Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2017-05-24 Special Meeting Agenda

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


              Special Meeting


             Wednesday, 24 May 2017

                 commencing at 1.30pm
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2017-05-24 Special Meeting Agenda(PDF, 5MB).pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 34 sections

Section 2

SPECIAL MEETING AGENDA                                           24 MAY 2017


TABLE OF CONTENTS

ITEM                                                                       PAGE


ATTENDANCE & APOLOGIES                                                          -

CLOSED SESSION                                                           3

1      POTENTIAL PURCHASE OF
       LAND                                                                    3

2      ELECTRIC BUS PROJECT            35

MEETING CLOSURE                                                                 -




                                                                     Page 2 of 42

Section 3

CONFIDENTIALITY OF THIS ITEM WAS REMOVED -
                 27/11/2017
CLOSED SESSION


1                        POTENTIAL PURCHASE OF LAND
DOCUMENT INFORM AT ION




Authors                          Director Community Services, Alan (Fox) Rogers
                                 Community Services Department

                                 Principal Environment Officer, Peter Milne
                                 Planning and Infrastructure Department

Index                            ECM/ Subject/ Acquisition/ Purchase/ Disposal

Attachments                      1.   Bugler Francis Valuation
                                 2.   Draft Project Plan



REASON FOR CLOSED SESSION
This report was considered in closed session in accordance with Section 275 (1) of the Local Government
Regulation 2012, which permits the meeting to be closed to the public for business relating to the
following:
(e) contracts proposed to be made by it.




                                                                                    Page 3 of 42

Section 4

SPECIAL MEETING AGENDA                                                                 24 MAY 2017


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Community Services and Principal Environment Officer
to the Special Meeting dated 24 May 2017 and:
A.    Authorise the Chief Executive Officer (CEO) to finalise negotiations for the purchase of the
      parcel of land described as Lot 115 on SP 173075 based on the valuation received from
      Bugler Francis Valuers (provided at Attachment 1 to the report);
B.    If the negotiations in Item A are successful, authorise the CEO to enter into a contract for the
      purchase of the property subject to the conditions of the contract being generally as outlined
      in the report;
C.    Agree that the land purchase is to be funded 70% from the Environment Levy and 30% from
      Council’s General Reserve, and the land be dedicated as a Nature Refuge with a
      conservation protection area and a mixed use zone as shown in Figure 5 in the report; and
D.    Note that the report has been determined as a confidential matter under the Local
      Government Act due to the consideration of a contractual matter but that in the interests of
      transparency, Council will make the report “non-confidential” following settlement.



REPORT
This is a joint report by Principal Environment Officer and Director of Community Services. The
environmental elements of this report have been addressed by the Principal Environment Officer
and the social / community aspects have been addressed by the Director of Community Services.

1.    Background

Johns Landing is a 49.38 hectare, irregular shaped parcel of land on the Noosa River north of Lake
Cooroibah. It has high environmental values including 440 metres of frontage to the Noosa River.
However, the low lying river flats are flood prone and environmentally degraded.

The land has been owned by the Johns family for three generations and is currently being operated
as a camping ground. The current owners Ben and Patricia Johns have announced their intention
to retire.

Following a presentation to Councillors on 2 February 2017 which highlighted the land’s
environmental values and the social issues on site, the CEO requested the Director of Community
Services to enter into discussions with the Johns family regarding the future of the land and refer
the issue back to Council for final consideration. This included the possibility of Council purchasing
the site.




                                                                                        Page 4 of 42

Section 5

SPECIAL MEETING AGENDA                                                          24 MAY 2017


2.    Site description

Johns Landing is situated at 118 Cooroibah Road, Cooroibah. Real Property Description Lot 115
on SP173075.




Figure 1 Locality Map




                                                                                Page 5 of 42

Section 6

SPECIAL MEETING AGENDA               24 MAY 2017




Figure 2 Johns Landing land parcel




Figure 3 Johns Landing Survey Plan



                                     Page 6 of 42

Section 7

SPECIAL MEETING AGENDA                                                                24 MAY 2017


The zoning is rural and the land has a development approval for a camping ground with the
maximum number of campers per week not to exceed 1,470.

In 2011, the Sunshine Coast Regional Council placed an approval condition that all makeshift
dwellings, caravans and buses with the exception of three structures permitted to house the
permanent residents be removed. This has not occurred.

Gagaju Bush Camp also operates from the site offering overnight accommodation and kayaking
for backpackers and other travellers. The current arrangement between the operators of Gagaju
and Ben Johns is based on a handshake agreement.

3.    Biodiversity Values

Over 70% of the site comprises vegetation with significant environmental values - refer Noosa Plan
Biodiversity Overlay Environmental Protection and Riparian Buffer (see map below). Of this, 50%
of the land (mainly in the southern half of the parcel) is mapped as being endangered regional
ecosystem with a further 20% being identified as of concern. There is also significant regrowth in
areas mapped as non-remnant.




Figure 4 Noosa Plan Biodiversity Overlay

Johns Landing is also mapped as potential koala habitat.

The grassed area on the slope just before the house entry was formerly a ploughed area for crops.
This area could potentially be replanted as vegetation offsets for land clearing.

The foreshore of the Noosa River is eroded from indiscriminate access and boat wash but could
potentially be landscaped and revegetated in the future with provision of floating pontoons and
canoe launching facilities.

The lagoon to the west (which is the site of an old sand quarry) is infested with Salvinia molesta, a
water weed, but it is very contained and unlikely to spread.

                                                                                       Page 7 of 42

Section 8

SPECIAL MEETING AGENDA                                                                24 MAY 2017


There are occasional weeds such as Umbrella Tree and Lantana on the property, but no significant
weed infestations.

4.   Social Issues

Progressively over the last two decades Johns Landing has become a place for long term
homeless people to live - some by choice, some because they are in hiding, some because they
have no-where else to go.

Currently it is estimated that almost 70 people (including between 20 - 25 young people) are
residing in the camping ground, many of whom have lived at Johns Landing for years. The quality
of their makeshift housing is very poor.

The Department of Communities and Police are regularly called to the venue for disturbances and
reports of neglect. Over the past few years the Department of Housing, United Synergies
homelessness program and Coast2Bay have attempted to assist people out of the venue, to
various level of success because the camping ground remains open and long term residents often
return there.

The Anglican Church Noosa provides a fortnightly dinner for residents and provide a level of
support and contact to people in need. On a regular basis, 15-20 people attend, some of them are
children whose parents avoid making contact. More recently a group called Campside Rescue
has been providing meals as well.

Council and the RSPCA ran a program in 2016 to desex and register dogs in the camping ground.

Basic hygiene, drinking water quality and vector borne diseases are a concern for Council’s
Environmental Health Officers.

Johns Landing was identified by the Social Strategy Working Group who helped Council to develop
its Social Strategy as the most significant social issue in the Shire.

In recognition of the significant upheaval to those people living at Johns Landing resulting from a
closure of the camping ground, and in accordance with proposed actions in its Social Strategy,
Council has bought together a community round table comprising government agencies and not
for profit groups to assist the people of Johns Landing to transition to new accommodation prior to
any closure of the camping ground.

Council recognises and appreciates the voluntary participation by all organisations in the
roundtable process.

5.   Options for consideration

The impending retirement of Ben Johns and the potential to purchase Johns Landing provides
Council with a unique opportunity to:
1.   Acquire a strategic parcel of environmental land on the Noosa River with high environmental
     values;
2.   Work with a coalition of government and non-government agencies to address the social
     issues present at Johns Landing in a coordinated and constructive way to achieve long term
     positive outcomes for the people living there; and
3.   Acquire at a reasonable price a parcel of land on the Noosa River with the potential to develop
     a portion of the land as a camping ground or day recreation area.




                                                                                      Page 8 of 42

Section 9

SPECIAL MEETING AGENDA                                                                     24 MAY 2017


In considering how to proceed Council needs to consider its options and the best way forward from
a strategic, financial and operational perspective. To assist with this process, four potential options
are outlined below for Council’s consideration. Each option has been subjected to a SWOT
analysis.

Option 1: Council does not purchase the property and allows the camping ground to
          continue to operate as it currently does

 Strengths                                            Weaknesses

    Lowest cost option.                                Continued environmental degradation of Johns
                                                           landing and the Noosa River;
                                                         The social issues at Johns Landing continue to
                                                           multiply as Ben Johns becomes progressively
                                                           less able to manage the camping ground;
                                                         Council by not enforcing its DA conditions by
                                                           default becomes complicit in allowing the above
                                                           mentioned environmental and social issues to
                                                           grow.

 Opportunities                                        Threats

    Nil.                                               In order to progress their retirement plans the
                                                           Johns family sell the land to a developer who
                                                           proposes a major development;
                                                         On-going damage to the Noosa brand
                                                           particularly on social media from visitors to
                                                           Gagaju who are concerned by the conditions
                                                           they encounter on their visit;
                                                         A sudden forced transition for residents if the
                                                           land is bought by a third party.


Option 1 is a continuation of the status quo. It potentially sees the environmental and social issues
at Johns Landing continuing or escalating and exposes Council to serious reputational risks as a
result of inaction. Therefore, it is not recommended.


Option 2: Council does not purchase the property however moves to enforce the DA
          conditions

 Strengths                                            Weaknesses

    Relatively low cost option;                        Continued environmental degradation of Johns
    Ongoing damage to the Noosa brand reduced;           landing and the Noosa River;
                                                         Questions are likely to be raised as to why
    The social problems at Johns Landing cease to        Council has not previously enforced its DA
      multiply and decrease overtime;                      conditions;
    Council enforces its DA conditions.                The environmental values of the land are not
                                                           protected by Council ownership (but the current
                                                           protections under the Biodiversity Overlay would
                                                           continue);
                                                         No deadline for conditions to be enforced.




                                                                                            Page 9 of 42

Section 10

SPECIAL MEETING AGENDA                                                                     24 MAY 2017


 Opportunities                                      Threats

    Potential to engage government and non-          In moving to enforce its DA conditions Council
      government agencies to assist overcome the         would be acting without the support of the Johns
      social problems at Johns Landing.                  family and with only limited support of other
                                                         agencies to assist the transition of a long term
                                                         residents;
                                                       Council is seen to be acting without regard for
                                                         the needs of some of the most vulnerable people
                                                         in our community;
                                                       Enforcing the DA conditions is likely to reduce
                                                         the number of permanent campers at Johns
                                                         Landing and the financial viability of the camping
                                                         ground thereby hastening its sale to a third party;
                                                       In order to progress their retirement plans the
                                                         Johns family sell the land to a developer who
                                                         proposes a major development;
                                                       Potential for increased homelessness in other
                                                         parts of the Noosa Shire.


Option 2 exposes Council to the reputational risk of being seen to be heavy handed with some of
the Shire’s most vulnerable residents; but potentially reduces the social and environmental
problems at Johns Landing.

However, as Council is not acquiring the land pursuing this option could result in the property being
sold to a developer in the short term forcing a sudden transition for residents and a major
development application on an environmentally sensitive site.

When compared with the option of purchasing the land it decreases the amount of support
available from Government agencies who according to their policy framework prioritise the needs
of people requiring accommodation as a result of the closure of a camping ground.

The estimated cost of this option would be $100,000 consisting of $70,000 to engage a suitably
qualified project manager for 6 months to oversee compliance and approximately $30,000 to clean
up the site (See finance section for further details).




                                                                                          Page 10 of 42

Section 11

SPECIAL MEETING AGENDA                                                                        24 MAY 2017


Option 3: Council purchases the Johns property and continues to operate the camping
          ground

 Strengths                                              Weaknesses

    Council acquires a strategic parcel of               This is the highest cost option and no business
      environmental land on the Noosa River with high        case has been developed to justify the
      environmental values;                                  investment in an upgraded camping ground;
    Council ensures the camping ground is run and        Council inherits the social issues on the site;
      developed according to its DA conditions.            If Council moves current residents on and then
                                                             continues to operate the camping ground it could
                                                             be seen to be acting without regard for the needs
                                                             of some of the most vulnerable people in our
                                                             community;
                                                           There is no funding allocated in the 2017/18
                                                             budget for upgrades to the campground and
                                                             given the focus on the Noosa North Shore
                                                             Campground, it is unlikely funding will be
                                                             allocated for a number of years;
                                                           All funding for this option will need to allocated
                                                             from Council’s General Reserve as the
                                                             Environment Levy Policy does not allow funding
                                                             to be used for non-environmental purposes i.e.
                                                             the purchase of a camping ground.

 Opportunities                                          Threats

    Ben Johns retirement presents a momentary            At a practical level the cost and time required to
      opportunity    for   Council    to    maximise         bring the camping ground up to a suitable/safe
      environmental outcomes for the Shire;                  standard means that it would not be able to
    By acquiring the land Council can manage the           continue to operate immediately after
      nature and scale of any redevelopment;                 settlement.
    Potential long term income stream for Council
      from the camping ground (but no business case
      has been undertaken).


Option 3 would see Council acquire a strategic parcel of environmental land on the Noosa River
with high environmental values, however it exposes Council to ongoing difficulties in managing the
social issues on site after settlement as it is unlikely that long term residents will move on.
Furthermore, the cost of bringing Johns Landing camping grounds to a suitable standard are
significant and have not been allowed for in the in the 2017/18 capital works budget preparation.

The estimated cost of this option is $2.5 million plus the cost of upgrading the camping ground to
bring it up to a suitable standard.

There is no estimate of the costs to upgrade the camping ground but they would be substantial
and would need a robust business case and financial modelling before being approved. In any
event, Council is currently focused on the Noosa North Shore Campground site redevelopment
which is scheduled over the coming years.




                                                                                             Page 11 of 42

Section 12

SPECIAL MEETING AGENDA                                                                             24 MAY 2017


Option 4: Council purchases the Johns property, dedicates a significant portion of the land
          as nature reserve conservation area (70%) and focuses on the environmental
          rehabilitation of the land for three to five years

 Strengths                                                 Weaknesses

    Council acquires a strategic parcel of                  Difficulties in managing the transition for current
      environmental land on the Noosa River with high           long term residents to new housing options
      environmental values;                                     before settlement;
    This option is consistent with Council’s long term      Homeless people in the Shire no longer have a
      acquisition of environmentally sensitive land on          shelter of last resort;
      the Noosa River and adjoining creeks in this            The environment levy policy does not allow
      locality as they become available;                        funding to be used for non-environmental
    Council utilises environment levy funds to                purposes i.e. the purchase of a camping ground;
      purchase that portion of the site which reflects        No business case developed to justify Council’s
      the highest environmental values;                         investment in a camping ground;
    The social problems at Johns Landing are                Ben Johns will be reliant on other agencies to
      bought to a head and addressed;                           assist with relocating existing residents.
    By acquiring the land Council can manage the
      nature and scale of any potential development.

 Opportunities                                             Threats

    Ben Johns’ retirement presents a momentary              Squatters remain on the land at the time of
      opportunity     for     Council   to    maximise          settlement;
      environmental outcomes for the Shire whilst at
      the same time providing more certainty of a             Even if all current residents have left the property
      successful transition for the current residents to        a number of temporary homes and shelters and
      alternative accommodation, which would not be             significant amounts of rubbish remain on the
      the case if Council was not the purchaser;                property;
    By acquiring the land Council can control the           Potential for increased homelessness in other
      nature and scale of any future development;               parts of the Shire after settlement;
    There is a focus on the environmental                   Council seen to be acting heartlessly and without
      rehabilitation of the land;                               regard for the needs of some of the most
    Council could consider over time whether there            vulnerable people in our community.
      is a legitimate business case to invest in
      redeveloping a part of the site as a future
      campground or recreation area;
    This option sees the development of a
      Community Roundtable of Government and
      Non- Government agencies working together to
      address social issues (including homelessness)
      in the Shire as per the recommendations of
      Council’s Social Strategy.


Conclusion

Option 4 is recommended as it is the only option where Council can achieve the following
outcomes:
 acquire a strategic parcel of environmental land on the Noosa River with high environmental
   value at a reasonable price;
 address the social problems at Johns Landing by bringing them to a head; and
 leaves open the option of developing a portion of the land as a camping ground subject to a
   satisfactory business case being made.



                                                                                                  Page 12 of 42

Section 13

SPECIAL MEETING AGENDA                                                                  24 MAY 2017


Option 4 is not without risks (eg some residents remain onsite at the time of settlement) which will
need to be carefully managed through the development of a comprehensive project and risk
mitigation plan and communication strategy.

The estimated cost of option 4 is $2.5 million (refer finance section of the report).


6.    Valuation

The market value of the property has been ascertained at $2.2 million by Warren Walker of Bugler
Francis Valuers. Refer Attachment 1 Valuation of Johns Landing by Bugler Francis.


7.    Potential Purchase of Johns Landing using Environment Levy Funds

Two of Council’s Environment Officers undertook a site inspection of Johns Landing on 15
February 2017 to confirm its environmental and biodiversity values and to ascertain whether or not
it was suitable for purchase using environment levy funds.

They concluded that the land was suitable for acquisition using monies from the Environment Levy
as the purchase would be consistent with the Environment Levy Policy and Council’s long term
strategy of acquiring environmentally sensitive land on the Noosa River and adjoining creeks in
this locality (e.g. Franz land, Riley land etc.)

If the site were purchased totally from the Levy the cleared areas of the site could be replanted for
environmental offset purposes.

If in the future however Council wished to use part of the site (around the Johns house and some
access to the river) as a campground, or for day recreation purposes a split valuation would be
required between the Environment Levy area and the campground site area to ensure value for
money consistent with the Environment Levy Policy. (Refer the Environment Levy Policy, Part 1 -
Acquisition of Environmentally Significant Land states:

c)    The Levy revenue may not be used to acquire land for parks where the primary purpose is
      recreation.)

The Officers’ assessment was that if Council wished to keep open the option of a camping ground
or day recreation area in the future, the proportion of the parcel suitable for environment levy
acquisition (including regrowth and part of the foreshore) is approximately 40 ha.

Following the Officers’ inspection, the Environment Levy Working Group met on 21 February 2017
and endorsed in principle the acquisition of Lot 115 SP173075 (Johns Landing) for environmental
purposes.

The Working Group further recommended that the land purchase be funded 70% from the
Environment Levy and 30% from General Reserve with the land purchased using Environment
Levy funds to be set aside as a conservation area. See map below.




                                                                                        Page 13 of 42

Section 14

SPECIAL MEETING AGENDA                                                                24 MAY 2017




Figure 5 Johns Landing Nature Refuge zoning proposal

In order to secure the conservation area, it is recommended that a Nature Refuge be gazetted over
the entire land parcel. The Nature Refuge Deed of Agreement can then have a split zoning of 70%
conservation area and 30% mixed use zone for other purposes for example a camping ground,
picnic area or other facility.

The proposed Nature Refuge conservation area shown above covers part of the currently approved
campground development area footprint along the foreshore (NW corner).

This is consistent with the Environment Levy Working Group’s recommendation that the Nature
Refuge conservation area extend to the river foreshore in the north west corner in order to protect
significant riparian vegetation and allow rehabilitation works to adequately protect that part of the
foreshore.

Furthermore, the Environmental Levy Working Group recommend that immediately after
settlement the conservation area be defined by marker posts to clearly delineate the boundaries
of the Nature Refuge conservation area and the current development approval be amended to
confine the campground footprint to the mixed use zone.




                                                                                     Page 14 of 42

Section 15

SPECIAL MEETING AGENDA                                                                  24 MAY 2017


8.     Special conditions of sale

Following discussions between the Johns Family and the Director of Community Services, the
following special conditions are proposed for inclusion in any proposed contract of sale:
a)    The purchase price be $2.2million ex GST.
b)    The settlement date be 31 October 2017.
c)    Council requires vacant possession of the site at settlement.
d)    A licence to use to be granted to Ben Johns and immediate family for access to the two large
      sheds and surrounding area for non-residential purposes for the remainder of Ben Johns life
      or five years, whichever is the longer. This area to be defined by plan. This licence will also
      include access from this area to the river.
e)    A road access licence to be granted for members of the Johns family to Cyril Johns property
      for Ben and Pat Johns lifetime. Again this will be identified by a plan attached to the contract.
f)    Council to provide assistance to the Johns family to manage the campground and the
      transition of long term residents.
g)    There is to be no new camping to take place from 1 July, 2017. In recognition of the resulting
      loss of income Council will pay any rates due on the property from 1 July 2017 on the basis
      that the Settlement ultimately proceeds.
h)    Gagaju Bush camp will be required to remove all of their fixtures and fittings and to cease
      operations prior to the settlement date.
i)    In relation to the camping ground, all caravans, temporary dwellings, and movable structures
      are to be removed from the site prior to settlement.
j)    All car bodies, scrap metal, recyclables and waste are to be removed from the site (with the
      exception of items stored in the two large sheds and items agreed by Council which can
      remain in the licence to use area) prior to settlement. Council will provide all reasonable
      assistance to help remove these items.
k)    Upon signing of the contract the Johns family require the 10% deposit to be released.
l)    Once the contract has been signed the Johns family will agree to allow Council Officers
      and/or their agents access to the site for the purpose of meeting the above terms and
      conditions.

Previous Council Consideration

Nil.

Finance

It is proposed to finance the purchase of this land (including stamp duty of approximately $120,000)
as follows:
 $1,540,000 from the Environment Levy; and
 $780,000 from Council unrestricted cash reserves.

Environment Levy

There are currently sufficient funds in the Environment Levy to allocate $1,540,000 to the purchase
of Johns Landing with the balance of the Environment Levy forecasted at $1.6 million after
accounting for this purchase should it proceed.




                                                                                       Page 15 of 42

Section 16

SPECIAL MEETING AGENDA                                                                  24 MAY 2017


Cash Reserve

Sufficient unrestricted cash reserves exist to accommodate this purchase. Council’s interest
revenue budget for 2017/18 will need to be monitored in light of the reduction in cash available for
investment.

Potential Transition and Management costs

There are a number of costs over and above the purchase price which Council will need to consider
prior to purchasing the land. These costs are indicative only:
Costs to be met through the Community Development Team’s Social Strategy initiatives budget in
2016/17 and 2017/18:
     $70,000 to engage a suitably qualified Project Manager for 6 months from April 2017 to assist
       with the transition;
     $30,000 to clean up the site including demolition of the existing house; and
    $10,000 for security to visit the site after purchase to ensure that people do not return to live
      on the site.

Costs to be funded through the Environment Levy (as per the Environment Levy Policy):
   $5,000 to develop a Management Plan and Nature Refuge gazettal;
   $30,000 for revegetation works on the foreshore and regrowth areas including 3 years of
     maintenance;
   $5,000 Fire trail establishment;
   $7,000 for fencing and gates; and
    $2,000 for new signage at the entrance to the property.

In addition to the above costs, there would be significant costs to upgrade the amenities and roads
if Council wished to reopen the camping ground or create a day recreation area at some time in
the future.

Refurbishing and upgrading the camping ground is not recommended at this stage but is simply
identified as a future option for consideration. Any consideration of redeveloping the Johns
Landing Camping Ground would need the development of a robust business case and in any event,
the Council is currently focused on the Noosa North Shore Campground site redevelopment which
is scheduled over the coming years.

The decision to purchase the property under Option 4 should be firstly for environmental protection
purposes with the social issues as a secondary consideration. The option of a future day use area
or camping ground is not the reason for purchase but is simply identified as a future possibility for
the sake of completeness.

Risks

There are a number of risks to Council in purchasing the property most of which relate to social
issues and the people currently living on the site. Broadly these risks are summarised as follows:
 Council being perceived as uncaring and forcing people with no-where else to go to leave the
    site;
 Interim park management during the transition period;
 Poor transition results in increased homelessness in the Shire;
 Long term residents refuse to leave the site; and
 The social issues simply transfer to another location within the Shire.

                                                                                       Page 16 of 42

Section 17

SPECIAL MEETING AGENDA                                                               24 MAY 2017


There are also a number of risks to Council if it does not proceed with purchasing the land. These
are summarised as follows:
 Continued environmental impact on the Noosa River foreshore;
 The land not coming onto the market again in the near future thereby limiting Council’s ability
    to secure a key Noosa riverfront parcel of environmentally significant land;
 Ongoing risk of harm to people particularly young people and children currently living on site;
 Ongoing reputational risks to Noosa brand given the poor state of the camping ground
    particularly on social media from visitors to Gagaju; and
 An unplanned sale -
    o Forces a sudden transition for residents;
    o Increased homelessness in the Shire; and
    o A sale to another party results in a significant development proposal.

It is proposed to mitigate the risks to Council resulting from the purchase of the Johns Landing in
the following way:
 A long settlement period which allows:
   o current residents time to move before settlement; and
   o   adequate notice for Gagaju to transition their business operations
 Council bringing together of a number of Federal and State Government agencies and local
   community organisations in a community roundtable to assist the people of Johns Landing find
   new accommodation and manage the transition;
 The employment of a suitably qualified Project Officer to:
   o assist Council to develop a project and risk management plan (refer attachment 2 for a draft
      project plan); and
   o work with the Johns Family to help manage the transition;
 The development of a media and communication strategy to explain why Council is purchasing
   the land.

Consultation

External Consultation
Anglican Church of Noosa Shire
Centrelink
Coast 2 Bay Housing Group
Department of Communities
Department of Housing and Public Works
Red Cross
St Vincent de Paul
Salvation Army
United Synergies

Internal Consultation
Leadership Team
Environment Levy Working Group
Community Development Manager
Financial Services Manager
Planning and Environment Manager
Property and Facilities Manager
Environment Officer
Community Development Officer


                                                                                    Page 17 of 42

Section 18

SPECIAL MEETING AGENDA                                                                            24 MAY 2017



Departments/Sections Consulted:

 X   Chief Executive Officer                X   Community Services                 X   Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
     Executive Support                      X   Community Development                  ICT
                                                Libraries & Galleries                  Procurement & Fleet
                                                Local Laws                         X   Property & Facilities
                                                Waste & Environmental Health           Revenue Services

 X   Executive Office                       X   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Disaster Management
     Governance                                 Infrastructure Planning & Design
     Human Resources                        X   Planning & Environment
     Sustainability                             Strategic Land Use Planning




                                                                                                 Page 18 of 42

Section 19

SPECIAL MEETING AGENDA   24 MAY 2017



                         ATTACHMENT 1




                         Page 19 of 42

SPECIAL MEETING AGENDA                                                        24 MAY 2017

                                                                              ATTACHMENT 1
  Lancelyn Pty. Ltd. ABN 41 010 865 273 T/A
                                                                        P.O. Box 232
  BUGLER FRANCIS VALUERS                                   Sete sre     NOOSA HEADS Q 4567
                                                            prerbbr     Phone: (07) 5447 4911
                                                 ee SE stitute          Email: [email protected]

                                         VALUATION OF

                                        “JOHNS LANDING”
                                      118 COOROIBAH ROAD
                                     COOROIBAH QLD 4565

                                              FOR

                                     NOOSA SHIRE COUNCIL
                                           PO BOX 141
                                       TEWANTIN QLD 4565

                                             (70    aia     a
                                         i”      Leh m, ag  Ta
                                  |             :   pe NA

                                       (Noosa River frontage)

                                          VALUATION

                                           $2,200,000

                                       INSPECTION DATE

                                       22 NOVEMBER 2016

                                        REPORT DATE

                                       12 DECEMBER 2016

                                                                             Page 19 of 42

Section 20

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 20 of 42

SPECIAL MEETING AGENDA                                                              24 MAY 2017

     INSTRUCTIONS           To ascertain the “market value” of the subject property as at the date of
                            inspection, subject to the definitions and conditions set out in the valuation
                            addendum attached.

     REGISTERED
     OWNER/S                BENNETT AND PATRICIA WINN JOHNS

     REAL PROPERTY
     DESCRIPTION            Lot 115 on SP No. 173075
                            County of MARCH, Parish of NOOSA .

     LAND AREA              49.39 HECTARES

     ZONING                 RURAL

     SERVICES/ROADS         ELECTRICITY, TELEPHONE AND GRAVEL ROAD

     ACCESS                 AVERAGE

     LOCATION               Cooroibah is located approximately 6 kilometres north west of Tewantin
                            Township and 145 kilometres north of Brisbane in the Noosa hinterland on the
                            Northern end of the Sunshine Coast

                                                                                    Page 20 of 42

Section 21

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 21 of 42

SPECIAL MEETING AGENDA                                                                        24 MAY 2017

     SITE DESCRIPTION         An irregular shaped parcel of land which comprises mostly heavily timbered
                             forest regrowth, partly cleared elevated area and low lying flood prone river flats
                             with a large lagoon in the north west corner.

                             The land slopes gradually down from the Johns Road frontage to a level, cleared
                             area where the Camping ground entrance and kiosk is located and then falls
                             gradually to the Noosa River frontage of approximately 440 metres.

     DEVELOPMENT
     APPROVALS               Council records indicate an original Development Approval dated 3 February
                             2005 for Johns Landing Camping Grounds with a change to an Existing
                             Approval on 21 October 2011.

                             A condition of the approval was for the maximum number of campers/visitors
                              permitted at the camp ground per week not to exceed 1470 inclusive of 48
                              people permitted at the permanent tent area and in addition to the dwelling
                              house occupants a further permanent residency not to exceed 6 people.

                             The approval conditions included removal of all makeshift dwellings, caravans,
                              buses and the like with the exception of a total of 3 structures permitted
                              to house the permanent residences.

     IMPROVEMENTS             An old high set timber dwelling considered to have no added value.

                             A kiosk/office with attached garage, storeroom and patios. 92m2.

                             2 Amenities Buildings of masonry block and metal roof construction 153m2.
                             with shower, toilet and laundry facilities.

                             6 Toilet Buildings of masonry block and metal roof construction 108m2.

                             2 high bay metal clad machinery sheds 376m2.

                                                                                             Page 21 of 42

Section 22

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 22 of 42

SPECIAL MEETING AGENDA                                                                   24 MAY 2017

   ENVIRONMENTAL
   ISSUES                    Contamination

                             The subject existing and past land use indicates that contamination is
                             UNLIKELY.

                             We are not contaminated land experts and cannot confirm if the site is
                             contaminated or otherwise.

                             Flooding Hazard
                             The land IS PARTLY located in a flood hazard area.

                             Landslide Hazard

                             The land IS NOT located in a landslide hazard area.

                             Bushfire Hazard

                             The land IS located in a medium bushfire hazard area.

                             Biodiversity
                             The land IS PARTLY located in an environmental protection area.
                             The land IS NOT located in an environmental enhancement area.

                             Acid Sulphate
                             The land IS located in an acid sulphate area.
                             The potential hazard is PARTLY HIGH AND LOW

                             Riparian Buffer Area
                             The land is partly located in a Riparian Buffer area

                                                                                        Page 22 of 42

Section 23

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 23 of 42

SPECIAL MEETING AGENDA                                                                    24 MAY 2017

                      fae             i            Sa  ee ae
                          5 ect            RA            ed                ‘
                           es ;         Ne “             %    2                oe
                            i            Pe         %,               ee
                            .—              'K \                         a
                                2           a J  “s      ‘ sad              a

                                   ,               ms

                                                        |      lq
                                                         ie |            |
                           'S   f                            ; i              .
                           oi                       -           &
                                                  A            pa           or
                                                 =             rs              J
                                                     ia   a)     .  '
                                              Kiosk/office

                          °                                           ee       oe a

                                  TT | aN)
                                                   ee                     ee            m

              :  eae"   Ka     sats. -    e x, i   a        he =         :    ‘
                a         ae
            aes           =                    :                                      %»

                                            Amenities block

                                                                                         Page 23 of 42

Section 24

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 24 of 42

SPECIAL MEETING AGENDA                                                                                 24 MAY 2017

                             “      ame    RB       .               ;              —_
                  a     “   4     Me. :    4  |  am ng? ‘          ¥           ss   -
                 rf          ;     ss en  ae                         |             ;
                  ROME                     aie                                   et
                  2t  , -           te   fi   -          |   a                                 ;
                     ee                ars         a
                   2          —    _——.. — aa

                    Ee

                   |                                                                be
                  .

                 MG     ——           oe ee     ,                                          _
                        en  gy   ,          |     |                      |      ’
                  P    ae     ia a   ~24 aS       +40   eae   —        =        “                    |
                 ew ere        sy     bd a          ee ee            .           *       <
                                                    Amenities block

                      ane      tke    a  ae ae        i       re Te: eb         - aa           .
                   Case                as      ae            ee SA oo               aT ko         mu   ;
                 Cs    et     Oe   ee               —  4 sy ¥   a    ,               ee         )
                        ee  |      wy       he         it hk ee Ba   ;              Us         os
                        a      pak tenes  ay nh re     a    Lad       :          ie              3
                   ;  :   Ni   Ly Na       Sri  2h             ese                7  anes          4
                       oa      et              ‘3    Ll  MM by                       |        Be
                                ak          = ‘ 7   A   vy Nm                                  :
                        a                                            =
                    een |         —                  7   E        on |
                     Tel                                     ) ; ,    «a
                       i
                  m   isi l                                 a

                  .                                          4:
                 a                                           ah     (py —
                 *.                                           wy     le   *
                         i                                     Pig
                      ee                                         a        .
                  ie ine i                                         .    )  | )

                                                      Toilet block

                                                                                                      Page 24 of 42

Section 25

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 25 of 42

SPECIAL MEETING AGENDA                                                               24 MAY 2017

                              ET                _
                                                1mm ~~,                           3
                            oS          ‘     |       —

                                                              men         .
                                                               »~

                                        Machinery shed

                     oe                      ,  ens
                    ey ee               —)          a
                    eae    AS  ey           he ue oh ia               As
                    hii | hie, Sale ages, ae om p, a a 6.         4   Bibs
                    Hy | SR aia     a aos is eS                       ae
                    ans jis   S tee a   pied ae     mas  me    5S ace
                    yl      A                 ae              ee
                    ee  ae a ae ae”                a
                        1 axe, Bee 7                   <<     ae
                       snag Baie a 5 ©         ean
                         sit     F
                       Mel ‘     Te a               "         4
                                           \
                                      Ane
                                          7
                                   Re an a      3
                           ieee
                         vost  i     Ses  oni Sree Ss  ae SR .   at    :
                        , me   J    Sk  |       =           3           ey
                           his       Re he i                bo    ae
                                      Original dwelling

                                                                                    Page 25 of 42

Section 26

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 26 of 42

SPECIAL MEETING AGENDA                                                               24 MAY 2017

  SALES EVIDENCE         Sale 1                    30 NOVEMBER 2015

                          1280 McKinnon Drive, Ringtail Creek. Lot 25 SP 100.84 Ha

                          An irregular shaped parcel of land with160 metre frontage to the Noosa River
                          and frontage to Lake Cootharaba and Cooloolothin Creek. The land consists of
                          Partly cleared and improved pasture and low lying wetlands.

                          Sold for $2,700,000

                          A vacant parcel of land purchased by the Noosa Shire Council for
                          Environmental purposes. Land content assessed at $26,775/Ha.

                         Sale 2                    1 MAY 2015

                         193 Espin Road Bli Bli. Lot 6 CG 4236 21.28 Ha

                         A lowset timber/block and metal roof dwelling and sheds.

                         Sold for $1,050,000

                         A smaller allotment partly cleared and improved pasture with low lying heavily
                         Vegetated river frontage. Land content assessed at $45,000/Hectare. Non
                         Council Sale.

                         Sale 3                    29 SEPTEMBER 2015

                         162 Yandina Coolum Road, Coolum Beach. Lot7-10 RP 27021,Lots 1-2
                         RP 27204,Lot 2 RP 42419 and Lot 30 RP 862527       106.44 Hectares

                         Six adjoining generally level flood prone vacant allotments

                         Sold for $2,511,813.

                         Former caneland without river frontage.Land content assessed at
                         $23,598 /Hectare. Non Council sale.

                                                                                    Page 26 of 42

Section 27

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 27 of 42

SPECIAL MEETING AGENDA                                                       24 MAY 2017

                      Sale 4                  27 JUNE 2005

                       Lot 2 Johns Road, Cooroibah. Lot 2 RP 800334 31.79 Hectares

                      An irregular shaped allotment with 374 metre Noosa River frontage with
                       low lying ti-tree forest and elevated wallum forest.

                      Sold for $1,300,000

                      Smaller allotment adjoining National Park purchased by Council for
                       Environmental purposes Older sale in strong market. Similar. Land
                      Content assessed at $40,893/Hectare

                      Sale 5                 19 FEBRUARY 2007

                       10 and 16 Lake Cooroibah Road, Cooroibah. Lot 121 RP 100974, Lot 2
                       RP 111976, Lot 2 RP 165434, Lot 4 RP 136234    163.01 Hectares

                      An amalgamation of heavily timbered allotments with lake and creek
                      frontages

                      Sold for $4,500,000

                       Rural zoned land closer to Tewantin with water available. Purchased by
                      Council for Environmental purposes.Older Sale. Land content assessed
                      at $27 ,605/Hectare

                      Sale 6                   17 MARCH 2012

                       14 Lake Cooroibah Road, Cooroibah. Lot 2 RP 136234 32.78 Hectares

                      An irregular shaped allotment which was mostly cleared and prepared
                      former airstrip with heavily vegetated low lying creek frontage

                      Sold for $1,400,000

                       Rural zoned land purchased by Noosa Council for Environmental
                       purposes and linked Sale 5. Land content assessed at $42,708/Hectare

                                                                            Page 27 of 42

Section 28

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 28 of 42

SPECIAL MEETING AGENDA                                                     24 MAY 2017

                      Sale 7                  22 SEPTEMBER 2016

                      62 Crosby Road, Buderim. Lot 4 RP 813411 27.54 Hectares

                      An irregular shaped allotment with a moderately to steeply sloping
                      contour and heavily timbered forest regrowth.

                      Sold for $1,225,000

                      A vacant allotment zoned Limited Development (Landscape Residential)
                      purchased by the Sunshine Coast Council for Conservation Purposes.
                      Land Content assessed $44,432/Hectare. Inferior land in a superior
                      location.

                                                                          Page 28 of 42

Section 29

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 29 of 42

SPECIAL MEETING AGENDA                                                            24 MAY 2017

 COMMENTS               The subject property comprises a large Rural Zoned allotment with Noosa River
                        frontage and is known as “Johns Landing” with an existing Camping Ground.
                         It is a difficult assessment as many of the structures appear to be non compliant
                        with approvals. Gagaju Bush Camp lease part of the property with a reported
                        weekly rental of $500. Other Income details for the camping ground were
                        unavailable.

                         In our opinion with regard to unavailable income figures and The Approved use
                        of the Camping ground and restrictions, we have adopted the Replacement Cost
                        Method of valuation with the value of the Land Content and added value of the
                        Depreciated Improvements.

                        In our opinion having regard to current market conditions, recent and historical
                        similar sales evidence and the subject property topography and use we consider
                        a range of $2,000,000 to $2,400,000 indicative.

 VALUATION              WE VALUE 118 JOHNS ROAD, COOROIBAH QLD 4565 SUBJECT TO
                        CONDITIONS CONTAINED HEREIN AS FOLLOWS

                                                 $2,200,000

                          ( TWO MILLION TWO HUNDRED THOUSAND DOLLARS)

                              er       a       EE
                         Cex           Ct
                                  ———— =,

                        Warren Walker AAPI
                        Certified Practising Valuer/Registration No.1828.

                                                                                  Page 29 of 42

Section 30

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 30 of 42

SPECIAL MEETING AGENDA                                                                24 MAY 2017

                                       VALUATION ADDENDUM

 Market Value

 “Market Value” is defined as “The estimated amount for which an asset should exchange on the date of
 valuation between a willing buyer and a willing seller in an arm’s length transaction after proper marketing
 wherein the parties had each acted knowledgeably, prudently and without compulsion”.

 Easements/Encumbrances

 The title deed has not been searched to verify if any encumbrance or easement exists. This valuation is
 assessed on the title being free from any encumbrance or easement other than a registered mortgage.

  Improvements
 We have not carried out a structural survey of the buildings and were unable to inspect parts that were
 unexposed or inaccessible and therefore cannot say that such parts are free from defects.
 Our valuation is subject to satisfactory building and pest reports and Council approval of amenities blocks
 and associated buildings.
 Our valuation excludes all temporary or unapproved structures.

 Basis of Valuation

 We have assessed our valuation on the basis of Freehold Title with vacant possession. Our valuation is
 determined on the basis that the property, the title thereto and its use is not affected by any other matter
 than that mentioned in this report. Specifically, we have assumed that the property is not affected by
 financial liens of any nature.
 Building Replacement costs have been adopted from Rawlinsons Australian Construction Handbook
 We have neither undertaken, requested, nor sighted the following:

 «   Detailed Title Search or a photocopy of the Certificate of Title;
 «   Written Town Planning Certificate;
 =   Inspection of the Improvements by the Local Authority Building or Health Departments;
 =   Structural Survey of the Improvements by an Engineer;
 «   Identification Survey by a Licensed Surveyor;
 =   Queensland Transport Roads Search;
 »   Written Flood Search;

                                                                                      Page 30 of 42

Section 31

SPECIAL MEETING AGENDA   24 MAY 2017




                         Page 31 of 42

SPECIAL MEETING AGENDA                                                                24 MAY 2017

 «=  Soil Survey;
 «   We are not Contaminated Land Experts;
 «   A search of the Contaminated Land Register has not been made;
 =»  We have assumed the land is free from contamination for valuation purposes.
 NOTE: Any comments on these issues are based on observations on site and, where necessary,
 appropriate verbal inquiry without the benefit of searches, surveys etc. The valuer reserves the right to
 review the valuation and the report if searches and inquiries reveal contrary conditions or matters not
 addressed herein.

 Disclaimers

 Third Party This valuation is for the use only of the party to whom it is addressed and for no other
 purpose. No responsibility is accepted to any third party who may use or rely on the whole or any part of
 the content of this valuation.

 Market Movement This valuation is current as at the date of valuation only. The value
 assessed herein may change significantly and unexpectedly over a relatively short period
 (including as a result of general market movements or factors specific to the particular property).
 We do not accept liability for losses arising from such subsequent changes in value. Without
 limiting the generality of the above comment, we do not assume any responsibility or accept any
 liability where this valuation is relied upon after the expiration of three months from the date of
 the valuation, or such earlier date if you become aware of any factors that have any effect of the
 valuation.

 Private Lending No responsibility is accepted to any party associated with solicitor arranged mortgages.

                                                                                     Page 31 of 42

Section 32

ATTACHMENT 2




               Page 32 of 42

DRAFT Project Plan:                 Johns Landing                                                                                                                                ATTACHMENT 2          As at 2 May 2017

  Phase 1: Negotiations with John’s family following Ben John’s announcement of retirement
|1.0 __| Establish authorising environment: Presentation to Council. _—= =| NSC-Fox               | 2 February 2017
F111 [Commence negotiations wihBen Johns                         SSSCSC*dNSCAHIKF              «DOIG
 a         Move to contract negotiations for purchase of land, incl. internal liaison er Fox         Jan ven                                                                                                  ee
          with Legal, Planning, Finance, Councillors etc
           Preparation of options paper and recommendations regarding potential
           land purchase as required, incl
           -risk assessment
           -alternative option assessment
           -financial impacts
           -social impacts
/1.3    | Liaise fLiaisewithmedia media                                                              2016/18 quarter 2017
 a
  Phase 2: Planning       & Preparation
           Establish Community Services Roundtable to assist in accessing and ee Fox                 gw
           coordinating wraparound services to permanent residents to assist their
           exit
           Establish Working Groups                                                                                                                                       Coordinate out of session as required to support
                                                                                                                                                                         clients as per normal business practices and
                                                                                                                                                                         existing relationships
                                                                                                                                                                         Working Groups to provide project activities they
                                                                                                                                                                          agree upon to Steve to include in this overall
                                                                                                                                                                          plan
 aS        Establish contact list (mob and email) for Roundtable members and                         By end of week
           circulate to members. Establish email group.                                              commencing 3 April
          Develop Communications Stategy Communications Strategy                                     End of week commencing
                                                                                                     10 April

 23:2 | DelivertoRoundiablemembers to Roundtable members
 i il                                                                      Mc                        By end of week                                                       Comms Strategy element
 [=< $$                                                                                              commencing 3rd April                                                 Comms Strategy element
                                                                                                     Roundtable members to
                                                                                                     deliver to their clients as
                                                                                                     opportunities arise
2942 | ctabishment with key o
  23.42 | Aten Northern Network Meeting and commence relationship            NSCS                    12 ae, 2017
                                perational staff in services and charities,
|2.4    | Finalise contractnegotiations                                     NSC Fox               | Eaaster/end of April
 [2:5    | Reportto Counc SSNS ~d                                                                     May
           Messaging to Noosa News                                           NSC-Fox to contact      May or as opportunity                                                Comms Strategy element
                                                                             journalist who wrote    anses
                                                                             Wendy article
           Meeting with Wendy                                                NSC-SK to arrange to                                                                         Comms Strategy element
                                                                             be around when Wendy
                                                                             delivers meals, provide
                                                                             services flier and
                                                                             engage as discussed

                                                                                                                                                                                                         Page 32 of 42

Section 33

Page 33 of 42

Prepare services list flier to campers with tonal approach centred on  NSC — KF&SK to           April                                                                    Comms Strategy element
           client needs                                                          coordinate list with input                                                                         Plus SK to make contact with Chaplain Linda
                                                                                 from Roundtable                                                                                    (links families to support and has brokerage)
                                                                                  members                                                                                           Flier to be delivered by Ben Johns to residents
                                                                                                                                                                                    (SK liaison). Include Anglicare on Thursdays and
                                                                                                                                                                                    Facebook, Chaplain at Tewantin School and
                                                                                                                                                                                    Flexischool plus post in key locations (e.g. phone
                                                                                                                                                                                    recharging station).
 _         Engagement with Ben to map/list permanent campers and commence         NSC-SK                                                                                            Crosscheck with Housing applicants list,
           process of relationship establishment with Ben and residents-onsite                                                                                                      Centrelink and Anglicare, subject to their
           inspection                                                                                                                                                               confidentiali requirements
           Based on above commence developing NSC case management profiles                                 Start week commencing
           to track transition progress                                                                    10th April
           Data gathering for 2.10.1                                              NSC-SK                   Start week commencing
           -dog and cat registrations from Local Laws                                                      10th April
           -residents known to Environmental Health Officers
           -Anglicare Christmas list
           -Housing ‘Authority to Request Personal Information’ form to allow
           Housing to inform SK of clients making housing applications
           -Residents known to QPS/Child Safety/Disability Services
           Attend Anglicare dinners                                               NSC-SK                   Week commencing 10"                                                      Comms Strategy element
           -Thursdays 4pm                                                                                  April
 eee fearon                                                                                             [ora
           Financial information to Ben Johns regarding transition to retirement Anglicare — RevID to link | By end of April
           villages                                                              with Centrelink and talk
                                                                                 to Ben about access to
                                                                                 this assistance
 -         Establish Monitoring and Reporting schedule                           SK
           -end of week updates check-in on progress                             -Fox/AH/KF
           -reports to Council as required                                       -Fox
  Phase 3: Pre-contract signoff
 eel
                                                                                  NSC-Waste
                                                                                  Management
                                                                                  NSC-Waste                April, May, June and as
                                                                                  Management/SK to         residents leave
                                                                                  liaise with Ben Johns
33__| Attend Housing sie viek end fofow-up briewng._____|Ns@eK                                      ss 1D Apey
           Arrange to meet with key operatives to gather further data and identify
           expectations of support from the Project Officer
           -Fleur & Amanda Housing
           -Tewantin State School Chaplain
           -Flexischool
           -Rev lan Dredge Anglicare
           -Lee Banfield C2B
|3.5     | Identify current fee structure forresidents.                     CE NSC-SKO                    May
           Liaise with the Homeless Person's Information Service? to inform them  NSCS SK      a
                                                                                                           My
          what's hap pening  Priority attention? Or can arrange Housing
                                                                     do this?

           Council meeting to decide to sign contract or not.                                                                                                                       Fox point of liaison

                                                                                                                                                                                                                      Page 33 of 42

Section 34

Page 34 of 42

Phase 4: Post Contract signoff OR implement planning conditions to restrict uses of the site (additional actions required as well as those in black font)
          Understand scope of decision: arrange briefing/meeting for/from
          Planning, Legal and Local Laws sections regarding meaning and
          application of DA conditions and appropriate strategies to implement
          Connected to 4.2.1
          Inform key partners                                              NSC-Fox/Heather         End May/early June                                                 Communication Strategy element
          -Public - media release and update Council’s Facebook                                                                                                       NB Fox is point of contact for media enquiries
                                                                                                                                                                      not staff
                                                                           NSC-Fox                 End May                                                            Communication Strategy element
          -Key journalists - revised key messages                                                  End EndMay
                                                                          NSCFouKF             | Fox/KF
          -Roundtable members — brief - out of session if required
          -Inform Northern Network
          Assist residents to understand services available: deliver services list to Roundtable members, End May/early June                                          Communication Strategy element
          residents                                                        Northern Network
                                                                           members, NSC-SK, Ben
                                                                           Johns
          Formal notification to clients directly affected.                                                                                                           Communication Strategy element
          -Formal letter from Council advising Ben Johns that NSC will be
          operationalising the DA conditions
          Personally brief Ben John’s first
          -Letter from Ben Johns to residents, including Gagaju Bush Camp

           Letter from Council to residents?                              TNSC-FoxAH Fox/AH        End | End May/early June June                                      Communication Strategy element
          -Develop key messages document for backpackers and backpacker
          business community and distribute
          Site cleaning                                                    NSC-Fox
          -ascertain Council position on buildings/structures to remain or to be
          demolished
          -arrange removal
          -reassess site cleaning requirements and continue removing waste NSC-Waste/SK
          particularly old gas bottles, car bodies and chemical/poison hazards.
[4.5.4 | -inform residents of opportunity for rubbish removal
 st     [Reece mre somone                                POTTY          [ett                    [ety
                                                                                                   June
 OS     | reopen    on   © Set win seasonalvonen ae sssonet Tomes [Rowers                       [Meese
 oT
  Phase 5: Post Settlement 1/11/17
| 5.1.1 | Design and affix new permanent signage stating arrangements.   | NSC-LocalLaws        | November
| 5.1.2 | Provide Facebook commentary —NSC-Heather | November
[5.1.3 |Mediarelease                                                   CT NSCFox/Heather        | November
                                                                                                                                                                      Restoration Plan element
|5.3    | Remove/rehabilitate non required paths andtracks               | NSC-Parks            | November, December __|
[5.4    | Establish firetrailsifrequired                               CE NSCParks              | Novermb eer
| 5.5.1 | Conduct SecurityAssessment                                   CT NSC-LocalLaws          | November
                                                                                                   December                                                           Restoration Plan element

                                                                                                   November

                                                                                                                                                                                                       Page 34 of 42

Section 35

SPECIAL MEETING AGENDA                                                              24 MAY 2017



2                        ELECTRIC BUS PROJECT
DOCUMENT INFORM AT ION




Author:                          Project Manager, Adam Britton
                                 Planning & Infrastructure Department

Index:                           ECM\ Project\ TP000300
                                 ECM\ Subject\ Commercial Bus Routes
                                 ECM\ Subject\ Transport Levy

Attachments:                     1.   Legal advice



REASON FOR CLOSED SESSION
This report was considered in closed session in accordance with Section 275 (1) of the Local Government
Regulation 2012, which permits the meeting to be closed to the public for business relating to the
following:
(e) contracts proposed to be made by it
(h) other business for which a public discussion would be likely to prejudice the interests of the
      local government or someone else, or enable a person to gain a financial advantage




                                                                                   Page 35 of 42

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.