine Street – eight Semi-Attached Zoned lots. One of the lots contains a duplex
            whilst the remaining seven lots contain a detached house
West:       28 - 36 Kauri Street – five Attached Housing zoned lots. 3 of the lots contain a detached
            house with multiple dwellings located on the remaining 2 lots.
3.      ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
      State Planning Policy;
      South East Queensland Regional Plan;
      Planning Regulation 2017;
      The Noosa Plan.



                                                                                      Page 23 of 94

Section 24

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                12 FEBRUARY 2019


3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmarks from the Planning Regulation 2017 apply to the application:
    SEQ Development Area
The proposal is for an urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the provisions
are relevant to the development.
Locality Provisions
The subject site is located in the Cooroy and Lake Macdonald Locality and is zoned Attached
Housing. The application is required to follow an impact assessable application process. The
proposed use is identified as a consistent use within the zone and provides for housing within close
proximity of the Cooroy town centre and the associated services, public transport and community
facilities. The provision of 13 x 2 bedroom dwelling units within the development provides housing
diversity consistent with the dwelling type for which a need has been identified in Council’s Housing
Needs Assessment (Briggs and Mortar March 2017). The report identifies that there is a significant
need for small attached dwellings (one and two bedroom) to offer additional housing options for a
growing number of small households (p.4).
The proposal is also generally consistent with the overall built form outcomes for the Cooroy and
Lake Macdonald Locality which requires the traditional built form of Cooroy to be retained and for
new developments to complement traditional streetscape and building forms. In this regard the
proposed design is consistent with the visual bulk and architectural scale on nearby land, will not
dominate the street, makes use of verandas, eaves and roof overhangs and generally presents
well articulated facades where garages and carports are not the dominant visual element. The
current design and elevations do not include a sufficient mix of materials reflective of Cooroy’s
traditional built form. Further, the roof form for units 11-17 is quite continuous and further
articulation of the roof form would also assist the development to complement and integrate with
the existing streetscape.
With regards to the proposed built form the following table includes the pertinent development
parameters required by the planning scheme.
 Criteria                         Planning Scheme                   Proposal              Complies
 Site Area                        N/A                               4739 m²               N/A
 Population density               47.39 persons max                 44.39 persons         
 Gross floor area                 1896.4m² max                      1896.4 m²             
 Site cover                       40% max                           40%                   
 Landscaped open space            1329m² min                        1513m²                
 Soft landscaping                 797.4m2 min 60% of total          1296m²                
 Landscaping Setbacks                                                                     


                                                                                     Page 24 of 94

Section 25

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 FEBRUARY 2019


 Criteria                          Planning Scheme                      Proposal               Complies
 Building height
  storeys                        2 storeys max                        1 storey               
  metres                         8 metres                             5.25 metres            
 Boundary setbacks
  Frontage                       6 metres min
    Kauri Street                                                        6 metres               
    Olivine Street                                                      5 metres               X
  Side                           2.6 metres min                       4 metres               
 Length of wall                    15 metres max                        21.1 metres            X
                                                                        (units 9 and 10)
 Roof pitch                        12 degrees                           10 degrees             X
 Eaves                             600mm eaves to 75% of the Complies                          
                                   perimeter of the building
 Carparking                        21 covered min                       21 covered             
                                   6 uncovered min                      8 uncovered            
                                  Table 1 - Development Parameters


As indicated in Table 1 the development generally complies with the planning scheme parameters
with the exception of the setback to Olivine Street, roof pitch and the length of wall attributed to
dwelling units 9 and 10. The proposed variations are addressed below:
Setback to Olivine Street
The siting of the subject site at the corner of Kauri and Olivine streets results in two street frontages,
each requiring a 6.0 metre setback. In this instance the development provides a 6.0 metre setback
to the primary frontage off Kauri Street and a 5.0 metre setback to Olivine Street. The reduced
setback is supported as the development is low rise and maintains opportunity for landscaping
within the setback. The reduced setback will not be intrusive within the streetscape nor is it
considered to result in amenity impacts on surrounding properties.
Roof pitch
The proposed development includes a 10 degree roof pitch which does not comply with the 12
degree roof pitch required by the planning scheme. The planning scheme requires a minimum 12
degree roof pitch in order for roof forms to contribute positively to the local skyline. This matter will
be addressed through a condition of approval.
Length of wall
The frontages of units 9 and 10 comprise a total continual wall length of 21.1 metres, noting a
minor alcove of 1.0 metre width is provided for each unit’s access. This continual plane is not
consistent with the requirements for the Attached Housing Zone as it exceeds the specified wall
length of 15 metres. While this wall plane is directed internally, its location adjacent to the access
driveway and within close proximity of the site frontage means that it will be partially visible from
the street. It is preferred that the plane be further articulated by stepping the façade. Therefore, it
is recommended that a condition be included requiring amended plans which provide for
articulation of the front façade of units 9 and 10.




                                                                                           Page 25 of 94

Section 26

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  12 FEBRUARY 2019


Landscaping
The submitted landscape plan demonstrates that sufficient landscaping area has been provided to
accord with the Noosa Plan’s Landscaping Code. It is noted that the landscape plan includes a
200sqm area for the purpose of a community garden and relies on a mixture of local and non-local
plant species.
The landscaping also provides for landscaping within the Kauri and Olivine Street setbacks which
will soften the development when viewed from the streetscape. The plans identify that fencing to
Kauri and Olivine Streets will primarily consist of 1.8 metre high powder coated metal pool type
fencing. The open form of this fencing will allow for landscaping to be visible from the street.
However, the submitted plans do not provide for landscaping internally to the frontages of units 9
and 10 and generally limited landscaping has been provided to the frontages of the remaining
dwellings. Therefore landscape amenity is reduced in the internal areas of the site and results in a
poor visual outcome for occupants. A condition has been included to require additional landscaping
between the buildings and the internal driveway.
Street vegetation
The development seeks to remove mature native trees (Eucalyptus tereticornis) within the Kauri
and Olivine Street road reserves, which are situated in close proximity to the front boundary. In
addition to their ecological value the trees contribute to the character and amenity of the area. The
following image details the trees within Olivine Street.




                         Photograph 1: View looking south along Olivine Street

                                                                                      Page 26 of 94

Section 27

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 FEBRUARY 2019


The trees have been assessed by Council’s Ecologist and are a significant species in the locality
being a primary koala food tree. The trees also contribute significantly to the streetscape and the
character of the area. The following plan identifies the trees proposed to be removed by the
applicant which Council officers have identified as being suitable for retention. These trees are
highlighted in yellow on the plan.




                     Figure 5– Trees proposed to be removed that must be retained

An Information Request was sent to the applicant in November 2018 and raised the following
issues around the trees:
     Provide amended plans showing the retention of mature trees along the Olivine and Kauri
     Street frontage with boundary fencing located to accommodate the mature trees.
     Provide an assessment by a certified arborist using the ISA Tree Risk Assessment
     Framework regarding the works necessary to retain the mature native trees along the
     frontages during operational works and the use of the premises.
     Provide amended plans showing the crossover on Olivine Street outside the tree protection
     zone of the mature gumtree
     Provide a landscape concept plan which identifies the retention of the native mature trees in
     the road reserve, signature landscape trees, frontage treatments, provision of shade trees
     within the development area and overall soft landscaping provided within the site.
In response to the Information Request the applicant advised that:
     Landscaping Plans are currently being prepared and will be emailed to Council early next
     week (26 Nov). The landscaping plan will recommend offset planting for any mature tree
     removed. The mature trees on the actual boundary are mostly inside the property and cannot
     be retained as part of the fence design without significantly impacting buildings and
     infrastructure.




                                                                                     Page 27 of 94

Section 28

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 FEBRUARY 2019


      The remaining mature trees to be retained on the frontage (as per plan) will be protected and
      more native trees planted during OpWks. Council can condition a tree risk assessment for
      the remaining trees if the landscape plan does not satisfy the information request.
      Reaffirming the landscaping plan will recommend offset native planting on the frontage for
      any mature tree removed. Long term the landscaping and new plantings will improve the
      property frontage.
      Retaining the mature gum could not be achieved, the tree protection zone could not be
      achieved. The size of the tree requires a very large tree protection zone. The age of the tree
      is a significant risk to persons and property and council’s liability with the increased
      pedestrians, vehicles and buildings being exposed to aging falling limbs. The tree is not
      mapped in a biodiversity overlay so it is also preferred koalas are not encouraged into a
      developing urban area exposing themselves to being hit by vehicles or domestic dog attacks.
Prior to proceeding to notification the applicant did not provide an assessment of the mature native
trees by a certified arborist and appears to have made assumptions regarding the retention of the
trees based on the proposed development layout. The purpose of the Information Request was for
the applicant to retain the significant landscape trees and recognise that boundary fencing and
proposed development layout may require alteration to accommodate the retention of the trees.
After the completion of the notification period and being advised the officer recommendation would
likely be for a Preliminary Approval, the applicant provided an arborist report. The arborist report
makes comment on the retention of the trees based on the previously supplied layout but does not
specifically address the information request items and does not provide an amended layout. The
report details activities within 50% of the Tree Protection Zone of Trees 2 and 3 (adjacent to units
13 and 17) however provides no recommendations for the amendment of the layout to reduce the
amount of intrusion into the Tree Protection Zones. The recommendations within the report are
based on the submitted layout plan and do not provide Council assessment officers with sufficient
information to support the removal of trees.
It is noted that amendment to the development layout would safely allow for the retention of the
trees. Though it is unclear as to the specifics of the modifications required and the resultant impact
on layout and yield, it is likely that the retention of the trees will result in an amendment to the
location of the access driveway to Olivine Street and potentially to the setback of units adjacent to
Olivine Street.
4.    CONSULTATION
4.1. Referral Agencies
No referrals were required to any Referral Agencies.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
    Environment Officer
    Coordinator Engineering
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. Three properly made submissions were received. The following table provides a summary
and assessment of the issues raised by submitters.

 Matters Raised                                   Comments
 Environment                                      It is agreed that the proposed layout will require the
 Destruction of trees and habitat for kangaroos   removal of a number of existing mature native trees. The
 and several bird species                         applicant provided an arborist report after the notification
                                                  period assessing the impact of the proposed layout on
 An Environmental Impact Survey should be
                                                  the mature native trees within the road reserve. It is
 provided

                                                                                              Page 28 of 94

Section 29

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          12 FEBRUARY 2019


 Matters Raised                                       Comments
 Cap of 10 units should be imposed with trees         recommended that trees within the road reserve and on
 retained                                             the common boundary with the road reserve be retained.
 Trees on Council road reserve should not be
 removed
 Traffic                                              Conditions require the upgrade of the frontages of the site
 Child safety                                         to Kauri Street and Olivine Street including road
                                                      widening, new kerb and channel works and 2.0m wide
 Olivine Street needs to be widened for two
                                                      pathway. The works will provide a safer traffic
 cars with capacity for cyclist and a pedestrian
                                                      environment.
 path
                                                      Car parking will be provided on site in accordance with
 Lack of road infrastructure for additional traffic
                                                      the requirements of the Noosa Plan.
 Lack of parking for additional cars
                                                      It would be unreasonable to prohibit access on to Olivine
 Increased risk to road users                         Street and the additional traffic is not considered to be
 Existing car parking problem in the area             significant.
 Access onto Olivine Street will result in major
 impact on traffic in area
 Amenity                                              The site is zoned Attached Housing and the proposed
 Impact on the amenity of the area                    Multiple Housing Type 4 development is a consistent use
                                                      within this zone. The proposal complies with the Noosa
 Loss of town character
                                                      Plan provisions regarding building height, density, site
 Size of the proposed development and impact          cover and gross floor area. The proposed built form is low
 on traffic, noise levels                             scale/single storey and consistent in scale with the
 Too many units                                       established character of the area including varied roof
                                                      form and eaves. Conditions require that materials and
                                                      colours of the development provide natural tones and
                                                      additional articulation and landscaping. It is
                                                      acknowledged that the proposed removal of trees on the
                                                      common boundary and within the road reserve will have
                                                      a detrimental impact on the character and amenity of the
                                                      area. Accordingly it is recommended that a preliminary
                                                      approval be issued with conditions requiring the retention
                                                      of the trees and further landscaping.
 Other                                                A condition of approval will require the developer to
 Possible drainage issues                             appropriately manage stormwater with the works also
                                                      subject to a further Operational Works application.

5.    CONCLUSION & REASONS FOR DECISION
The application proposes to develop 17 dwelling units on land situated at the corner of Kauri and
Olivine Streets in Cooroy. The land is zoned Attached Housing and is situated within close
proximity of the eastern side of the Cooroy township. The provision of 13 x 2 bedroom dwelling
units within the total number of units is consistent with the dwelling type for which a need has been
identified in Council’s Housing Needs Assessment (Briggs and Mortar March 2017).
The development generally complies with the relevant provisions of the Noosa Plan subject to
some minor design amendments to ensure the development better complements the traditional
streetscape and building forms of Cooroy.
The proposed development layout would also result in the removal of 3 mature native trees within
the Olivine Street road reserve which make a significant contribution to the character and amenity
of the area. Due to the impact of the proposed development on the vegetation within the road
reserve and the likelihood for a modified layout, it is recommended that a Preliminary Approval be
issued.




                                                                                                 Page 29 of 94

Section 30

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 FEBRUARY 2019


A Preliminary Approval would require the applicant to submit a further development application
which demonstrates compliance with the conditions of the Preliminary Approval. Alternatively, the
applicant may lodge representations to the Preliminary Approval seeking that a Development
Permit be issued during the negotiated decision period.

Departments/Sections Consulted:
     Chief Executive Officer      x   Community Services                          Corporate Services
     Executive Officer                Community Development                       Financial Services
     Executive Support                Community Facilities                        ICT
                                      Libraries & Galleries                       Procurement & Fleet
                                      Local Laws                                  Property
                                  x   Waste & Environmental Health                Revenue Services

     Executive Services           x   Environment & Sustainable Development   x   Infrastructure Services
     Community Engagement             Building & Plumbing Services                Asset Management
     Customer Service             x   Development Assessment                      Buildings and Facilities
     Governance                       Economic Development                        Civil Operations
     People and Culture               Environmental Services                      Disaster Management
                                      Strategic Land Use Planning             x   Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 30 of 94

Section 31

Page 31 of 94

=      —_        ST           BRB            55.1
' z er.          id Rie          ‘  Bg bat .                                                                                            eee      oe
 Sa       ae ° phe. Pie    Se      ye}    way “a                                                     ae                                 ie SPS     es ee
» ae   bs  4°  cca Y iT ie    Se 1 5     sey Se,    on                                       . es % ax    7                             se ae     a  el   < RS
          “t      paki   hoe 8        Pa?        Fs                                         pa      eas                               ye            Be   ee
 . eC      as   ls Natce        ch a oS ois                                                 Loe     aay ua                             Setee        Fri
5   AN        TF        OS      | Se      aed a                                            .     re ee                                ats     at ie Bs                 BAe
~      ey               ae                                                                                                                                          dae
meter        :       ae                   St wi                 7              Z       Pes                   .                a 0        Se                           “i
     ee                ‘a                wae:                                           aa                          .           fee      coe y           o              "            :
      aes                  *         y mi e                :         2                     t                                     3              '        tt            .             Ss ti
 -        7                                        *   —             ;                    u °                         =        bt               “n   am                            tet
   7 =      -             ’           .                    =,                       3      at                                          =                d                                i
                                         :   Se   es                =            a> fe      :                             ,     ae a                                      “4          ‘
                        re          hs      ee                IE — is                    wr                       ee                                    ee       ee                    oe
                            "        .  :   !                    i        b tae |                     am           >                                 es               ow              T
                                    HRM               |     ee                                                                                      fi   .

    i                aes Yb     A ET                                        =       rp                                                         7         17 UNITS
                :       4 \ 2        ee fos                               “Sill                                               ee                         13X 2 BEDROOM, 2 BATHROOM & 1 GARAGE
               " wd       ay    ea    : ioe                                a                                             :      ee                       4 X 2 BEDROOM, 2 BATHROOM & DOUBLE GARAGE
                  -~ <p> ae    wee 9" a9                               eae 72)                                             ie n BS ‘
                     2                                                   eC                                                 )
                   <a ¥  KS   .                                        i) oe          x
      r                                  :        =                     he                                         atl                   :
     .                    Ee                _                   a                                                                  —
                         :                                                                                                           :      I
                                                                                               :                                  er           3          ae
        —                                    |                  a                                                   ra:                                   i a
                                                                                                 b>                                   oc.     “
                ‘       =                                                                    4                                 ‘i  Pe                    [SITE PLAN- LANDSCAPING AND FENCING —[DA03_|
               mo                                                                          ~                                                              [STEELEVATIONS AE
                                                                                                                                                          [STEELEVATONS—_— “s——S——sSéd AS |
                                                    —       PP toe pts                                                                                   JUNE TSO

                                                                                                       ON   was       ARCHITECTURAL        PH. 0405 097 553                          o
                                                                                                         oe cette      BUILDING DESIGN __ [email protected]                         =
                         s   ‘                                                                        PROPERTY OF ALL DESIGN RESIDENTIAL   www.alldd.com.au
        Proposed Multi Unit Development         Calezac Pty Ltd                                       Toeecones,acrames COMMERCIAL         VBA DP-AD 37989                           e
        Attached Zone                           25 Kauri Street, Cooroy, QLD 4563                     PURPOSE AL WON   RENOVATIONS         QBCC 1084590                             s
                                                Lot 27 C56016                                         Faanes FURMTURE vex <<                                   ha                   3
                                                Area 4741m?                                           SeSc           (Q) REGISTERED            wnGreensmart’                         :
                                                                                                      CLES, DOOR AND WINDOW oy, st                               ‘~
                                                                                                      PRESENTATION    ss) Building Practitioner    reen           rt
                                                                                                      PURPOSED ONLY     Ly      "8                        PROFESSIONAL   ALL DESIGN
                                                                                                                                                                           Page 31 of 94

Section 32

Page 32 of 94

LXV fp
                                      LKXGS ff
                                     hoy Ax                                                                       5
                                     LLP   XXX                                                                    c
                                    Se    x“                                                                     £
                                   (x,    xxx)
                                  OLY _ RRR LLS                                                                  z
                                 J. oy  AX NGNESRINEX OO
                                } jp   Neve                                                                       6
                                JSP _ KER RRL,
                              prey    LXKK KKK KKK KD                                                             7.
                              py     LX KIKE KK   KKK,
                             bone    KSEE         RL                                                             s
                             USE >  KISIEP EE KK DOXGQD
                            GEIS OOPS PROOOSOO     SOO                                                            £
                           ORGAN                                                                                  C
                          be bY SGESXSLE EA REESE     oD
                         fi ky  N OLR PLRLLRL ROO     Y BOX                                              ALL DESIGN
                         boxe   PRESSEK REE           LK
                        boxy   J ROSS SON                                                             ARCHITECTURAL BUILDING
                       BLY     /  PRES  OOOOOOO          OY                                           RESIDENTIAL, COMMERCIAL &
                      hey     YL NERS GERK              ERK                                           RENOVATIONS.
                     LK                   PRR              Od                                                      sa
                    AL       LY ,         RR |             PESO                                      PH. 0405 007 553 "“MGreenSmart”
                   Jp Xp    YA.           POSEN            OX                                         [email protected]
                   LI     hfe  Yo.        Y SSO            OOOO
                 bX       VJ               Pe               eK                                        Vea DPA s7080 (©) mesteneo
                  fy :  Yg                (A ZX               eesens
                A ~Of         Z|          "   A Se          OOOO                                      QBCC 1024500 —
              CIS Ye .      Zi         Ye 4   is ROOOOPROK OO   Cx                                      ‘THIS DRAWING I THE COPYRIGHT AND
             bi fp Ald,                  AGU SEER                                                     =|
            hgy      YY                  Vi       SEK            RD
          hoy      WO                   Ye, Ye Jb Jr SESE SEEGER OOY                                  Cent
         Va         "Yeh                        Jo- BRS ESSE        LOD                                Calezac Pty Ltd
                                        pe          PRS   S  x        S
        pxY         4 \) V7 VY         Y,           IRE REE         ZEKE
       AX             A                              RSE SOR         O_”
      ELS         YY                   J               BRE 1 OOS
     LLY       /  If                                   SRE,            AKG                            Pape
    pp                                                 KR SORRELL RR LER
   ppp            H                                    r LER         LIOR                              Proposed Residential Multi
  fig                                                             LPLPERXRQQD                           ~
 ig          CS                              WV        POORESE ASS                                     vt Deen
fi)          SAI           Y         L)         ALLAN       Xo REERNSS LY
 LY               4                                                Z    SS  SS
>               Y ULLAL SA l.ldd te Le tj Le.lL CISL                   ADEL AA                        Ta aaa guapnawgnue
bf                                                             re                                     fesemeracreremen |
OK                                                            ee
ex                                                            DX 4                                       ;
Yd                                                            BS                                      acres
 SOR                                                                                                   2 Kou Stroct
  NER EEE            IPP Po EPP En Ro JP Pg Rp Pn Fa Rr Pag PNP Pg  Po Po Fn Pd                        Cooroy
   (1) SBSING SITE PLAN
        Tx °°...                                                                                      Property Details:
                                                                                                       Lot 27 C56016
                                                                                                       Area 4741m?
                                                                                                     | No.[ issue Detais ate
                                                                                                      Po
                                                                                                      Po
                                                                                                      es
                                                                                                      Po
                                                                                                      po
                                                                                                      Po
                                                                                                      Po
                                                                                                      po
                                                                                                      Po         of
                                                                                                       SITE CALCULATIONS &
                                                                                                       STAGING PLAN

                                                                                                           Page 32 of 94

Section 33

Page 33 of 94

a
                                                                                                   PRIVATE OPEN SPACE                     £
                                                                                                   Far Mitele ousina Types 2 an 2, each duesing unt =
                                                                .                                  Drovides for landscaped prvate open space ©
                       %                          Vi                                               a3) for unis at round level a minimum area of 25m2 e
                        *                                     S                                    excuse of the clothes arving area. wih mnium i
                          %           ax      é (           y2N                                     Quen an a mem gant 1 1                7.
                                      \ baad | ey e         Ke                                      Lek PRIVATE OPEN SPACE                &
                                             ‘£ EY                                                 Zz INDICATED ON SITE PLAN
                                                                                                      “+ (REFER ALSO TIA FLOOR PLAN FOR DETAIL)
                 s      e                      S         cman    47 XS                                  CLOTES DRYINGAREA       ALL DESIGN
              vo                                                     Se                             OD SE arse              |igammeymacangem
                                                         _-          Boss
                                                   _-—7     \7          ioe                         510.2 For Muftpie housing Types 2 and 4, the private open RENOVATIONS. i
                                                                         <a                         space aea a Pons lve! enciosed by side and rer "4GreenSmart™
                              gS                 XA                     OD      re                 [sroecdping can sean he equvacrt oF So% ore heat of fold com au —
                             ee     NRoinc/-                    2 USLRED Pd                        the pulang on maturtty to protect the privacy of residents. www.alidd.com.au etm nscuTenep
                           S              eS        X        ;        FESO                         UNITS 1-8 1.8m CLOSED PRIVACY FENCE ON PROPERTY eee vouan ©xsteas
                      Oo fBIO NE DNR                                 eo    SO        &         ,    STARE er | OSS ee eee
                             (ff            Mig  Ee               gern:        ese            e     out
                         Z              See               AN                  ASO                   meemeremenenses..     | "Calezac Pry Lid
                     _ (fr                  \A    fea Sa ey LRN                      D>  as         is provided within or atached to each dweling unit
                  _Y     Kk                 Oy}          OR                        BD               a
               _-         ee)                      a   - ND \S            vo         SO            Dulling and does not exceed an area of 7m2
                                  ENEFS    A        pees      ERE               U5 CS
                        Se      Kees               an NU                             SEO         uM Bie                     Prec          oo
                   C       ON, SSE                 ett |      OK. NON                 SAN                                   Proposed Residential Multi
            LR                                            Pal it              A> x                                           aa
                                 a]                    aT |    no,         +          Oe ASO                                 UI
                 Lo  PeeeD NEA ‘OF      Ts U10 ug Tet           at SS     *      %      CEs                                   nit Development
       —        a                                         |                        eS        SO
         __ftsestuc/ >           OS                             Sh oe NONE                   AX      %
    _-          f8Y>              7                              tS                  Wag                                      =a
              RON NGS eg en                          ge PP EE OAT            XN     eg   oS      ROG
             LK     SS Ce    2 Faye ty le    A  eT      |? = oitete elf TY aX)                     Vy GO» *
             F      xd)        ee             Oe                ee IN WN \                    gi       LE                   "Tot 27 C56016
               DADS     en a     ee ee ee ee    ee ee ee     Te               pads Ks 4                 A
                        ost              ROPER             REPR           AL  Ne SON                    SEA                  Area 4741m?
  Sey                                                                           ON       Na          URS \ A
TRUNCATION?          3        T1Al   T1A      THB:    718:     ul        T2      Ms  an       ha    vs   ey    Q\       >   (S=_ 0a oe
                f                                                                   oe               4                *    fp mscecet arenas
               gz            U12 —U13        U14        U15 U16, 2U17             SN     NAB         ME,          K2X       a
   /     by 2».     Skee       memes |        oer    BA.         et            Pt ANN              T4.. 1G CN              is [Bevecnes   ids |
 MA LZ                 ZAZA                                              RN Y                                  SONY         E-=_
  oo     =                                  =                       Nf                :    rae                              pe           rei]
      7                                U7                            g    ig       yo as 4                  Gu TREE TOBE REMOVED Pp
    :                               -                               |    Bo                RB       Py
  “                              “7                                       b--              EL]      ey
                                                            =         -                          "4
                            Eh
                                                             NEW KERB  ROAD EDGE
                          /                                   7                               /                   4
   Ou                                      OLIVINE STREET    /                               oy                 -
                                                                                                                                  Page 33 of 94

Section 34

Page 34 of 94

.                                           FENCE LEGEND
                                                        Vi                                                                                                £
                        %                              “SS                                                                                                =
                         Oy,                      iy        ~                                                     “ FOUONG BETWEEN tm                     5
                                                      SN |                                                           neces
                                                  JO       fl> swece        AD                                       =                                    e
                                                    ‘S   a       a        4                                                                               s
                  s*                              20 of                        RR                                 aan                                     f
              /                    K             ZS      > >                         *                               aac                       ALL DESIGN
                                                                                           .                         :                    ARCHITECTURAL BUILDING DESIGN
                                  x      Z      a ~      —                   2 DN        se                         NEIGHBOUR FENCE       RESIDENTIAL, COMMERCIAL &
                               &        cron        4                   a    e CED       2                        F3 COLOURBOND STE.       RENOVATIONS.     im
                              S            Yo re                    d          7        NN 2                        TOINASTE INCLOSURE    Pu. oagsoe7 sss ““GreenSmart”
                           F LETTER Boxes    «fF.               Ve                                                                     “|  [email protected] —
                                 Lf         J 4 <P            »                     Pos                          LANDSCAPING               www-alldd.com.2u erm
                          we    Schessoen sfnren NS a aS      WY”  P:         S      SAS      °                   Type 4 Conventional      BCC 1084800 Que
                                                coe               Ss                Co                          —E_r                                    REGISTERED
                                 =        Vy      ee   he              er              SD                        Provided that a minimum of 60% of ths Is soft andecapng. Ox ae he
                                     -           oS Le 1 EP ote      Ds               PA    108.35                2) Standarc- the proposed population muttiolied by 40m2.
                             /                        aeetes                            :                         —                                   ie
                      ©           5     Y,    F2  o> “a: 4 i ‘ : al ~ * wo a                LD»                   2       wma   argo Soh    RETAINED OR USED FOR.
                 ao           2 >    VF              Tol           . a SS          }                 °            tyonesur_—onwcntetenage agacentte ueoverea | CH=
                                     A: ‘       ZY           ™~ A wiwacyy \                     oN                wistor carparking.       Calezac Pty Ltd
                       ceteris                N\A        pe                NN                  EH            eo   Dertanaree—onwm
                                 WAT          Ts         FE     fe oo                          Ss        \e       C] on
                      =                       Pray       ISSnEER is    .  : : " . . , i        Ate™
                   >        ™                 a       Ug -      | = | “tA          :     Ce We                     FA                      Project
            Sonn     >       VY     wwuuititiam                            ote NGA       ie         :   fy     _       TARO UAESCHENS      Proposed Residential Multi
      --%      mez Tone <   Y       hs il                        |        ee    ga \\eer Ve                        —                        Unit Development
    ~           FEMOVED VS            Ay                           Si:  tS SOR ea c= ALN                 f0310™m                            Attached Z:
       Y         a                   (5 uu |    RESRIERESR               ere Tl tN                          A                                      one
       oY fp              yA, > “—— Se              ce te                      te      XS                 PHN       =
          0                              en                                                                                                  =
          a, >       J  i       GF    INE ta soa Se Lg ohio Metin UZ ts”                       Ps           NG           ra                Adaress:
 Arun                     SS eae Ste Se eh te es ad                                                           w                            25 Kauri Street
gp BOUNEAR                b.       ry      7        AT     | =          DL      rea     : x NS                     Li rien                 Cooroy
/               VY        PPR                                  e                >                        So)                                QLD 4563
Yo            J    &      HI    R             Reger               REBR            EH   L os - \                      aN,      oo
                     \                                  oH                                Orrraree >     .      U1K5                      property Detale:
         lf     £ 2     |r        Tal | Tia         vis fy Ef 16      TIA         mn      |e es         a        = yo                  _ | Lot27 c56016
        ‘)    &                                         iis                                   ve tS       be    75 hy               s      Area 4741m?
      a    a         =            U124-2U13)_U14)44 015) U1642U17                           SN
         7                                              Mm                                     a    Le    A       ya                ~
       7            Eo              ay               Be                  J==-==f-==-|             oo. Oy ;                               [Ne] teaueSewis oat
                    core               = noon          Soe Peer            Soe                    vA Le,       c >                 Fi
ey 4   \           2          ey      ria      | |   bree a       106.60 m EC         aac           . rs Ly or pos                          fe
     4, A                =    a,           .   Le    A        A    CH   n   rR    *    =            \   43    fa         n                fo
  S       ~           .                                                                               MN                                    Po
;   eS        <=             cr             se          cry       eo         i            =    7 Teer it       Cys           TS    TY pf
       -—  >,                                                                                             di                               en            ee eee
          7                            ~~                               STORAGE 7                     ™      -                               _
,    Le   7                      a     Oe ate Seti]                   PEORIA SS        TF em      AT   or”          ———  curr To se Rewove                or
 < 4    Y           FENCING SETBACK Im AND ARTICULATED EVERY’ Sm >           < I     v=               Age    a                                          ee
   7,                                    ar                                        77                 ABN        Z
                1m DENSELY LANDSCAPED STRIP INSIDE BOUNDARY, OUTSIDE 1.8m ARTICULATED OPEN POOL SYTLE FENCING i - /                       PT
                                                                           ee                          >+—=-                               SITE PLAN -
                                                                  I                                                                        LANDSCAPING AND
                             )                                      NEWIERE     ROAD EDGE                Y                      y          FENCING
    (1) SE PLAN PLAN         ‘                  OLIVINE STREET      “                                   7                    a
                                                                                                                                                          ingicated A3
                                                                                                                                                  Page 34 of 94

Section 35

Page 35 of 94

8-12            7-714           6-T1A            ST1B              4.718            371A           271A            1-718
                  SS. bein at                                                                                           ed
                                                           ;                        A      cs  ER   Me      et | |     j  oa scar       108.50 m} | 109.50 mil Petar .
                        =                                 A a             }           ae       Peace     108.20 mj} 10820 meee Aaa A       es         nanan
                   mi A                            | | [aceboy            fj) ng reer et                  a             —                 os

                (a) urs 1-8 FRONT ELEVATION
                     1:200
     \                  1-718          271A            oj              4718               511B            6T1A       P\   T-TIA             812
    We                         ft                                                               nT                 f      \
    wa                mee                         Seay                           ,                                         a
     a             S|         ight kt deat              “x gor | a              Tin sn mandate:                                    3
       ”              aera                        I   hi          | dle    vy    .        Laila:           iy                oe          ft    z
                                                           ;    ;       =             rr    a ae a A aoe el    i         ‘Fare   a        WT     ae   HE i       Sl
                                                                                               en                         ree        H    errr Arescrredlll        thy
               (2) urs 1-8 REAR ELEVATION
                     1:200                             4             10-14             O14
                                                           0                             or
                                                      f                                       I
                                                        a) se]. ul?
                                   (3) Yults 9-10 FRONT ELEVATION
                                         12200
                                                                        oT4             10-14          Vig
                                                            a               a |                         4
                                                                         ee      eed «2
                                                            CU                   |                    si
                                   (4) Yuts 9-10 REAR ELEVATION
          2              BUILDING DESIGN | Gs                                                                      a
          &           nm     ei        Calezac Pty Ltd                         25 Kauri Street, Cooroy, QLD 4563   i —fpewsees         Tara] =
          : ™*GreenSmart’ RENOVATIONS                                          Property Detals:                      Ee -———
                                                                                                                      [pains
                                                                                                                      Et
          -               px.o10s 007883 |" Proposed Mulfi Unit Developmen     Lot 27 C56016                                                                            or
          3   @           info                     i Unit Devel  t                                                    | —____________]
          :  Ouse crencicna, | Atached Zone                                   Area 474 1m                                                    oe                            |
                                                                                  THS DRAWING IE THE COPYRIGHT AND PROPOERTY OF rs Po
ALL DESIGN                QBCC 1084520 Not for BA or Construction              ©) Nar iosd Cones nevane OR UseD Fon ANOTHER PURDOSE S——_, —paegee            ome
                                                                                                                                                            Page 35 of 94

Section 36

Page 36 of 94

\          17-12          16-14         15-18                1441B          134A          124A              W335
                          =            Eee ad ,                                                                                     a
                     —              See | 108,70 mieten                  es .         = i Lad            ae |                  pe              aq
                                                               oS i       bark tee    5      J AN Wel ao ee                       A         mat
      (4) UNITS 11-17 FRONT ELEVATION
            12200
          a              171-73            12-T1A        13-T1A          14.718              1ST1B          16-T1A         17-12  4a
               )              I                     |               [ny                                                               :         -
                      |                             SS SSS                                     Pa                          a athe |           VE
                a                                                                 ss a           Sad:       oe               Teale | | Ll          :
             + ate                   ;                       iy jd     P                     HL      . it he  |         901 Reet Seer            .
          Fi     a4 Be      3    alate fo              a Ly add Aca           A            i   Ta a                                   en       ro
           et    eee) ee          er ose             MMR    3 hh  Ate a   FS                                                                -
     (2) VN   S 11-17 REAR ELEVATION
          1:

         D              ARCHITECTURAL [cent                              ra                                aT
         £          pe aeRO | Calezac Py Lid                             25 Kauri Street, Cooroy, QLD 4563  fox               Brana   ERE
         : “"*GreenSmart’ RENOVATIONS                                   Property Detals:                   [>
                                                                                                             a
                                                                                                             _
                  nena             nae                                                                                                 stn                    |
         B    GPMESTEN Neasiddcona. | Proposed Multi Unit Development    bot 2G                            pf                       eareniesve ae      aaa |
         E QeaIEe somtens | tached Zone                                 Area 474 1m                                              i
                        VBA DP-AD 37989              -                      THS DRAWING IS THE COPYRIGHT AND PROPOERTY OF ALLDO (Ti SS Drawing no. DAOS
ALL DESIGN              QBCC 1084500 Not for BA or Construction          © NOT TO BE COPIED, RETAINED OR UEED FOR ANOTHER PURPOSE    rrr
                                                                                                                                              Page 36 of 94

Section 37

Page 37 of 94

7500
 EomcioseD

       3                     5     BX)
     =                  S          P|           8                            =
           Le     ZZ.                                    1   ah               4                         oe       tt
                         ec        al                          ee                                      5       Prey ak      bd
        3       gio|                                     iga4a2                   lh                    Haass eS
               ha               Al                  TYPE 1A FRONT                                   TYPE 1A REAR
             tt |                              (2) TYEE TA FRONT                               (3) REE IA REAR
             ]   -          [| .-
             RETRACTABLE
        TH     =                        |:
                                                        m4                4
        8    wrk ELT                                    =    ai                                                                     :
        .                   KITCHEN                                                                 :               ———____
                 ie)       —               é
                Ces!       Cjpry |         |!                                                       =) Fal           a
        .              :   Lite i,                        ‘                                               -            fl
        &      ce               -                                                       }
           ——        RAP        STORAS                    i \   —                       t                                    x
           rt eT yy                                        ue    2                      }                    ok    «                  i
           Por                a                                                                             SEL                     !
                             TN                                                       —
                              aa                            1A FRONT                                  REAR
        Jo= ]                (Ce                         ow                                     Ouse
                             Yad       |:
            a          (ek
                  SS   eee   = J
        |  (e+
                                    ot                                              =—
                                                   [ORT IRPORE
        Ou             (Ox08                         a                               OO
                                                    [UNTIALOWER [7am
                                                    [UNITTIAGARAGE fig]
         D             ARCHITECTURAL                                naaress:                       a
         ¢          mn Besoentia “Calezac Pty Ltd                  25 Kauri Street, Cooroy, QLD 4563 ——eaoa77“e
 C       Sr eeModand ReNowrows |                                    papain                             ie
                    a  COMMERCIAL                                                                  Po
          3s ff        PH. 0405 087 553 | Proposed Multi Unit Development Lot 27 C56016            ee re 1                            ne
         E  (G)REGISTERED niogaiddcom.au | Pee                      Area 4741?                                             oc                      |
         % Om         VBA DP-AD 37089   Zone                           THES DRAWING IS THE COPYRIGHT AND PROPOERTY OF ALLDO. IT es ee           =
ALL DESIGN              BCC tesa                                    © irswumetsmmermeremsns Awe’ | Fp ornate
                                                                                                                                      Page 37 of 94

Section 38

Page 38 of 94

>                 FT           Tt
                    S
                ae
               75            70
         |
         TR Th
     *)  ese                                                 Sa                  ==                                        ,                 =
         ae                 [Al                            g     1          Aw               FR            e|    ame            |      4 !
                                                                                             *                                              1  ?
          Ty             Li"                                      ere         =             hk                     ddd doe
                                                                                                                       2      S|      Co    |
      8|  |r BED2                                      (2) TYPE 1B FRONT                                 (4) TYRE 18 REAR
         !                    =|
               ey TT
      ]    fom EE                 p
  eo          apes                                                                                   __
     |    Joe            “er |):                                                    _                      —
                         _              .
          —————           | ie                                           —                                            _——
           ie             ———                                     —                                                             =
          oo          — | 20rstowe                            3}    [S                     :                                 i
         |                GARAGE                                :                                                            We
      -| 1 |/                                                                            J                                   i
     5]   fH  E01                      .                                                    LL      |
         al           4                g                                        ——=             =       $$
          Doe       =e                 é                     (3) RPE 1B SIDE
                                       &
     g     LANDSCAPING                                                       :                           ht
                       2 U          U         om =      5  .                                          J \~           a                 ee ——
      Owe            és                    =e" —                          “rr.                      ra tl          |                              rT
                                                       |        ‘              |    ei              Uae             |
                                                        . é   P   ‘                4   ‘i                           +                             i
                                                   ry clit iy          |                                     gy            .
                                           ee      es ys                                —_                    -              te
 [UNTISPORCH _—~iem_|                                 5   Ei Erdin. dg A            —        SF                     —             SS
 luwrieeano   [an]                                             ———                  7          -
  [UNTIBLOWER 75m                        (G) IBERONT                                             (6) IBREAR.
         >             ARCHITECTURAL [cue                           soarese                          Pfam a] UNIT TYPE
        Z         J RESDENTAL | Calezac Pty Ltd                     25 Kauri Street, Cooroy, QLD 4563 E—foeesees      fears] UNIT TYPE T1B
                                                                                                       [Devesped —— —tC—~—~—“‘C*SCSC‘*id‘ SD ‘|
        E mcreensmart SaMERCAL                                        a                                                   ee
        Be vwcenen               Soa      win Ue                        ee oe                        fesse fu [romiameer
        2   e&         :           Proposed Multi Unit Development                                     present         lasers [curentiemse ose —~~~=«SOS20T8
         E Oreste sfeQaiddcom ay        Zone                         Area 4741m?                     Kee             eee                            ee 7-100
                      VBA DP-AD 37989             _                     THIS DRAWING IS THE COPYRIGHT AND PROPOERTY OF ALLDO. IT IS Pf rw no. DaAgS
ALL DESIGN            Cece Teta                                      © GASES             MEALS | egret
                                                                                                                                         Page 38 of 94

Section 39

Page 39 of 94

F              ale 3 g                               m0     1890 Ce      so
    7@)           aes]        ©                      ttt
    pe                   |e)  i                    ALT                      cor
    ¢ and drafting       g    ale                 Si      |   por     sz            A
      as                 a|   hk               Aas |          pe               a! Ie
      Oe | es                                 ex              5    aR
      A i            s|   |e             ro.        a                               See
                                           AN ae cE                                 =e
       ig AR         =|   |5      2)» 4 FP                                          ae
           ae             :           ALA                              tls     OR
    S8iz2 825        als             ;                 TI                   5        yi  (2)
    oat un           8                        ee         _   tt               |     y
           a                          |  CB . Acs                                   |
     .        “|     fa  fF         i |   a           : Ruz                 —_
    geil     gt)    Ff                   eecenieecs,   "Lae                Co
         3                                                                  a
        i    5                        |  (|) JB)       5L_ke               Hon          g
      BE     2                           os a          2 eee — re
        e    Og        a                        )          Ped      Pe
    ;   5              =                   6900 UNE OF SOLLION
    |  8                             tte
        9                                       0           an        ao        360
        q        @)                                                     |
                    :                                              © fire
                    6                                               as   la
                    Ss                                               m
                                                                     7
                                                                     a
    Orgy     Be                                                           :
    LF ss    Bi                                       270 7          z  5         |
    HSL E go            '                         | _            :      |
       wo               |        |             oO   =            |          +
    8                   |                      Se  Hl
    a        w                  |  1
    i                             a                |                     pnt
      PPE    TT               ae   | ||            |      ;    |
                                                   l   . =     |        en  ~.  ~
       Te               |         \\ |               oft                fom 1
         RAE              a                        |               ©
                 (©)     =        | l              |             |  ‘i    i      |
                   E     BS         \\              ec               ip
        statatutiete g             | |             kaa  *     |      a  ~        §
                                    \              +          |
    [ea                  |                         ay                ig
        acolo | aan]                             Be     a}   !          ba
     THE                     4     |               |.    #F                      oe
0                        |_|        \                      :             fe
&    g                   \   |      \                                    ba |_|
@                        \.  {|__| _%& |                                 ne      }
&       x               =—=| =       n\                                  “im     §
©       He              =a           4                                  Pind     i
°       8/8               =                                             '
©                         ry

Section 40

Page 40 of 94

7     B  1
        py LR i                        ae
     Lt | ttt yl
     Celt           ume      ET          r                                                            y
     tit          [4                      !                            /                                                    ee a
     LIT     si I                                                  mig     Lr                          ]          i                                     |.
             Lem                 F                          |)         Sie ah                                      = lal                           A
      4     sf  4+ \EaT          He)          z                    OP      ae               Ff |                i        hey       ke - Pe   a a iy ~
                         KITCHEN  [JENS] wir                         2 ie ee                                               -        ;        ee!)
               ee     su         Fsetetsy
             yyy —__             Ee                          (2)   RES FRONT                              (@) TYRES REAR
                                         Hae                      4:100                                        1: 100
            LL                   Fog         "|                              soma
           8         BED 2       r        r   =   &
            Wi   I              fore]                                                                                   |
            me                                                                        a                    ===
                            eT     GARAGE                               7     seen          +     |    -aa                a             sy
                      we            ry                                     3]   TiCwmes      Ll eh      es          af       a0          |
              +—=—+                 \    ||   aE                                     C     J                    ee      ve
                                i   1  |        :                            ta              qeawdeaaidas |
                                                                                = 4)        ip a   =      an     |   ae
                                7   ry   0      &
                                    ="                                  (4) REE 3 SIDE
                            2                                                 1: 100
         (4) YN
              1:100      (ah         SS
                                         ¥ T       ——P. :     =                                                  :                  i
                                                   |             .           Pea,                        Se         es       rg =                  7   8
                                      |            —       '   hy  |   mg    ee    she     re i   3        |    rt    <e     } H   j    sof mame, Fe I   ,
                                                         =|   a           ba ifn rye eH "ee pi ee   2             !  =  .    FF  1 ‘fo ie 2 ee     = eay
UNIT 3 PORCH La                        |           = — = i Pk a                LS      ————                SSS    a ee  oe i  ar kk A     vil
[DRT sGaRAce ————]
                                              (6) SERONT                                                          (6)? REAR
          2             aes, Pe                                         a                                         ae
         &               BUILDING DESIGN |” Calezac Pty Ltd             25 Kauri Street, Cooroy, QLD 4563 pee ——————fresesere| UNIT TYPE T3
         =          Se                                                                                   a
           “GreenSmart’                                                                                                   _ ——
         5       fonmmena RENOVATIONS]                                  Property Detats:                                                                ol
             frm        PH. 0405 097 553      i Uni                     Lot 27 C56016                    J o[         | urentissuedate              2 8-20T8 |
         HE  ©) Messen no@aidd com au eae: nel _ eee                    Area 4741m?                                      es        ———               ——
                                                                                                           Peni i |
 ALL DESIGN             gpoc 1084200                                    © weewsmesaese |p                                         rrr         ttn
                                                                                                                                              Page 40 of 94

Section 41

Page 41 of 94

~“
                       {Dati
                         3           530   530                                                             [
                                   (ieee |                                        eee
                                   SH                   |                                                                 a
                                  |   =    wae                                                    Y                       =                      Pol,
                                  |                                                   Lasoc      |         |                       }   M é--- P wt =] ?
          i oA                                              —=         ie                                   ashe near ere   Wii ee: 1 |
                                                                                                                                   —_     ee AN |
                                                                       .                                   |                  i || 3
         I
         mete? fesicy |             |’          ®
           eee                 |            LL            (2) WEE 4 FRONT                                     (3) REA REAR
          ~ <-) 5
         eee                            2
             —                          a  1 |
          -                     1),     deel,                            a                             we
    ;     fee           os      &                                                           1                  :
eb        Lh                we        NYT                             eel
                                       Le                        ||          aoe                    |
    3     7 WIR         2  GARAGE                                 zg   =           4 eee
                                        LDRY                                             .
          i                                                           aes
          Yat            A  i          ia                                            Sp  eS   5                           |         F;
          Het] sre         fi         pt                                           dnd
          Poo 8) rh        rR         RE                          TYPE 4 SIDE
    |   L                  1    oR    OB
                           I     1     \
       Bi          wo      ee
                   KE OO
                   Ss  i               a                      —————                                       aa        aes           SSS
            _                     om                 ~                              .                 ————                                         —
        eS                l                  U           st                                        i
                   DA11! |                                                                               TT                                         Geni
       UNIT 4                                                                                     |      =        =                   ah ate
j__uuaricon areas     |                                                     ==                    |       rm               elas "Peg ae
     UNIT 4 FLOOR AREAS                                                     |         =           =      pooh                   <a.
 [pre LOmER  eee                                                       ni                                _       -       :
 [wTaeano iam         id
 JUNITAGARAGE Sm
lunirarorce iim       CS                                  (5) SERONT                                    (6)4 REAR.
          D              ARCHITECTURAL [ouent                           —                               pene Tee] UNIT TYPE
          £         pe SERIES | Catezac Py Ld                           25 Kauri Street, Cooroy, QLD 4563 fe               ra              TPES
                                                                                                                         es ee
          : ™4GreenSmart’ RENOVATIONS                                   Property Detats:                ———
                                                                                                           Pe
          =             pa. 05007 #83. |" Proposed Multi Unit Develo   Lot 27 C56016                    az                         ee $a]
          3         TERED                      i Unit Development                                         |__________|__|curentiesueoate_26-08:2018 |
          5 ©westee eden a, | Attached Zone                            Area 4741m*                      [sq                     Fr cr            St |
 ALL DESIGN              QBCC 1084500 Not for BA or Construction        © NOT TO BE COPIED, RETAINED OR USED FOR ANOTHER PURPOSE  re          ee
                         VBA DP-AD 37989             -                     THE DRAWING IS THE COPYRIGHT AND PROPOERTY OF ALLDO. (TiS a Drawing no. DAII
                                                                                                                                            Page 41 of 94

Section 42

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 42 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                         12 FEBRUARY 2019

               e                               26                        tt 047
                &                                                         MH
    swe        H:106.06                       56016                               14
         CLIT ‘                                                          3       56023
       $s of  Pn S is               =                                   =
        SR  SE ye                   Ss                2            =     ||
         E    ‘   °                                  2             S     wo  =        e/>
         ye                                       2 | wae                    2.
              \                                                 »                           +
         é    \       F                                                                  e
        oe          eh       s                                                             K
         &           2         %
          j    |   J                                                                      /
             er at                           A           Ar                             LS
           les e oo      far                e          e                         wed ‘d   a
      = $89" S&     Ss    Sua               7                                    . ee 7 12
      L1:106.87 | 3        vers                       27                (sc        o/  é e
         #     ®                                 ¢/  4741m?         oS           ee
               8        of  Cx                  F                   foo)      APL 7
           wud           ee                               po]          lee
           \    1                                +                      ‘       ws
                    .                2                                  ws    4
       5    ew)         |                                     RY      PR
       <|,ip            *                 fF             Ro       BY       aA
                   SI   co                                        x
       Dw if                               git           ab         o     @   &
            \   ‘          o                           GS          Ki oP   A
            ge |    ils          °                 ge      |e   | LA
                          é                         oe           & Ne     ©
             \    aay            Y                         +   y/  , ”
               hye              &              i)            fy   ie /
                <         *                                      “N
                        &                       >          7    4 *
                         d                     lag?             we
                3°   SI                        OS        eee sg
         wo”   # 1 fe      S             ra             7   ”       ttt 10.40
                   l       On                          4
         A    ies \*          OE  Nu      oS          iE)       oe»
         D SP     |              3        S          ee © 9  &
              {  Pe lo          $               LP  4   /   > 6
         m     ses                     ¢      7 Y / y RA
          a\                                   2 Soy
                  ‘                           rd ae    Oo S
             Pp    \         . l                 tT
           ser     |       (               “Ph         /
            Oe     '       Mg              a     09   S
                   | 8    (Te            ef         f
                     +      PO              s       S
                wari      VS         Kf           Sf                           <n
                a gn @ 4            r    ©       6                             Mabaddatatdelatdatate asad
            ow Mirage Sb  Pyne)                /                               ee
              ot "Oe n a ore  VERCP hyp /     S                                ees ee
              ||     ORY swe 166.29 925" F"707.91," x            a             ——
             “4     S"  LiosHiorag wa      °                         ee
                D        -    aS   yp ~N107.73                Steere etna      =
               ©        3     Ss         J                    fee    Paes      = on
              gS       s      F705      °                     Siena nae        —— pairoo.
             oS                a     WA                       em      pence    a
                   Re        Po      J                        fer    Eee | [aha =
                        &         YX                          =      -___||—— =~
                    e                                         =      = | |\———=
                    *         LL:107.68                       =                       ice omocan
                        cient ALBA PROJECTS _ | Priet           Plan 1 of 1 NOTE:
rns                                         PLAN SHOWING         naan | Seema
                                            DETAILS OF LOT 27             sepred Bang Sean punose ty
       MAX WATTERSON                        ON C56016.           Scale: 1:500 | Underground services not located except
        + ASSOCIATES                                            oatum: any | "mvomtenton etc
      CONSULTING SURVEYORS                                      Origin: PM24871
      10 Maple Street   LOCAL GOVT: NOOSA S.C.                   Cont.int: 0.5m
      od   ee           LOCALITY: COOROY
      Ph. (07) 54426121                     0   5  10 15 20 25m    Ref:
      Se pcemey                             Let bs bs bs Le | | 99-2240

                                                                                 Page 42 of 94

Section 43

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                               12 FEBRUARY 2019



3                        ENVIRONMENT GRANTS POLICY
DOCUMENT INFORM AT ION




Author                              Environmental Services Manager, Craig Doolan
                                    Environment and Sustainable Development Department

Index                               ECM/ Environmental Grants/ Environment Levy

Attachments                         1.    Environment Grants Policy
                                    2.    Community Grants Policy - Amended



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Environmental Services Manager to the General Committee
Meeting dated 14 January 2019 and:
A.                       Adopt the Environment Grants Policy as set out in Attachment 1 to the report;
B.                       Approve Interim Evaluation Criteria for the next round (February 2019) of Environment
                         Grants only, based on relevant Strategic Outcomes of the Biodiversity and Waterways,
                         Wetlands and Coasts themes in the Draft Environment Strategy, listed below;
                            Ecological linkages and connecting habitat areas are improved and rehabilitated to
                              increase landscape connectivity and species resilience.
                            Community conservation partnerships on public and private land are developed to
                              deliver successful biodiversity conservation outcomes.
                            Terrestrial and aquatic ecosystems, as well as fauna and flora species, are protected
                              from significant human impacts.
                            Invasive pest species are managed strategically to reduce impacts on native species
                              and habitats, fisheries, recreation and tourism values.
                            Water quality, riparian areas and catchment health is protected and improved by
                              partnering with landholders and stakeholders to actively manage and rehabilitate
                              priority stream reaches.
                            Aquatic biodiversity is improved through the preservation and enhancement of diverse
                              instream, riparian and wetland habitats.
                            Point source and diffuse pollution is identified and effectively managed to reduce
                              impacts on waterways, wetlands and coasts.
                            Waterways, wetlands and coastal environments are protected, managed and
                              maintained in their natural state and are enhanced to support healthy and diverse
                              ecosystems.
                            The quality and quantity of groundwater, surface water and wastewater discharge is
                              optimised to minimise impacts to receiving waters, aquatic ecosystems and human
                              health.
C.                       As a result of the introduction of a new separate Environment Grants Program and Policy,
                         Council approve the amendments required to the Community Grants Policy as detailed in
                         Attachment 2 to this report.



                                                                                                     Page 43 of 94

Section 44

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 FEBRUARY 2019


REPORT
1.    Background
Noosa Council has previously provided grants to community groups for environmental projects,
programs and events through the Community Grants Program. There has been no specific criteria
for the assessment of environmental projects, with applications for environmental initiatives being
assessed along with other non-environment community applications. Prior to 2018, when Council
made an initial allocation towards a specific Environment Grants program from the Environment
Levy, projects related to the environment had been funded out of General Rates, through the
Community Grants program.
In July 2018 the Environment Levy Policy was amended to allow for the provision of environment
grants. For the 2018/19 financial year, $235,000 was allocated from the Environment Levy to fund
a dedicated Environmental Grants Program. Grants that had an environment focus and were
previously funded through the Community Grants Program were to now be funded through the
Environment Levy and subject to dedicated criteria for the Environment Grants Program.
To support the allocation of funding towards an Environment Grants program, a new Environment
Grants Policy has been developed that will support the achievement of strategic outcomes and
targets outlined in the Environment Strategy.
2.    Environment Grants Program
The new Environment Grants Program will have three main funding streams;
A.    Environment Project Grants
These grants will be for projects, programs or events that align with Council’s key environment
strategies and plans and have a positive impact on the Noosa environment. They will typically be
completed within 12 months of commencement.
The minimum grant amount from Council under the Environment Project Grants program is $1,000
and maximum grant amount is $30,000.
Environment Project Grants will be advertised and assessed through the same process as
Council’s Community Grants program, as outlined in the Community Grants Guideline.
B.    Environment Organisation Alliance Grants
These grants will provide organisational support to community groups that are primarily focused
on environment activities. Successful applicants will receive an annual grant for up to three years
where:
    the primary purpose of the organisation aligns with purpose of the Environment Levy, to
      protect, enhance and increase the resilience of Noosa’s natural environment;
    the services provided by the organisation are of significant benefit to the Noosa community
      (beyond their membership base);
    the organisation’s services closely align with Council’s environmental strategic outcomes,
      identified in the Environment Strategy;
    the organisation can demonstrate value for money for all stakeholders; and
    the organisation can demonstrate the need for financial assistance from Noosa Council.
Applications for Environment Organisation Alliance Grants will follow the same process as other
Noosa Council alliance grants, as outlined in Community Grants Program Guideline – Three Year
Community Alliance.
C.    Multi-year Environment Collaborative Projects
Multi-year Environment Collaborative (MEC) Projects will support longer-term, larger-scale
strategic initiatives that align with the Environment Strategy and have a significant positive impact
on the Noosa Environment.

                                                                                     Page 44 of 94

Section 45

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 FEBRUARY 2019


These projects will have multiple community stakeholders and clear, measurable outcomes.
Projects may be funded for up to three years. Recipients will be required to provide an annual
progress report that includes a financial report, which demonstrates delivery of agreed outcomes.
Projects will be sought annually through an on open application process or EOI.
Council will retain the flexibility to receive and assess MEC Project applications outside of this
timeframe, but all projects will still be subject to Council approval.
3.    February 2019 Grant Round
In the absence of an adopted Environment Grants Policy, the previous grant round assessment of
September 2018 year was undertaken using the broader Community Grants Program criteria,
along with the Environment Levy Policy, with funding to be provided from the Environment Levy
for grants related to the environment.
The next grant round is due to open in late February 2019. It is anticipated that there will be a Draft
Environment Strategy for public comment at this stage, but not yet an adopted Environment
Strategy to guide the full implementation of the Environment Grants Policy. Given this, an interim
set of criteria, based on the Draft Environment Strategy, has been developed and will be used to
guide assessment of this next round of grants, until such time that the Environment Strategy is
adopted by Council.
Applications for Environment Project Grants and Environment Alliance Organisation Grants will be
sought at the same time as the Community Grants, currently scheduled for late February 2019. All
available funding for this round of grants is from the Environmental Levy, which states as its
purpose “to support initiatives in partnership with the community that protect, enhance and increase
the resilience of Noosa’s natural environment”.
Interim Evaluation Criteria
For this round of grants, applications will be assessed against the Environment Levy Policy, the
Environment Grants Policy, and relevant Strategic Outcomes of the Biodiversity and Waterways,
Wetlands and Coasts themes in the Draft Environment Strategy listed below:
    Ecological linkages and connecting habitat areas are improved and rehabilitated to increase
      landscape connectivity and species resilience.
    Community conservation partnerships on public and private land are developed to deliver
      successful biodiversity conservation outcomes.
    Terrestrial and aquatic ecosystems, as well as fauna and flora species, are protected from
      significant human impacts.
    Invasive pest species are managed strategically to reduce impacts on native species and
      habitats, fisheries, recreation and tourism values.
    Water quality, riparian areas and catchment health is protected and improved by partnering
      with landholders and stakeholders to actively manage and rehabilitate priority stream
      reaches.
    Aquatic biodiversity is improved through the preservation and enhancement of diverse
      instream, riparian and wetland habitats.
    Point source and diffuse pollution is identified and effectively managed to reduce impacts on
      waterways, wetlands and coasts.
    Waterways, wetlands and coastal environments are protected, managed and maintained in
      their natural state and are enhanced to support healthy and diverse ecosystems.
    The quality and quantity of groundwater, surface water and wastewater discharge is
      optimised to minimise impacts to receiving waters, aquatic ecosystems and human health.



                                                                                       Page 45 of 94

Section 46

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 FEBRUARY 2019


Multi-year Environment Collaborative Project Grants will be advertised outside of the normal
Community Grants process, upon the adoption of the Environment Strategy, anticipated to be in
May 2019.
All three grants will be funded out of the 2019/20 budget. This will done on a proportional basis
with the final split to be determined as part of the annual budget process. An indicative split for the
2019/20 financial year would be;
    Environment Project Grants – 30% ($75,000 based on a $250,000 budget)
    Environment Alliance Organisation Grants – 20% ($50,000 based on a $250,000 budget)
    Multi-year Environment Collaborative Project Grants – 50% ($125,000 based on a $250,000
      budget)
Any extra funding provided above this level will be put towards Multi-year Environment
Collaborative Project Grants, unless otherwise specified during the budget process.
Noosa Biosphere Reserve Foundation Grants
Noosa Council has previously provided funding to the Noosa Biosphere Reserve Foundation for a
grants program and for environment projects. In the 2018/19 financial year, $125,000 was allocated
for projects that align with the principal purpose of the trust.
For the remaining period of the current funding deed (due to expire June 30, 2021), the deed states
the ‘NBRF will need to lodge applications with Council for projects to be funded from the
Environment Levy. Such applications will be assessed against other applications received and in
consideration of the total amount allocated towards grant projects from the Environment Levy’.
Future project funding for the Noosa Biosphere Reserve Foundation will be subject to application
processes as described in the Environment Grants Policy and associated guidelines, and will be
assessed against other applications from other community groups.
Community Grants Policy
The Noosa Council Community Grants Policy has had some minor revisions, partly as a result of
the creation of a new Environment Grants Policy. These revisions are;
    removal of reference to environmental grants;
    further clarity on who is and isn’t eligible, to ensure consistency between policies;
    the Regional Arts Development Fund now includes businesses as being eligible;
    assessment criteria for Community Projects has been revised and now includes
      contributions, financially or in kind, toward the project (rather than value for money);
    changes to the three year agreement application process, if Council decides to continue with
      the program, renewal of agreements will be negotiated three months prior to their expiry; and
    Alliance Grants now states if Council decides to continue with the program, renewal of
      agreements will be negotiated three months prior to their expiry, and if funds allow, invite
      expressions of interest from eligible not for profit community organisations.
Previous Council Consideration
Ordinary Meeting, 19 July 2018, Item 7, Page 8
That Council note the report by the Principal Environment Officer to the Planning & Environment
Committee Meeting dated 10 July 2018 and repeal the current Environment Levy Policy and adopt
the revised Environment Levy Policy provided as Attachment 2 to the report, authorising the CEO
to make minor amendments as necessary.




                                                                                       Page 46 of 94

Section 47

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 FEBRUARY 2019


Finance
The budget allocated out of the Environment Levy for environmental grants for 2018/19 is
$235,000. This was based on;
    $110,000 was the estimate of annual expenditure in the 2017/18 financial year on
      environment-related grants within the Community Grants Program. As a result, this amount
      was allocated from the Environment Levy to support a grants program of a similar scale in
      the 2018/19 financial year.
    $125,000 was allocated from the Environment Levy to support an expansion of the
      Environment Grants Program to allow for multi-year collaborative projects, as proposed in
      the Environment Grants Policy.
A further $125,000 was allocated from the Environment Levy to the Noosa Biosphere Reserve
Foundation in accordance with the current funding deed which stipulates that this grant funding
should be used for projects that advance the principal purpose of the Biosphere. A further $70,000
was allocated from the Environment Levy towards operation support funding for NBRF.
As discussed above for the remaining period of the current funding deed with NBRF (due to expire
June 30, 2021), the deed states the ‘NBRF will need to lodge applications with Council for projects
to be funded from the Environment Levy. Such applications will be assessed against other
applications received and in consideration of the total amount allocated towards grant projects from
the Environment Levy’.
In subsequent years, Council will determine the total allocation of funds to the Environment Grants
Program through its annual budget process
Given the likely date of adoption for the Environment Strategy and the time needed to develop
larger projects, it is probable that the majority of extra $125,000 in 2018/19 allocated for multi-year
collaborative projects will not be expended this financial year.
Risks & Opportunities
There is great opportunity within the Environment Grants to improve capacity within local
environment groups, allow for implementation of projects related to Council’s key environment
strategies and plans, and also bring in further matching funding, to maximise the total spend on
environment projects.
There will be at least one more round of Community Grants prior to the final adoption of the
Environment Strategy. In the current Environment Grants Policy, Environment Project Grants and
Environment Organisation Alliance Grants will follow the timetable of the Community Grants
program to allow for significant efficiencies in administration. An Interim Evaluation Criteria is
proposed for the assessment of these grants.
The promotion, assessment and acquittal of grants has a significant administrative load. The
Environment Grants Policy has been written to take advantage of the existing administrative
process and resources in place within Council. The development of the Multi-year Environment
Collaborative Projects will potentially take significant resources, especially if the program grows
over time, this will need to be monitored over time.
Consultation
External Consultation - Community & Stakeholder
Nil




                                                                                       Page 47 of 94

Section 48

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  12 FEBRUARY 2019


Internal Consultation
Departments/Sections Consulted:

     Chief Executive Officer   x   Community Services                      x   Corporate Services
     Executive Officer             Director                                    Director
     Executive Support         x   Community Development                   x   Financial Services
                                   Community Facilities                        ICT
                                   Libraries & Galleries                   x   Procurement & Fleet
                                   Local Laws                                  Property
                                   Waste & Environmental Health                Revenue Services

 x   Executive Services        x   Environment & Sustainable Development       Infrastructure Services
     Director                  x   Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
 x   Governance                    Economic Development                        Civil Operations
     People and Culture        x   Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 48 of 94

Section 49

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 49 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 FEBRUARY 2019

                                                                         ATTACHMENT 1

   x ) |      NOOSA                                                        Council Policy
        Mi    Keelenere                                ENVIRONMENT GRANTS

   Corporate Plan Reference:                 The Noosa Environment
   Endorsed by Council:                      21 February 2019
   Policy Author:                            Manager Environmental Services

  POLICY BACKGROUND
  Noosa Council has a long history of working with and supporting th   unity to achieve significant
 environmental outcomes. The Environment Grants program                continue this partnership
 through support and collaboration to achieve significant e'            outcomes that align with
 Council’s key environment strategies and plans.
 This policy is guided by the Noosa Environment Strat      Environment Le       licy. The Strategy
 clearly outlines strategies, targets and outcomes f     oosa environment o       10-year period.
 This Policy does not apply to sponsorship, don      , advertisings,naming rights    ervice level
 agreements.
 COUNCIL POLICY
 The Environment Grants will support the im    entation of t    uncil’s key environment strategies
 and plans by enabling collaboration with  the ¢      ity in i   ives that protect, enhance and
 increase the resilience of Noosa’s naturale      °     ,

  Grants will be for initiative      building  and fg  ts tha    serve and/or improve ecosystem
  health and biodiversity ir   oosa   Shire. All | ves funded by the Environment Grants program
 will have tangible and   asurable outcomes.
 Outcomes of the Envi     nent Gre    program will
 e   implementation of Council’s*key envire        ategies and plans, and the actions within them,
     that are        ately de    =d through gra
 e   inc     d  capa      of local ygroups through a collaborative approach to environmental
     0     gement
 e   inc    ed funding direc    toe      mental activities through the opportunities of community
     group    ganisations to    rage extra funding or resources.
 Who Can App
 The Environment        t      open to not-for-profit community organisations that meet al/ of the
 following criteria:
 e   The project or event for which they are applying benefits the residents of the Noosa community;
 e   The application meets the specific eligibility criteria of the funding programs as set out in this
     Policy and the supporting grant guidelines;
 e   The organisation:
     o   is alegal not-for-profit entity
     ©  complies with all incorporation requirements of the State and Commonwealth as at the
        closing date for the grant program
     o   be registered by an Act of Parliament
     o   has an active ABN
     o   Has a bank account in the name of the legal entity.

                                                                                         Page 1

                                                                                          Page 49 of 94

Section 50

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 50 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 FEBRUARY 2019

    COUNCIL POLICY - ENVIRONMENT GRANTS

    If an organisation is not eligible as per the above criteria and wishes to apply for a grant, the
    organisation is able to do so provided that the application is auspiced and administered by an eligible
    organisation that is willing and able to accept legal and financial responsibility for the grant and the
    project or event being delivered.
    All applicants (including the auspice, if required) must have:
    e   appropriate insurances and adhere to sound Workplace Health and Safety practices
    e   no debt to Council, or has entered into scheduled payment arrangements with Council that is
        being adhered to
    ¢   met acquittal conditions for any previous Council grants.

    Who Cannot Apply
    e   commercial businesses or business trusts
    e   government agencies or departments of local, state and       al go      ent
    e   educational, political or religious organisations, or    ry health c      roviders, where the
        application is for the organisation’s core business
    e   community groups that are not incorporated
    e   individuals.

    An organisation found to be ineligible after approval wil      red to return the grant payment.
    Eligible Projects
    In order to be eligible for funding, projects
    e   align with the strategic outcomes of      n                ament  strategies and plans and/or
        contribute towards achi          argets outline    the  No     nvironment Strategy
    e   be consistent with     purpose     he Env       ent Levy as outlined in the Environment Levy
        Policy, where the’Environment Levy  is the source of funding for the grant
    e   demonstrate value    money,       that the pro    is in the public interest
    e   have a financial or in-kine     putio        project.
    Ineligib     oje
    Ineli     projects or programs inclt   but are not restricted to:
    e   Pro     that do not contribute tow    Council’s key environment strategies and plans and have
        a clea    dentifiable benefit to the Noosa environment.
    e   Projects,    nts or progre   run for commercial profit.
    e   Projects where  most o     benefit will be outside the Noosa Shire.
    e   Activities that ha      dy commenced prior to the grant application being submitted.
    e   Payment of debt.
    e   Political activities.

                                                                                               Page 2

                                                                                            Page 50 of 94

Section 51

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 51 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 FEBRUARY 2019

  COUNCIL POLICY — ENVIRONMENT GRANTS

  ENVIRONMENT GRANTS PROGRAM
  The Environment Grants Program will consist of three main funding streams:
  1.    Environment Project Grants
  These grants will be for projects, programs or events that align with Council’s key environment
  strategies and plans and have a positive impact on the Noosa environment. They will typically be
  completed within 12 months of commencement.
  The minimum grant amount from Council under the Environment Project Grants program is $1,000
  and maximum grant amount is $30,000. There is an expectation that projects will have a cash or in-
  kind contribution by the applicant or other partners. In some instances, only part-funding of the
  amount request may be offered.
  Environment Project Grants will be advertised and assessed thr      e€ same process as Council's
  Community Grants program, as outlined in the Community Gr             ine.
  2.    Environment Organisation Alliance Grants
  These grants will provide organisational support to      nity groups that ar    arily focused on
  environment activities. Successful applicants will r  an annual grant for up t     years where:
  e  the primary purpose of the organisation aligns     oosa E       ment Strateg
  e   the services provided by the organisation are o      ifi      nefit to the Noosa community
      (beyond their membership base)
  e  the organisation’s services closel        vith Counci       tegic outcomes, identified in the
      Environment Strategy
  e   the organisation can demonstrate value  fo   eC     all stak'   ers
  e  the organisation can demonstrate the ne        Ff   2     istance from Noosa Council.
  Applications for Envire   nt Organisation Alliance Grants will follow the same process as other
  Noosa Council allia    grants, as outlined in Community Grants Program Guideline — Three Year
  Community Alliance.
  3.    Multi-yea    Vviron          abora           ts
  Multi-ye      iro       ollab    ive (MEC) Projects will support longer-term, larger-scale strategic
  initiati    at align w    ae E     Ament Strategy and have a significant positive impact on the
  Noo     Avironment.

  These pro     5 will have multiple community stakeholders and clear, measurable outcomes. Projects
  may be funded   for up to three years. Recipients will be required to provide an annual progress report
  that includes a    ncial repe   hich demonstrates delivery of agreed outcomes.
  Projects will be so        ually through an on open application process or EOI. If funding has
  already been allocatec     previous rounds (including in previous financial years), Council may
  choose not to seek further applications until there are sufficient funds.
  Council will retain the flexibility to receive and assess MEC Project applications outside of this
  timeframe, but all projects will still be subject to Council approval.
  A Guideline for the delivery of Multi-year Environment Collaborative Grants will be developed and
  annually reviewed by the Environment Levy Working Group.

                                                                                           Page 3

                                                                                          Page 51 of 94

Section 52

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 52 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 FEBRUARY 2019

 COUNCIL POLICY - ENVIRONMENT GRANTS

 ROLES AND RESPONSIBILITIES
 Council will publicise the availability of its Environment Grants and the associated process to apply.
 In assessing the grants, Council will:
 e   ensure public monies are allocated in a fair and equitable way
 e   ensure best possible value for money
 e   check each application against eligibility criteria as set out in the appropriate Grant Guideline.
 e   seek recommendations from an expert panel on occasion or where appropriate that can
     comprise Council officers, Councillors and/or community representatives.

 Council will determine the total allocation of funds to the Environment Grants Program through its
 annual budgetary processes. The number and types of grants appro        | depend on the demand
 for funding, the available program budget, and corporate priorities
 Council may also determine priority funding areas on a year-     r      This may include:
 e   direction of funding towards specific Themes or Strategi  comes        Environment Strategy
     for any given grant period
 e   nominating the proportion of funding to be dir:     towards each of th      e grant funding
     streams for any given financial year.
 Council officers are available to provide advice to a   nt       help develop grant applications.
 They will also assist organisations to identify additional    rnative sources of funding relevant
 to their project or event.
 Council officers are bound by Councils E      ec    de of Co       and are therefore responsible
 for acting with impartiality and integrity and reco 9    declari     y actual or potential conflicts
 of interest. This may include   is not limited to, pe  a       ections with the applicant. Anyone
 having a determined conf             t should no    bate or be   involved in any discussions on any
 matter relating to that ¢  ation.
 Council officers are     ired to adhere to this p     when supporting, facilitating, or delivering
 grants-related activitie  is the          ity.of Council officers to ensure that grants and funding
 provided from.public mon
 e   area              anspa       and accountably
 e   ali    th Council’    ectives, goals and priorities
 ee       ively advertised and, prome    to the community so that potential applicants have equal
     opportunity to apply for  ds
 e   monitored  for compliance  against set performance measures.

 RELEVANT DOC          NTS
 Queensland Gove
 e   Local Government Regulation (2012)
 e   Local Government Act (2009)
 e   Statutory Bodies Financial Arrangements Act (1982)
 Noosa Council
 e   Noosa Council Corporate Plan
 e   Noosa Council Environment Strategy
 e   Noosa Council Environment Levy Policy
 e   Noosa Council Sustainability Principles
 e   Noosa Council Community Grants Policy

                                                                                          Page 4

                                                                                          Page 52 of 94

Section 53

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 53 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 FEBRUARY 2019

  COUNCIL POLICY - ENVIRONMENT GRANTS

  DEFINITIONS
  Acquittal
  The process by which a recipient demonstrates in writing to the funding body that it has expended
  the funds in accordance with the terms and conditions of the funding agreement on completion of
  the activity or project. The acquittal process, when conducted correctly, demonstrates that these
  monies were being used efficiently, effectively or that the community is getting value for money for
  services.

  Auspice
  Auspice means that an organisation takes responsibility for ensuring the funds are used as specified
  in the grant allocation. An auspicing organisation will be responsible fo
  e  sign-off on the funding agreement
  e  the receipt, banking and administration of all moneys
  e  project monitoring and completion
  e  ensuring the applicant acquits the funding on time
  e  sign-off on the acquittal form.
  Business
  For the purpose of this policy, business is defined as an organisation or enterprising entity engaged
  in commercial, industrial or professional activities for profit. This may be in the form of a sole trader,
  company    or  partnership.    Sole_trader}   an   individual operating  as   the  sole  person
  legally responsible for all aspects of the business.           a legal entity separate from its
  shareholders. [Partnership} an association of people or entities running a business together, but not
  as a company).
  Business Trust                                                ®»
  An entity that holds propefty ©     e for the       of others.
  Community Grant F
  A policy outlining the               yewhich a |     government may provide grant funding to
  community groups. For       p         0        2     orting, this Environment Grants Policy is a
  ‘Communi           Policy’ U      e definition of the Local Government Regulations (2012).
  Conf       Interest
  A co      of interest is a conflict be en an officer's or councillors personal interests (including
  personal   interests arising fro eir relationships or memberships, for example) that might lead to a
  decision that  iS.contrary to th blic interest.
  Environment     Strategy
  The Environment S          s the overarching Noosa Council strategic document relating to the
  environment. It is divided into four Key Focus Areas, each of which have several priorities and a
  target. Each Key Focus Area also has a series of Strategic Outcomes that Council is seeking to
  achieve. The Environment Strategy sits alongside the Social Strategy and Local Economic Plan as
  the key strategic documents of Noosa Council.
  Funding Agreement
  A legal agreement entered into by the successful applicant and Council noting the obligations of both
  parties.

                                                                                           Page 5

                                                                                            Page 53 of 94

Section 54

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 54 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 FEBRUARY 2019

 COUNCIL POLICY - ENVIRONMENT GRANTS

  Grant
  Funds provided to a recipient through a formal program for a specified purpose, directed at achieving
 goals and objectives consistent with Council policy, where the recipient is selected on merit against
  a set of criteria. Funding is subject to entering a written agreement with Council that outlines
  accountability requirements.
  In-Kind Support
  In-kind support includes paid and volunteer labour, administrative support, rent-free accommodation
  or donations of materials, equipment or services.
  Not for profit incorporated community organisation
 A community organisation that operates as a legal entity with a prima     ose of providing services
 to the community. An organisation is non-profit if it is not carried     e direct or indirect profit or
 gain of its members, both in its operations and winding up.
  Organisations
  For the purposes of this Policy the term Organisation      Ss:
 e  Incorporated Associations (incorporated under        egislation, commonly h      ‘Association’ or
    ‘Incorporated’ or ‘Inc.’ in their legal name);
 e  Incorporated   Cooperatives   (also  incorporate      der         legislation, commonly    have
    ‘Cooperative’ in their legal name);
 e  Companies (incorporated under the Gorporations Act 2        may be proprietary company (limited
    by shares or by guarantee) or public   ‘con  ies); and
 e  Aboriginal Corporations (incorporated                 orporat     Aboriginal and Torres Strait
    Islander) Act 2006)

  Public Interest
  For the purpose of thiS policy, public interest refers to ‘the welfare of the general public in contrast to
 the interest of an ind   al or group
  Sponsorshi
  Sponsor                ctua      iness arrangement under which a sponsor, for a specified term,
  provi       ontributi     ash and/or in kind (“contra”) in return for specified commercial benefits.

  Version contr
   Version  REQ     Trigger  a             Change (Y/N)  Endorsed/ Reviewed by    Date
   1.0       New » ~ VW        4d                       Council                   21/02/2019

                                                                                             Page 6

                                                                                             Page 54 of 94

Section 55

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 55 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 FEBRUARY 2019

                                                                            ATTACHMENT 2

     | ¢ yg      NOOSA                                                    Council Policy
     | @ |      COUNCIL                                 COMMUNITY GRANTS

     Corporate Plan Reference:                 Working in Partnership with Our Community

     Endorsed by Council:                      21 January 2019

     Policy Author:                            Community Development Manager

   POLICY BACKGROUND
   This Policy is to guide the administration of Council’s Community Grants Program so that the grants:
   e Assist Council to achieve its strategic goals and identified key initiatives; and
   e Align with the intent of the Local Government Act 2009 and the Local Government Regulation
      2012, which state that (community) grants will be used for a purpose that is in the public interest.

   This Policy is to be read in conjunction with any supporting guidelines for specific funding programs.
   This Policy does not apply to sponsorship, donations, advertising, naming rights and service level
   agreements.
   POLICY OUTCOMES
   The outcomes of this policy include:
   e  Providing financial support to meet identified community needs;
   e  Building community skills and resilience;
   e  Developing and maintaining sustainable community infrastructure;
   e  Providing opportunities to leverage Council's financial assistance to obtain funding from other
      sources; and
   e  Providing opportunities to deliver on Council’s strategic goals and identified key initiatives

   WHO CAN APPLY
   Not for profit community organisations can apply for a Community Grant provided they meet the
   following criteria:
   e The project or event for which they are applying, benefits the residents of the Noosa Shire
      community;
   e The application meets the specific eligibility criteria of the funding programs as set out in this
      Policy and the supporting Grant Guidelines;
   e The applicant:
      o  Is a legal not for profit entity;
      o  Complies with all governance and financial requirements of the State and Commonwealth as
         at the closing date for the grant program;
      o  Be registered by an Act of Parliament
      o  Hasan active ABN;
      o  Has a bank account in the name of the legal entity;
   If an organisation is not eligible as per the above criteria and wishes to apply for a grant, the
   organisation is able to do so provided that the application is auspiced and administered by an eligible
   organisation that is willing and able to accept legal and financial responsibility for the grant and the
   project or event being delivered.

                                                                                            Page 1

                                                                                           Page 55 of 94

Section 56

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 56 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 FEBRUARY 2019

    All applicants (including the auspice, if required) must have:
    e  Appropriate insurances and adhere to sound Workplace Health and Safety practices;
    e  No debt to Council, or has entered into scheduled payment arrangements with Council that is
       being adhered to; and
    e  Met acquittal conditions for any previous Council grants.

    Service Clubs are eligible for water rebates and building insurance cover and may apply for
    Community Project Grant, Three Year Signature Community Events and Festive Season Grants
    only.
    Chambers of Commerce may apply for Community Project, Three Year Signature Community
    Events and Festive Season Grants only.
    Not for profit community organisations with a liquor-licenced supporters/associated club that
    commercially trade seven days a week may apply for Festive Season Grants only.

    WHO CANNOT APPLY
    e   Businesses and individuals (except RADF*)
    e   Business Trusts
    e   Government agencies or Departments of local, state or federal government
    e   Educational institutions
    e   Parents and Friends Associations, or Parents & Citizens Associations
    e   Medical organisations or Primary Health Care Providers
    e   Political organisations
    e   Kindergartens, Pre-school and day care centres
    e   Religious organisations where the application is for a project that relate specifically to the
        organisation’s core business

    *Individuals (with an ABN), and businesses can apply for Regional Arts Development Fund (RADF)
    grants only.
    An organisation found to be ineligible after approval will be required to return the grant payment.
    ELIGIBLE PROJECTS, EVENTS OR PROGRAMS
    To be eligible to apply for funding, community grant applications must adhere to the terms and
    conditions set out in this Policy as well as the supporting Grant Guidelines for that specific funding
    program.

    COMMUNITY GRANT PROGRAMS
    Council's Community Grants will encompass the following nine funding programs.
    1.   Community Project Grants
    Applications for Community Project Grants will be accepted twice yearly and successful applications
    will be decided in a competitive assessment process based on:
    e  Demonstrated need for the project;
    e  Demonstrated need for funding;
    e  Contributions, financially or in kind, toward the project;
    e  Benefit to the community;
    e Alignment with Council’s strategic goals and identified key initiatives; and
    e The amount of funding allocated in Council’s annual budget for Community Grants.

                                                                                             Page 2

                                                                                          Page 56 of 94

Section 57

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 57 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 FEBRUARY 2019

  Council may determine priority funding areas on a year-to-year basis and these priorities will be
  identified in the Community Project Grant Guidelines.
  Community Projects may include, but are not restricted to:
  e  Community based festivals or events that bring residents together, including cultural, sports or
     community festivals. (Such events may require a Temporary Event Permit from Noosa Council);
  e  Projects or programs that respond to a specific opportunity or need within the community. These
     programs may enhance the skills of participants or be pilot projects with a community focus.
     Ongoing projects or programs may be funded for a maximum of three times;
  e  Building works or infrastructure projects that include new or replacement infrastructure, or the
     maintenance of existing infrastructure. This may include lighting, shade sails, storage facilities,
     fit-outs etc. (Works may require approvals such as building approval and property owner's
     consent).

  Projects that are ineligible for funding are detailed in the Community Project Guidelines.
  Applications may be part funded to assist distribution of funds to more community groups. If
  applications are part funded, the organisation will need to fund the balance of the grant.

  2.    Regional Arts Development Fund (RADF).
  RADF grants support local artists and communities to participate in locally determined arts and
  cultural priorities, activities and opportunities. The Regional Arts Development Fund (RADF) is a
  partnership between the Queensland Government and Noosa Council to support local arts and
  culture in regional Queensland.
  Applications for RADF will be decided through a competitive assessment process. Council may
  determine priority funding areas on a year-to-year basis and these priorities will be identified in the
  RADF Guidelines.

  To receive RADF funding, applications will need to demonstrate they are eligible and that they have
  met the RADF criteria as outlined in the RADF guidelines.

  3.    Festive Season Event Grants
  Festive Season Event Grants will provide financial assistance for up to three years to eligible not for
  profit community organisations for events that are free to the public and occur between late
  November and January each year. Events that can be funded through this program include
  Christmas Carols, Concerts, Parades, New Year’s celebrations, and Australia Day activities within
  the Noosa Council area.

  Council Festive Season Event Grants will contribute to costs associated with:
  e  Expenses related to hire of equipment, temporary structures, professional services and promotion
     and advertising of the event; and / or
  e  Traffic management plans including traffic control services.
  Funding will be capped and Council will require a contribution to the event from the event organiser
  or a third party.
  If Council decides to continue with the program, renewal of agreements will be negotiated three
  months prior to their expiry, and if funds allow, invite expressions of interest from eligible not for profit
  community organisations.
  Recipients of Three Year Festive Season Event grants are ineligible for Three-Year Community
  Alliance Agreements and Three Year Maintenance Agreements.

                                                                                            Page 3

                                                                                            Page 57 of 94

Section 58

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 58 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     12 FEBRUARY 2019

   4.    Three Year Signature Community Events Grants
   This funding will provide financial support for up to three years to eligible not for profit community
   organisations who have an established track record of hosting a signature event that provides
   significant benefit to the Noosa community; demonstrates value for money; and closely aligns with
   Council’s strategic goals and identified key initiatives.
   Recipients will be required to provide an annual acquittal (including audited financial statements)
   demonstrating delivery of agreed outcomes.
   Council’s Signature Community Events Grant will contribute to costs associated with:
   e  Expenses related to hire of equipment, temporary structures, professional services and promotion
      and advertising of the event; and / or
   e Traffic management plans including traffic control services.

   Successful applicants will need to:
   e  Provide an achievable operational or strategic plan for the event.
   Funding will be capped and Council will require a contribution to the event from the event organiser
   or a third party.
   If Council decides to continue with the program, renewal of agreements will be negotiated three
   months prior to their expiry. As part of its annual budget process Council will consider whether or not
   to invite additional organisations to be considered for funding under this program.
   Recipients of Three Year Signature Community Event grants are ineligible for Three-Year
   Community Alliance Agreements and Three Year Maintenance Agreements.

   5.    Three Year Community Alliance Agreement
   This funding will provide financial support for up to three years to eligible not for profit community
   organisations whose services provide significant benefit to the Noosa community (beyond their
   membership); demonstrate value for money; and closely align with Council's strategic goals and
   identified key initiatives.
   Council will initially call for expressions of interest for this grants program from organisations who
   offer services in one of the following areas:
   e Arts and cultural development
   e  Community development
   e  Community safety
   e  Heritage
   Successful applicants will need to:
   e  Provide an achievable operational or strategic plan for the duration of the agreement
   Council will establish funding amounts for the individual Three-Year Community Alliance
   Agreements as part of its annual budget process. Recipients will be required to provide an annual
   acquittal (including audited financial statements) and a progress report demonstrating delivery of
   agreed outcomes. If Council decides to continue with the program, renewal of agreements will be
   negotiated three months prior to their expiry, and if funds allow, invite expressions of interest from
   eligible not for profit community organisations.
   Recipients of Three-Year Community Alliance Agreements are ineligible for Three Year Maintenance
   Agreements and Three Year Signature Community Event Grants.

                                                                                             Page 4

                                                                                            Page 58 of 94

Section 59

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 59 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 12 FEBRUARY 2019

  6.    Three-Year Maintenance Agreements
  This funding will provide financial support up to three years to eligible not for profit community
  organisations that maintain Council and community infrastructure. There are two categories:
  e Maintenance and management of community halls or centres. Eligible community organisations
     may receive part funding for on-going operational and/or maintenance purposes of Council
     infrastructure only where that infrastructure is publicly accessible.
  e  Sports field maintenance. Eligible sporting organisations may receive part funding for on-going
     maintenance of sporting fields. The organisations must have primary responsibility for fields that
     are open to the public when not being used by those organisations.

  Three-Year Maintenance Agreements operate by invitation-only rather than through a competitive
  process. Recipients will be required to provide an annual acquittal and demonstrating delivery of
  agreed outcomes. If Council decides to continue with the program, renewal of agreements will be
  negotiated three months prior to their expiry. Council will establish funding amounts for the individual
  Three-Year Maintenance Agreements as part of its annual budget process.
   Recipients of Three-Year Maintenance Agreements are ineligible for Three Year Community Alliance
  Agreements and Three Year Signature Community Event Grants.

  7.    Water Rebates
  Council will fund Unitywater fixed water and sewerage access charges for eligible not for profit
  organisations as defined in this Policy. The maximum annual funding for each organisation will be
  limited to the minimum water and sewerage access charges (based up to and including 25mm
  meters) for each land parcel unless there is a legal requirement or hydrology report that requires the
  organisation to have a larger water meter or additional meters.
   In addition Council will fund the annual water consumption charges of all eligible not for profit
  organisations up to a maximum of $1,000 per annum, however, organisations with consumption
  charges over $250 per annum will be required to have a Council approved water management plan
  in place.
  The cost of the water rebate will be identified and funded through the Community Grants Program
  as it forms part of Council’s support to community organisations.

  8.    Building Insurance Cover
  Council will cover the cost of building insurance for eligible not for profit community organisations
  (as defined in this policy) with facilities built on Council owned or controlled land. The insurance
  provided by Council will be incorporated into Council’s Local Government Mutual (LGM) Asset
  Scheme Industrial Special Risks coverage. The cover will only be provided on the terms offered by
  the LGM to Noosa Council and is not negotiable for individual groups.
  The cost of this insurance will be identified and funded through the Community Grants Program as
  it forms part of Councils support to community organisations. Council may require community groups
  covered by this scheme to meet excess charges in the event of any claim.

                                                                                           Page 5

                                                                                       Page 59 of 94

Section 60

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 60 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   12 FEBRUARY 2019

  APPLICATION PROCESS
  All community grant applications must be submitted by the advertised closing date and time.
  Applications received after the closing date and time will not be accepted.
  Applications for Community Project, Festive Season Event and RADF grants must be submitted
  online on a current Grant Application Form made available by Noosa Council. Applicants must have
  spoken with a Council Officer prior to submitting the grant.
  Three-Year Maintenance Agreements operate by invitation-only rather than through a competitive
  process.
  Water Rebates and Building Insurance Cover will be arranged for eligible recipients and these
  organisations will not be required to complete an application form.

  OUT OF ROUND FUNDING
  In exceptional circumstances, or cases of significant hardship, Council may consider special one-off
  funding outside the scheduled grant timeframe.

  CONDITIONS OF FUNDING
  All successful applicants will be required to enter into a funding deed of agreement with Council and
  acquit funds within the allocated timeframes. The timeframes and acquittal requirements are outlined
  in the supporting Grant Guidelines for the specific funding program. Successful applicants will be
  required to actively and publicly acknowledge Council’s support.

  COUNCIL’S ROLES AND RESPONSIBILITIES
  Council will publicise the availability of its grants programs widely and in such a way as to promote
  public confidence in the process. In assessing the grants, Council will:
  e  Ensure public monies are allocated in a fair and equitable way;
  e  Ensure best possible value for money;
  e  Check each application against eligibility criteria and assessment criteria, as set out in the
     appropriate Grant Guidelines; and
  e  Seek recommendations from an expert panel that can comprise Council officers, Councillors
     and/or community representatives.

  Council will determine the total allocation of funds to the community grants program through its
  annual budgetary processes. The number and types of grants approved by Council will depend on
  the demand for funding, the available program budget and Council priorities. In some instances, part
  funding may be offered. Funding priorities for individual grant programs will be regularly reviewed to
  ensure their relevance and they continue to meet Council objectives.
  Council officers are available to provide advice to applicants. They will also assist applicants to
  identify additional and alternative sources of funding relevant to their project or event. Council officers
  and Councillors are responsible for recognising and declaring any actual or potential conflicts of
  interest. This may include, but is not limited to, personal connections with the applicant. Anyone
  having a determined conflict of interest should not debate or be involved in any discussions on any
  matter relating to that application.

                                                                                           Page 6

                                                                                         Page 60 of 94

Section 61

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 61 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 FEBRUARY 2019

    Council officers are required to adhere to this policy when supporting, facilitating, or delivering
    grants-related activities. It is the responsibility of Council officers to ensure that grants and funding
    provided from public monies are:
   e Administered transparently and accountably;
   e Aligned with Council’s objectives, goals and priorities;
   e  Effectively advertised and promoted to the community so that all potential applicants have equal
      opportunity to apply for funds; and
   e  Monitored for compliance against set performance measures.

    Final decisions in the Community Grants Program are made by the Council, CEO or delegate.

    RELEVANT DOCUMENTS
   e   Councils     adopted      strategic    documents      as     can      be     found     here:
       https://www.noosa.qid.qov.au/principles-plans-strategies

    RELEVANT LEGISLATION
    Queensland Government
   e  Local Government Regulation (2012)
   e  Local Government Act (2009)
   e  Statutory Bodies Financial Arrangements Act (1982).

    DEFINITIONS
   Acquittal
   This is the process by which a recipient demonstrates in writing to the funding body that it has
    expended the funds in accordance with the terms and conditions of the funding agreement on
    completion of the activity or project. The acquittal process, when conducted correctly, demonstrates
   that these monies were being used efficiently, effectively or that the community is getting value for
    money for services.
   Auspice
   Auspice means that an organisation takes responsibility for ensuring the funds are used as specified
    in the grant allocation. An auspicing organisation will be responsible for:
   e  Sign off on the funding agreement;
   e The receipt, banking and administration of all monies;
   e  Project monitoring and completion;
   e  Ensuring the applicant acquits the funding on time; and
   e Sign off on the acquittal form.
    Business
    For the purpose of this policy, business is defined as an organisation or enterprising entity
    engaged in commercial, industrial or professional activities for profit. This may be in the form of a
    sole trader, company or partnership. (Sole trader} an individual operating as the sole person
    legally responsible for all aspects of the business.[Companyt a legal entity separate from its
    shareholders.             an association of people or entities running a business together, but not
    as a company).
    Business Trust
   An entity that holds property or income for the benefit of others.

                                                                                             Page 7

                                                                                           Page 61 of 94

Section 62

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 62 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 FEBRUARY 2019

  Community
  For the purpose of this policy, community refers to a group of people living within the Noosa Shire
  local government boundaries.
  Conflict of Interest
  A conflict of interest is a conflict between an officer's or councillors personal interests (including
  personal interests arising from their relationships or memberships, for example) that might lead to a
  decision that is contrary to the public interest.
  Donations
  Donations are defined as a voluntary gift of product, service or cash without expectation of return.
  Funding Agreement
  A legal agreement entered into by the successful applicant and Council noting the obligations of both
  parties.
  Grant
  Funds provided to a recipient through a formal program for a specified purpose, directed at achieving
  goals and objectives consistent with Council policy, where the recipient is selected on merit against
  a set of criteria. Funding is subject to entering a written agreement with Council that outlines
  accountability requirements.
  Grant Guidelines
  The grant guidelines will include:
  e  Purpose of the grant
  e  Key dates
  e Assessment criteria
  e  How to apply
  e  How to acquit
  Individuals
  Individuals are classified as a singular person or couple, as distinguished from a group, who carry
  on activities for a community purpose and benefit.
  Organisations
  For the purposes of this Policy the term Organisations means:
  e  Incorporated Associations (incorporated under state legislation, commonly have ‘Association’ or
     ‘Incorporated’ or ‘Inc.’ in their legal name);
  e  Incorporated  Cooperatives   (also incorporated   under state   legislation, commonly   have
     ‘Cooperative’ in their legal name);
  e Companies (incorporated under the Corporations Act 2001 — may be proprietary company (limited
     by shares or by guarantee) or public companies); and
  e Aboriginal Corporations (incorporated under the Corporations (Aboriginal and Torres Strait
     Islander) Act 2006)
  Naming Rights
  The right to name property, either tangible property or an event, usually granted in exchange for
  financial consideration.

                                                                                            Page 8

                                                                                          Page 62 of 94

Section 63

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 FEBRUARY 2019




                                                       Page 63 of 94

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 FEBRUARY 2019

   Not for profit community organisation
   A community organisation that operates as an incorporated organisation (as defined above) with a
   primary purpose of providing services to the community and is not carried on for the direct or indirect
   profit or gain of its members, both in its operations and winding up.
   Public Interest
    For the purpose of this policy, public interest refers to ‘the welfare of the general public in contrast to
   the interest of an individual or group’.
   Service Level Agreements
   Service Level Agreements are a formally negotiated agreement between Council and an
   organisation, individual or community group which details the nature, quality and scope of a service
   to be provided. The purpose of a service level agreement is to formalise the services of a provider
   and outline the responsibilities of both Council and the provider in the provision of a service.
   Sponsorship
   Sponsorship is a contractual business arrangement under which a sponsor, for a specified term,
   provides a contribution in cash and/or in kind (“contra”) in return for specified commercial benefits.
   Transparency
   Transparency refers to the openness with which the administration of funds and obligations between
   entities are discharged.

   Version control:
      Version | Reason/ Trigger               Change | Endorsed/ Reviewed by       Date
                                              (Y/N)

      4.0       Amendment to Policy                      N   a    Counci            16  ne 2016

                                                                                               Page 9

                                                                                             Page 63 of 94

Section 64

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 FEBRUARY 2019



REPORTS FOR NOTING BY THE COMMITTEE


4                        ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT UPDATE -
                         2ND QUARTER 2018-19
DOCUMENT INFORM AT ION




Author                              Director Environment and Sustainable Development, Kim Rawlings
                                    Environment and Sustainable Development Department

Index                               ECM/ Subject/ Environment and Sustainable Development Reports

Attachments                         Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Environment and Sustainable Development to the
Planning and Environment Committee Meeting dated 12 February 2019 providing an update on
operations of the Environment and Sustainable Development Department for the period 1 October
to 31 December 2018.



REPORT
The adopted organisation structure includes the following branches under the Environment and
Sustainable Development Department:
                       Environmental Services;
                       Strategic Land Use Planning;
                       Economic Development;
                       Development Assessment; and
                       Building and Plumbing
This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the Environment and Sustainable Development Department.




                                                                                            Page 64 of 94

Section 65

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                              12 FEBRUARY 2019


ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT

BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                              THE NEXT QUARTER
Director’s office
Sustainability Institute Feasibility Study      Final report received from CSIRO on           Distribute Final Report internally            Council consideration of Phase 1
Stage 1                                           phase 1 – this report investigates the                                                          report
                                                  concept of a Sustainability Institute
                                                  and analyses a range of case studies
                                                  from various institutes across
                                                  Australia and the world
Policy to eliminate single use plastics         Cross Council working group                   Work with Tourism Noosa to continue           Draft   Policy   to   Council    for
from Council business                             established to consider barriers and            to support Plastic Free Noosa                   consideration
                                                  opportunities for eliminating single            Initiative
                                                  use plastics from all Council business        Develop Council policy on elimination
                                                Survey of all areas of Council                  of single use plastics from Council
                                                  business to determine use, potential            business for internal review
                                                  alternatives and expenditure on
                                                  plastics has been completed
Environmental Services
Noosa Environment Strategy                      Completion of community workshops             Finalising first draft of the policy and      Present to Council for release for
                                                  and second workshop with forum                  strategy.                                       community consultation.
                                                  participants.                                 Preparing draft for community                 Report Environment Grants policy to
                                                Your Say Noosa feedback completed               consultation.                                   Council for consideration.
                                                  and reviewed.                                 Draft Policy for Environment Grants
                                                                                                  program developed
Development of new Noosa River Plan             Undertaken Councillor workshops on            Finalise risk assessment for threats          Work with consultants on sustainable
                                                  transfer or state responsibilities and          and     values,     from     community          fishing options paper.
                                                  sustainable fishing.                            feedback.                                     Prepare restructured draft of the
                                                Used community feedback to                    Incorporate Councillor feedback on              River Plan for Council.
                                                  undertake risk assessment against               takeover of state responsibilities.
                                                  identified values to better inform final
                                                  action plan.
                                                Started consultancy on sustainable
                                                  fishing in the Noosa River to inform
                                                  final draft of plan.




                                                                                                                                                                    Page 65 of 94

Section 66

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                          12 FEBRUARY 2019


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                              THE NEXT QUARTER
Implementation of the ZEN Organisation      Completion of Councillor workshops           NAC residual solar system                     Landfill emission reductions
Strategy                                      on the 2017/18 carbon footprint,             LED lighting retrofits                        Community emission reductions
                                              science based targets and further            Noosaville library solar installation         Carbon offset investigations and
                                              emission reduction initiatives               Cooroy       Butter    factory     solar        review
                                            Completion of Councillor workshops             installation                                  Annual Report to Council on ZEN
                                              on the Noosa community carbon                Noosa River Holiday Park solar                  Strategy     implementation   and
                                              footprint,    IPCC     2018     report       ZEN Strategy review                             progress
                                              implications and opportunities for
                                              Council to assist community
                                            Commencement of the LED lighting
                                              upgrade at the Tewantin Admin
                                              building
                                            Submitted applications for Qld Govt
                                              Land Restoration Fund grants
                                            Tewantin Admin building solar tender
                                              evaluation completed
                                            Community ZEN events
Private Land Conservation Partnerships      Community        Partnerships      role      Keeping up with scheduled visits,             Finalise new regional coordination
- Land for Wildlife and Voluntary             currently vacant due to Kylie Gordon           utilising members of the Natural                structure for Land for Wildlife, moving
Conservation Agreements.                      leaving the role in January.                   Areas team to undertake visits. New             away from Healthy Land & Water, to
                                            Represented Noosa at the Strategic             visits for the program are currently            a Regionally coordinated and
                                              Sub-Committee meeting for Land for             booked until the end of April with the          managed structure.
                                              Wildlife and developed a briefing note         resources available, applications for         Assess resources required to meet
                                              and business case in collaboration             new memebers are effectively on                 demand for the program into the
                                              with 11 other SEQ Councils for new             hold until after April.                         future.
                                              regional coordination arrangements.          Reviewing vacant role with a view to          Prioritise properties that have
                                                                                             recruiting ASAP.                                expressed an interest in establishing
                                                                                                                                             VCA’s, through the Environment
                                                                                                                                             Levy Working Group.
Community Bushland Care Program             New Bushcare coordinator Ryan                Finalising annual workplans for all of        Promoting the new groups.
                                              Henney now well established in the             the Bushcare groups.                          Look at options for new Bushcare
                                              role.                                        Start-up of three new groups for the            groups in early 2019.
                                            Christmas     volunteer     break-up           program;
                                              successfully held at Peregian Beach.           o Rainbow Park , Sunshine Beach
                                                                                                 (maintaining    and   improving
                                                                                                 Glossy Black Cockatoo habitat)
                                                                                             o Weyba        Creek    Environment
                                                                                                 Reserve (Elysium estate)


                                                                                                                                                                 Page 66 of 94

Section 67

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                    12 FEBRUARY 2019


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
                                                                                           o   Cooran Fodder Farm (harvesting
                                                                                               fodder for wildlife care)

Sustainable Fisheries Direction Paper      Report presented to Council and             Work with consultants to ensure           Consultant to present to Councillors
                                             approval to undertake consultancy.            some local consultation and provide         in late February on data collected and
                                           Fresh       Advisory     conmsultancy         information  and     feedback    as         interim findings.
                                             successful in tender process, with            required.
                                             contract signed in early January.
Bring Back The Fish                        Council provided in-principle support       Developing partnership agreement          Developing partnership agreement
                                             to match The Nature Conservancy               with The Nature Conservancy to              with The Nature Conservancy to
                                             $1.2 million funding for expansion of         formalise partnership.                      formalise partnership.
                                             the Noosa River Oyster Reef
                                             rehabilitation project.
Environment Levy Land Acquisition          Nature refuge processing completed          Following up with State on Nature         Working towards start of revegetation
Program                                      for John’s Landing                            Refuge processing for Cooloothin.           projects at Yurol-Ringtail site.
                                           Yurol-Ringtail Conservation Project
                                             signing ceremony held and financial
                                             contribution paid into trust.
                                           Continue maintenance          works at
                                             Johns Landing and Cooloothin

Pest Management                            Completed 2nd quarter of Biosecurity        Property inspections and compliance       Complete 3rd quarter of biosecurity
                                             Surveillance Program including the            activities as part of approved              surveillance program.
                                             inspection of properties in the Black         Biosecurity Surveillance Program.         Complete annual contract work for
                                             Mountain, Federal and Ridgewood             Priority weed control on State              Transport and Main Roads.
                                             areas.                                        controlled road reserves as part of       Property inspections in the Six Mile
                                           Completed annual Fox den detection            annual contract work for Transport          Ck catchment area for the mapping of
                                             program including mapping and                 and Main Roads.                             Cat’s Claw Creeper.
                                             fumigation of occupied dens.                Feral Deer control in the Lake            Project Scope to be developed for
                                                                                           MacDonald area.                             review of Pest Management Plan (
                                                                                         Wild dog/fox trapping and baiting in        Biosecurity Plan)
                                                                                           priority areas including Noosa Nth
                                                                                           Shore, Kin Kin and Federal.
                                                                                         Contractor engagement for pest
                                                                                           animal trapping for annual six week
                                                                                           term.




                                                                                                                                                          Page 67 of 94

Section 68

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                         12 FEBRUARY 2019


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                               THE NEXT QUARTER
                                                                                         Inspection and engagement of
                                                                                           property owners in the Six Mile Ck
                                                                                           catchment area for the mapping and
                                                                                           control of Cat’s Claw Creeper.
Noosa Bushland Reserve Strategic Plan                                                    Continue to develop document with              Host workshop with Councillors and
                                                                                           new additions to stakeholder groups              receive feedback.
                                                                                           and edit where required.
Noosa Trail Network                          Re-opening of Trail 8 up to Mary          Working with consultant on Master              Review of draft Master Plan when
                                               River Rd.                                   Plan for trail network in partnership            available.
                                                                                           with Toursim Noosa.
Noosa Parklands Management Plan              Ecological    Restoration    Plan
                                               completed and being implemented.

Strategic Land use Planning
Drafting new Noosa Plan                      Responded to State on all the State       Finalise material for consultation             Undertake Shire wide community
                                               Interest questions and comments           Report to Council recommending                   consultation on the draft plan.
                                             Received State approval to consult          public consultation on the Draft Noos
                                               on draft plan                               Plan
                                                                                         Organise static and pop-up customer
                                                                                           displays
                                                                                         Give     public      notification     and
                                                                                           commence media
Biodiversity Plan and assessment report      Awaiting further progress on high         Draft priorities for the Environment           Finalise priorities for Environment
                                               level Environment Strategy to refine        Strategy including workshopping and              Strategy including for biodiversity
                                               the scope of Biodiversity Plan              drafting priorities for biodiversity.            conservation

Climate Change Adaptation Plan               Community engagement campaign             Complete key asset register and risk           Commence socio-economic analysis
                                               completed for the coastal hazard            assessment report for submission to              of adaptation options; validate whole-
                                               modelling.                                  LGAQ & State government; advance                 of-Shire    multi-sectoral     climate
                                             Tidal inundation modelling further          climate    change       biodiversity             change risk assessment results with
                                               developed.                                  assessment; stage 2 of community                 sector experts.
                                                                                           engagement campaign, including
                                                                                           workshop.
Business as Usual activities                 General advice and advocacy
                                             Customer enquiries




                                                                                                                                                               Page 68 of 94

Section 69

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                      12 FEBRUARY 2019


BRANCH ACTIVITIES                     RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                            THE NEXT QUARTER
Economic Development
Local Economic Plan implementation      LEP Monitoring Report issued to                Complete Annual Plan and budget             Issue external report card on LEP
                                          Councillors in December. Of 68                   2019/20 that includes LEP priorities          implementation progress
                                          actions, 52 or 79% either completed
                                          or progressing well
Business Support and Development        Sunshine Coast Business Awards                 Working      with   potential   grant       Providing ‘concierge’ services to key
                                          2018 – Record number of Noosa                    applicants    to    develop    quality        clients
                                          entries. 19 finalists with 7 winners out         applications with high impact               Continue to promote and improve the
                                          of a total of 22 across the Sunshine             outcomes.      Potential   applicants         quality of Grant applications
                                          Coast.                                           include; CCIQ Noosa, Innovate
                                        Start-up program delievered with                 Noosa, Create Noosa, Generation
                                          SCRIPT funding                                   Innovation, Noosaville Business
                                        Concierge service provided to                    Association
                                          multiple    stakeholders       including:      Regional Innovation Program –
                                          Alkira Software, Prism Properties,               working with partners to establish a
                                          Business Mentors Noosa                           sustainable governance model
                                                                                         Providing ‘concierge’ services to key
                                                                                           clients
Industry & Sector Development           Digital Hub - Hosting monthly                  Digital   Hub     –    Continue     to      Digital Sector - finalise operational
                                          networking events for key digital                ‘operationalise’ the Digital Hub.             management of the Digital Hub.
                                          industry       groups,        including          Including Launch of the ‘Barception’          Focus     on    expanded      revenue
                                          technologists      and      blockchain           service                                       opportunities and program expansion
                                          professionals.                 Curating        Education Sector – finalise NETA            Digital Hub expansion – lead design
                                          educational/skills programs to inspire           action plan and funding                       of next stage as part of Rufous Street
                                          and develop young talent                       Tourism – continue to be part of the          project
                                          Empowering        promising      young           Industry        and       Sustainable
                                          entrepreneurs through internships,               Development working group
                                          work experience and mentorship
                                          Educating and inspiring local industry
                                          and community influencers by hosting
                                          presentations from Digital thought
                                          leaders
                                        Education Sector – appointed a
                                          facilitator to support the Noosa
                                          Education and Training Alliance
                                          (NETA)




                                                                                                                                                            Page 69 of 94

Section 70

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                    12 FEBRUARY 2019


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                            THE NEXT QUARTER
                                           Rural & Agribusiness Sector – Council
                                             supporting food tourism collaboration
                                             involving Tourism Noosa, FAN, Slow
                                             Food Noosa and Country Noosa
                                           Sustainable Tourism – working on
                                             Noosa Trails Master Plan project,
                                             Value of Tourism research, and
                                             assessing opportunities for Business
                                             Events
                                           Transport – Govhack event, hosted at
                                             the Digital Hub provided winning
                                             entries related to innovative tech
                                             transport solutions
Communications and Marketing Program        Business      Section    now   more       Continued promotion of the Peregian         Development and adoption of a
                                              prominent and updated on Noosa              Beach Digital Hub                             marketing    and     communications
                                              Council website.                          Development of marketing collateral.          strategy.
                                            Finalised purchase of new economic        Finalise CRM system to support              Rollout content calender with support
                                              data and economic impact tools from         marketing activity                            from Council community engagement
                                              economy.id                                Update economy.id tools on Council            team
                                            Digital Nomads campaign launched            website
                                              with Tourism Noosa support
Leadership & Strategy Program               RDA Sunshine Coast – Economic             Support and Influence regional              Contribute to the strategic plan
                                              Development Manager ex-officio              priorities through involvement with           associated     with     the    $2.5M
                                              member of RDA Sunshine Coast                RDA, Sunshine Coast Business                  announcement for the Rufous Street
                                            CCIQ Noosa / Innovate Noosa –               Council and others                            and Digital Hub project
                                              supported events and transition to a                                                    Lead business engagement for New
                                              new Committee                                                                             Planning Scheme
                                            Signage review – contributed to                                                         TAFE site – contribute to the ongoing
                                              strategic review of signage                                                               assessment of options
Business as Usual activities                Represent Council at a range of           Client management         and   inward      Ongoing       business        enquiry
                                              business and network forums                 business enquiries                            management
                                                                                        Meetings with key         stakeholders
                                                                                          internally / externally




                                                                                                                                                           Page 70 of 94

Section 71

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                              12 FEBRUARY 2019


BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                               THE NEXT QUARTER
Development Assessment
Local Government Infrastructure Plan for      State sign off new LGIP to support           Prepare for Public Notification of draft        Public notification of LGIP
next planning scheme                            New Noosa Plan                                 LGIP and supporting documents
Auditing program for Advertising Devices      Agreements continue to be reached            Initiating preparation of Local Law for         Workshop to be held with Council on
                                                with a number of business owners in            advertising signage, informed by                  options for regulating signange under
                                                Tewantin,     Noosa    Junction   &            audit results                                     Local Law
                                                Noosaville to address non- compliant                                                           Continue auditing program for
                                                signage                                                                                          advertising devices – Eastern
                                                                                                                                                 Beaches & Hinterland area
Business as Usual activities                  Monthly reporting to Treasury QLD            Eaglerise appeal underway                       Continued         assessment       of
                                                State Government and Australian              Conditions for Thomco prepared and                Development Applications lodged
                                                Bureau of Statistics on development            are with applicant                                under The Noosa Plan
                                                approval information                                                                           Supporting        the      community
                                                                                                                                                 engagement and public notification
                                                                                                                                                 process for the New Noosa Plan

Building and Plumbing
Legislative Review                            Preparation for the introduction of the      Continue to develop procedures and                  Attendance at next legislative
                                                amended Plumbing and Drainage Act              processes for the adoption of new                     workshop in Brisbane - completed
                                                2002 continued with the new                    legislation                                         1st July commencement for new
                                                Plumbing Act 2018 legislative                Implementation of Plumbing Works                      Plumbing and Drainage Act 2018
                                                obligations.                                   Permit template and             inhouse               and       Standard      Plumbing
                                              Attend second legislative meeting in           processes to replace existing                         Regulations
                                                Brisbane with State Government to              compliance certificate.
                                                discuss       Local       Government         Preparing for reduced timeframes for
                                                obligations under new Plumbing and             legislative plumbing approvals “20
                                                Drainage Act 2018.                             days reduced to 10 days”
Business as Usual activities                  Meeting      legislative    timeframe        Maintain        existing      legislative       New Plumbing and Drainage fast
                                                requirements for 80% of plumbing               timeframes and obligation.                        track approval processes and permits
                                                applications.                                Identify new Legislative fines and                have been developed to meet
                                              RABs and Document Lodgements                   State approvals for SPER. Building                Councils obligations under new
                                                90% meeting time frames                        Act has been completed but more                   Plumbing and Drainage Act
                                              Monthly reporting to Treasury QLD              work to be undertaken in regards to             Joint meeting with Distribution
                                                State Government and Australian                new Plumbing Act.                                 Retailers and Regional Councils for
                                                Bureau of Statistics timeframes on           Tribunal preparation                              the development of a new domestic
                                                track.                                         - 45 Shorehaven Drive preparation                 and      commercial     “connection”
                                              Complaint and investigation reporting          for tribunal – waiting for hearing date.          approval agreement – Completed
                                                timeframes on track

                                                                                                                                                                     Page 71 of 94

Section 72

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                  12 FEBRUARY 2019


BRANCH ACTIVITIES                   RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
                                       Council had success in the following                                                        existing agreement to stay in place
                                         appeals :                                                                                   for the time being.
                                         1. 18 Callitirs Street – Marcus
                                              Beach, Garage setback.
                                         2. 55 Crank Street, pool within side
                                              boundary setback 9 Mermaid
                                              Key, Dwelling within side
                                              boundary setbacks
                                         3. 11 pickering Court, Shed within
                                              side setbacks
                                         4. 36 Tedford Drive, garage and
                                              carport within front boundary
                                              setback
Plumbing and Building Audit,           Audit Programme stage one of four            Mail out to identified commercial
Educational Programmes                   stages (Backflow Prevention Device)            properties subject to ( Backflow           Undertake a desk top analysis with
and Swimming Pool Immersions             Stage one completed and stage two              Prevention     Device      )    audit        identified results of audits (estimated
                                         to commence in March 2019.                     programme, underway                          programme timeframe = 9 months)
                                       Swimming        Pool      educational        Prepare a further mail out to another        This programme is 90% completed to
                                         programme – Council developed                  1,000 pool owners within the Shire.          date.
                                         educational brochures mail out to first      Continue to investigate and prepare        Manage cutomers request for site
                                         1,000 pool owners within the Shire .           reports for State and Federal                inspections of existing swimming
                                       Continue to investigate swimming               agencies    for    swimming      pool        pools
                                         pool immersions as requested by                immersions within the Shire                Identify appropiate swimming pool
                                         Queensland Health.                                                                          safety signage for customers
Compliance Approvals –Council and      Boreen Point Camp Ground – Design            Plumbing approval for Hastings Sreet       Continue to work with internal council
Community.                               and approval                                   bottle filling station                       and commutity groups.
                                       Water      Meter     Location     and        North Shore Wilderness Camp,
                                         investigations                                 Design and Plumbing approval for
                                       Pony Club Plumbing plumbing                    Alternative solution (plumbing and
                                         application and design                         waste water)
                                       Johns Landing Demolition and                 Noosa Tip – Building and Plumbing
                                         building approval                              approvals
                                       Shade Sail Building approval Wave
                                         Cres Park




                                                                                                                                                         Page 72 of 94

Section 73

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                    12 FEBRUARY 2019


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                            THE NEXT QUARTER
State Government Form 4A Process           Council opted in to this new plumbing      Meet with all Public enities including      Undertake Shire wide audits
Implementation Audit Programme.              minor work audit programme                   Noosa Council representitives to            Continue to meet with Unitywater, Q
(included in programme: Federal,State                                                     discuss processes for audits and              build and Main Roads representitives
and Local Government Agenties)                                                            plumbing work applications –                  to discuss the development of this
                                                                                          completed but further work is                 programme.
                                                                                          required with Q-Build Queensland
                                                                                          and Unitywater.




                                                                                                                                                          Page 73 of 94

Section 74

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                12 FEBRUARY 2019


Previous Council Consideration

Nil.

Finance

Nil.

Risks & Opportunities

The Environment and Sustainable Development Department are experiencing high workloads
across all areas, coupled with a number of staff absences and the initiation of public notification
and a Shire wide community engagement program for the Draft New Noosa Plan in the next
quarter. A range of initiatives are being put in place to minimise any potential delays in
Development Assessment and manage customer expectations while maintaining our focus on
good customer service during this period.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Departments/Sections Consulted:

       Chief Executive Officer       Community Services                      Corporate Services
       Executive Officer             Director                                Director
       Executive Support             Community Development                   Financial Services
                                     Community Facilities                    ICT
                                     Libraries & Galleries                   Procurement & Fleet
                                     Local Laws                              Property
                                     Waste & Environmental Health            Revenue Services

       Executive Services        X   Environment & Sustainable Development   Infrastructure Services
       Director                  X   Director                                Director
       Community Engagement      X   Building & Plumbing Services            Asset Management
       Customer Service          X   Development Assessment                  Buildings and Facilities
       Governance                X   Economic Development                    Civil Operations
       People and Culture        X   Environmental Services                  Disaster Management
                                 X   Strategic Land Use Planning             Infrastructure Planning,
                                                                             Design and Delivery




                                                                                        Page 74 of 94

Section 75

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 FEBRUARY 2019


5                        ZERO EMISSIONS NOOSA (ZEN) ORGANISATIONAL STRATEGY UPDATE JULY 2017
                         - DECEMBER 2018
DOCUMENT INFORM AT ION




Author                           Project Officer Carbon Reduction, Anne Nolan
                                 Environment & Sustainable Development Department

Index                            ECM/ Subject/ Carbon Emission Reduction (ZEN)

Attachments                      1.   Electricity consumption data for Council owned large sites



EXECUTIVE SUMMARY
Noosa Council’s Zero Emissions Organisational Strategy 2016-2026 (“ZEN Strategy”) aims to
achieve an ambitious zero net emissions target by 2026. The following report provides details of
the 2017/18 carbon footprint and outlines the actions that have been undertaken over the past
eighteen months in line with the ZEN Strategy and the Cities Power Partnership pledges.

Council’s carbon footprint has been calculated in accordance with the National Carbon Offset
Standard (NCOS). In 2017/8 Council’s carbon footprint was 48381 tonnes CO2e. This is a 6%
reduction compared to 2016/17 and a 13% reduction compared to the base line year of 2015/16.

Emissions from the decomposition of organic matter in the Noosa Landfill comprise over 55% of
Council’s carbon emissions. As a result of improved landfill gas capture and flaring there has been
an 18% reduction in 2017/18 compared to the previous year.

Emissions from electricity consumption in Council operations showed only a small (1%) reduction
compared to the previous year. Council has implemented energy efficiency savings such as LED
lighting upgrades, air conditioning changes and control systems. Council has also installed over
270 KW of Solar PV on 6 Council properties which has resulted in electricity consumption savings
of between 10% - 84% depending upon the site and the size of the PV system. However, these
savings are not yet reflected in the 2017/18 carbon footprint as they were installed in the last month
of the 2017/18 financial year.

Embedded emissions in goods and services related to capital projects and operations increased
by 64% and 11% respectively compared to the previous year. The methodology used to estimate
embedded emissions in goods and services is very conservative and likely to overestimate these
emissions. Council will continue to review and refine the methodology.

To date, Council has focussed on reducing emissions at the source, however it is likely that Council
will reach an “emissions floor” whereby further emission reductions are not technically or
economically feasible, Council will need to consider options for dealing with residual emissions
such as sequestration and offsetting in the future.

RECOMMENDATION
That Council note the report by the Council’s Project Officer Carbon Reduction to the Planning &
Environment Committee Meeting dated 12 February 2019 providing an annual progress update on
the Zero Emissions Noosa Organisational Strategy.




                                                                                            Page 75 of 94

Section 76

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            12 FEBRUARY 2019


REPORT
1.   INTRODUCTION

The purpose of this report is to outline the ZEN activities undertaken during the past 18 months
and includes the calculation of Council’s annual carbon footprint for 2017/18.

This report outlines Council’s achievements in accordance with the Principles and key actions
outlined in the Zero Emissions Noosa Organisational Strategy 2016-2026, the ZEN Organisational
Action Plan 2017-2020 and Council’s pledges under the Cities Power Partnership (CPP).

The Zero Emissions Noosa Organisational Strategy 2016 – 2026 (“The ZEN Strategy”) which was
adopted by Council in 2016 sets an ambitious goal of net zero emissions for Council operations by
2026. The ZEN Organisational Action Plan 2017-2020 (the Plan) outlines the specific actions to
be undertaken to achieve this ambitious goal.

As a member of the Cities Power Partnership (CPP), Council pledged to take action and report on
the following key actions:
1.    Install renewable energy (solar PV and battery storage) on Council buildings;
2.    Support community facilities accessing renewable energy through incentives, support or
      grants;
3.    Implement landfill gas methane flaring or capture for electricity generation;
4.    Adopt best practice energy efficiency measures across all Council buildings, and support
      community facilities to adopt these measures; and
5.    Encourage sustainable transport use (public transport, walking and cycling) through Council
      transport planning and design.


2.   ZERO EMISSIONS NOOSA ORGANISATIONAL STRATEGY 2016-2026

Key Action 1:       Council will continue to improve its knowledge and data collection. It will
                    measure emissions using credible measurement tools.

Council’s 2017/18 carbon footprint has been prepared in accordance with the requirements of the
National Carbon Offset Standard (NCOS) Version 3 and national legislation and relevant
international standards. These included:
 National Greenhouse and Energy Reporting (Measurement) Determination 2008, Compilation
    No. 10, Registered 1 July 2018
 Greenhouse Gas (GHG) Protocol Corporate Accounting and Reporting Standard, 2004
 GHG Protocol Corporate Value Chain (Scope 3) Accounting and Reporting Standard, 2011

The organisational emissions inventory, also known as a “carbon footprint” is defined in
accordance with section 3.3.1 of the NCOS using an “operational control” approach. Under the
operational control approach, an organisation accounts for 100 percent of the Green House Gas
(GHG) emissions over which it has operational control. It does not account for GHG emissions
from operations in which it owns an interest but does not have operational control.

The entities included in the Noosa Council’s carbon footprint cover its administration and
operations across the Shire and includes the following Council operated facilities:
 The J,
 Noosa Aquatic Centre,
 Noosa Leisure Centre,
 Noosa Day Respite Centre,
 Noosa River Holiday Park,

                                                                                  Page 76 of 94

Section 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          12 FEBRUARY 2019


   Boreen Point Holiday Park,
   Noosa North Shore Campground,
   Peregian Beach Digital Hub; and
   Noosa Landfill.

The carbon footprint also includes Council owned streetlights and those provided by Energex but
operated by Council.

Noosa Council owned properties leased to community groups or commercial ventures are not
included in Council’s carbon footprint.

In order to calculate the carbon footprint, three types of emissions are differentiated.

Scope 1 Emissions are direct emissions produced by burning of fuels of the emitter

Scope 2 Emissions are indirect emissions generated by the electricity consumed and purchased
by the emitter

Scope 3 Emissions are indirect emissions produced by the emitter activity but owned and
controlled by a different emitter from the one who reports the emissions.

Emissions associated with the activities within Council’s footprint include Scope 1 or “direct
emissions” including:
 the use of fuel in Council’s transport fleet and stationary equipment; and
 fugitive emissions from the Noosa Landfill.

Emissions from Council’s fuel use were calculated using activity data (litres) and applying the
relevant emission factors for the specific fuel from the current edition of the National Greenhouse
Gas Factors1. Emissions arising from the landfill were determined in accordance with National
Greenhouse and Energy Reporting Scheme Measurement Technical Guidelines for the estimation
of emissions by facilities in Australia – 2017-18 reporting year (October 2017)2.

Scope 2 or “indirect emissions” included the emissions associated with the consumption of
electricity from the national electricity grid in Council’s buildings and facilities and Rate 3
streetlights. Emissions from electricity were calculated using activity data (kilowatt-hours) and
applying the relevant emission factor for Queensland electricity from the current edition of the
National Greenhouse Gas Factors July 20183.

Scope 3 emissions occur from sources owned or controlled by other entities in the Council’s value
chain (e.g., materials suppliers, third-party logistics providers, travel suppliers, lessees and lessors,
franchisees, retailers, employees, and customers). The GHG Protocol Corporate Value Chain
(Scope 3) Accounting and Reporting Standard was applied in the consideration of Scope 3
emissions sources. Council considered the 15 categories listed in Section 5.4 of the Standard and
included the following categories in the calculation of Council’s Scope 3 emissions:
 Purchased goods and services;
 Capital goods; and
 Upstream transport and distribution of fuel.


1 http://www.environment.gov.au/climate-change/climate-science-data/greenhouse-gas-

measurement/publications/national-greenhouse-accounts-factors-july-2017
2 http://www.environment.gov.au/system/files/resources/0e76f367-dfad-451d-8f41-859acfad327a/files/ngers-technical-

guidelines-2017-18.pdf
3 http://www.environment.gov.au/climate-change/climate-science-data/greenhouse-gas-

measurement/publications/national-greenhouse-accounts-factors-july-2017

                                                                                                 Page 77 of 94

Section 78

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 FEBRUARY 2019


Scope 3 emissions were estimated in accordance with the Greenhouse Gas Protocol Technical
Guidance for Calculating Scope 3 Emissions4. It should be noted that emissions embedded in
purchased goods and services were estimated based on the dollar spend for each type of goods
and services purchased. This is a conservative approach to emission calculation and is likely to
overestimate the emissions. Council will continue to review and refine the methodology for Scope
3 emission calculations in accordance with recognised methodologies.

Exclusions: Council recognises that collecting data, assessing data quality, and improving data
quality is an iterative process. The following data is currently excluded:
 Scope 1: refrigerant leakage from air conditioning systems and refrigerators. These emissions
   are likely to be less than 1 % and will not be material to the overall footprint; and
 Scope 3: employee commuting. These emissions are likely to be less than 1% and will not be
   material to the overall footprint.

Key Action 2:               GHG emissions will be measured annually. Progress towards the
                            defined zero net emissions target will be included in Council’s annual
                            reporting.

The 2017/18 Carbon Footprint is presented in Table 1

                                   Noosa Council Carbon Footprint 2017/18
                                           Emissions (tonnes CO2e)             % of total footprint
Scope 1
Transport Fuels                                     896                              1.85%
Stationary Fuels                                    156                              0.32%
Landfill emissions                                 26712                            55.21%
Scope 2
Electricity - large sites                           2094                             4.33%
Electricity small sites                             656                              1.36%
Rate 3 Streetlights                                 105                              0.22%
Scope 3
Purchased goods & services -
operational                                         9769                            20.19%
Purchased Goods & services -
capital                                             5432                            11.23%
Other                                               2560                             5.29%
Total emissions                                 48381
Table 1: Noosa Council Carbon Footprint 2017/18




4 http://ghgprotocol.org/sites/default/files/standards/Scope3_Calculation_Guidance_0.pdf


                                                                                           Page 78 of 94

Section 79

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                12 FEBRUARY 2019


To demonstrate the changes in Council’s emissions over time, Table 2 provides the carbon
footprint by year and illustrates the variance of 2017/18 compared to the previous year.

                                        2015/16      2016/17     2017/18     2017/18 variance from
                                                                                    2016/17
                                       Emissions    Emissions   Emissions   Emissions    Reduction/
                                       (tonnes      (tonnes     (tonnes     (tonnes      increase
                                       CO2e)        CO2e)       CO2e)       CO2e)
 Scope 1
 Transport Fuels                             788          752         896         144     19% increase
 Stationary fuels                            333          303         156        -147    48% reduction
 Landfill emissions                        36122        32697       26712       -5985    18% reduction
 Total Scope 1                             37243        33752       27764       -5988            18%
                                                                                            reduction
 Scope 2
 Purchased electricity Council              2150         2147        2094         -53            2.5%
 Controlled large Sites                                                                      reduction
 Purchased electricity Council               701          632         656          24      4% increase
 Controlled small sites
 Purchased electricity Council               106          104         105          -1      1% increase
 Controlled street lights and public
 lighting (Rate 3)
 Total Scope 2                              2957         2883        2855        -28               1%
                                                                                           reduction
 Scope 3 Emissions
 Scope 3 Emissions - operating              9122         8832        9769         938     11% increase
 Scope 3 Emission - Capital                 3982         3311        5432        2121     64% increase
 Other                                      2539         2615        2560          55     2% reduction
 Total Scope 3                             15643        14758       17761       3003     20% increase
 Total Emissions                         55843          51393       48381        3012    6% reduction
Table 2: Noosa Council Carbon Footprint over time

The carbon footprint is discussion in more detail below.

1.    Scope 1 – Direct emissions

Transport fuels
Emissions from transport fuels have seen a 19% increase since the previous year. This increase
is a reflection of the mileage driven by Council employees on Council duties. The Council fleet
comprise vehicles that are specific for the tasks that they undertake and terrain they are required
to travel. Council recently added three Toyota Prius C vehicles for general staff business travel.

Stationary Fuels
Emissions from stationary fuels have reduced by 48% since the previous year. Stationary fuels
include non-road registered fuel powered equipment, on site generators and fuel sources such as
LPG gas used at the Holiday Parks. The reduction in annual emissions from the stationary fuel
source is as a result of:
 Change from liquid fueled power tools and equipment to rechargeable battery powered
    equipment; and
 Limited use of the stationary generators in 2017/18 compared to the previous year.

                                                                                        Page 79 of 94

The text continues on section 80.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.