Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

DA-Form-1

of 13
      No
  How many stages will the works include?                             1
  What stage(s) will this development application                     1
  apply to?




  11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
      parts?
  Intended use of parts created               Residential             Commercial              Industrial              Other, please specify:


  Number of parts created

  12) Boundary realignment
  12.1) What are the current and proposed areas for each lot comprising the premises?
                                Current lot                                                                Proposed lot
  Lot on plan description               Area (m2)                             Lot on plan description              Area (m2)
  Lot 6 on RP211337                     1012                                  5                                    1012
  Lot 1 on RP88722                      205                                   4                                    204
  Lot 2 on RP88722                      211                                   3                                    215
  Lot 2 on RP54858                      334                                   2                                    335
  12.2) What is the reason for the boundary realignment?
  Building Encroach onto adjoining properties

  13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
  (attach schedule if there are more than two easements)
  Existing or                Width (m)        Length (m)       Purpose of the easement? (e.g.                     Identify the land/lot(s)
  proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
  14.1) What is the nature of the operational work?
      Road work                                                Stormwater                             Water infrastructure
      Drainage work                                            Earthworks                             Sewage infrastructure
      Landscaping                                              Signage                                Clearing vegetation
      Other – please specify:
  14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
      Yes – specify number of new lots:
      No
  14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
  $

PART 4 – ASSESSMENT MANAGER DETAILS

  15) Identify the assessment manager(s) who will be assessing this development application



                                                                                                                                              Page 5
                                                                                                           DA Form 1 – Development application details
                                                                                                                     Version 1.4— 15 December 2023

Log in to download the original (DA-Form-1.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.