Original source · versioned page text
Swmp
8.0 CONCLUSION The proposed development has been analysed to provide the design requirements to meet the local authority guidelines for stormwater quality & quantity outcomes described in this report. The lawful point of discharge for the subject site is Council existing stormwater infrastructure in the Blakesley Street road reserve. Sediment generated during the construction phase is to be dealt with in accordance with a Silt and Sediment Control plan and is to be retained on-site throughout construction. The proposed development does not triggers the State Planning Policy 2017 for stormwater quality treatment objectives, however The Noosa Plan 2020 PO6 requires stormwater quality treatment measures. Stormwater runoff from the proposed development will be drained through a water resue tank and bio-retention bed located on-site. Stormwater pits are to be fitted with gross pollutant traps in areas prone to gross pollutants. As requested by Noosa Council, on-site detention has been provided to maintain existing peak flow rates. On-site detention is proposed to be contained within underground tanks and designed to contain all flows up to a Q100 storm event. The subject site is within a defined flood area. The minimum floor level is set a minimum of 300 mm above the defined flood level. Yours faithfully TOM HARRINGTON – RPEQ 27698 For and on behalf of SCG CONSULTING ENGINEERS SCG Consulting engineers 17 SCG Ref: 33094(SWM).Rev A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.