PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
Transport Fuels
Monitor the opportunities for energy efficiency in Council fleet such as electric vehicles (status
-ongoing).
Electricity consumption
LED lighting retrofit at Tewantin Administration building (status- in progress 2018/19)
Installation of solar PV at Tewantin Administration building (status-planned 2018/19
Expansion of the solar PV system at the Noosa Aquatic Centre – (status-planned 2019/20)
LED pool lighting at the Noosa Aquatic Centre (status-planned 2019/20)
LED Lighting upgrade The J (status planned 2018/19)
Investigate air conditioning improvements at The J (status-planned 2019/20)
Installation of Solar PV at the Noosaville Library (status-in progress 2018/19)
Installation of solar PV at the Noosa River Caravan Park (status-planned 2019/20)
Relocation of the existing 10 KW solar PV system from Tewantin Admin building to the Pomona
Depot (status-planned 2019/20)
Installation of Solar PV at the Cooroy Butter Factory (status-planned 2018/19)
Further investigation of emission reduction opportunities at numerous small sites across
Council (status-planned 2019/20)
Offsets
Develop an Carbon Offset Strategy for residual emissions
Community Engagement
Assist community groups to reduce their electricity consumption, costs and emissions through
Council grants (status – ongoing)
Investigate opportunities for Council to assist the Noosa community reduce emissions (status
– in progress 2018/19)
Previous Council Consideration
Ordinary Meeting, 18 January 2018, Item 8, Page 6
That Council note the report by the Project Officer - Carbon Reduction to the General Committee
Meeting dated 15 January 2018 regarding the Zero Emissions Noosa Organisational Action Plan
2017-2020 and:
A. Approve the Net Zero Emissions Noosa Organisational Action Plan 2017-2020; and
B. As a member of the Climate Council Cities Power Partnership pledge to take action and
report on the following key actions;
1. Install renewable energy (solar PV and battery storage) on Council buildings;
2. Support community facilities accessing renewable energy through incentives, support
or grants;
3. Implement landfill gas methane flaring or capture for electricity generation;
4. Adopt best practice energy efficiency measures across all Council buildings and
support community facilities to adopt these measures; and
5. Encourage sustainable transport use (public transport, walking and cycling) through
Council transport planning and design.
Page 87 of 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.