Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-02-12 Planning & Environment Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                  12 FEBRUARY 2019


BRANCH ACTIVITIES                   RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
                                       Council had success in the following                                                        existing agreement to stay in place
                                         appeals :                                                                                   for the time being.
                                         1. 18 Callitirs Street – Marcus
                                              Beach, Garage setback.
                                         2. 55 Crank Street, pool within side
                                              boundary setback 9 Mermaid
                                              Key, Dwelling within side
                                              boundary setbacks
                                         3. 11 pickering Court, Shed within
                                              side setbacks
                                         4. 36 Tedford Drive, garage and
                                              carport within front boundary
                                              setback
Plumbing and Building Audit,           Audit Programme stage one of four            Mail out to identified commercial
Educational Programmes                   stages (Backflow Prevention Device)            properties subject to ( Backflow           Undertake a desk top analysis with
and Swimming Pool Immersions             Stage one completed and stage two              Prevention     Device      )    audit        identified results of audits (estimated
                                         to commence in March 2019.                     programme, underway                          programme timeframe = 9 months)
                                       Swimming        Pool      educational        Prepare a further mail out to another        This programme is 90% completed to
                                         programme – Council developed                  1,000 pool owners within the Shire.          date.
                                         educational brochures mail out to first      Continue to investigate and prepare        Manage cutomers request for site
                                         1,000 pool owners within the Shire .           reports for State and Federal                inspections of existing swimming
                                       Continue to investigate swimming               agencies    for    swimming      pool        pools
                                         pool immersions as requested by                immersions within the Shire                Identify appropiate swimming pool
                                         Queensland Health.                                                                          safety signage for customers
Compliance Approvals –Council and      Boreen Point Camp Ground – Design            Plumbing approval for Hastings Sreet       Continue to work with internal council
Community.                               and approval                                   bottle filling station                       and commutity groups.
                                       Water      Meter     Location     and        North Shore Wilderness Camp,
                                         investigations                                 Design and Plumbing approval for
                                       Pony Club Plumbing plumbing                    Alternative solution (plumbing and
                                         application and design                         waste water)
                                       Johns Landing Demolition and                 Noosa Tip – Building and Plumbing
                                         building approval                              approvals
                                       Shade Sail Building approval Wave
                                         Cres Park




                                                                                                                                                         Page 72 of 94
Log in to download the original file

2019-02-12 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.