Council archive · source document
08/0831 - Response to Information Request [As Published] · 142008.831
Transmittal Document - 31/07/2008
SCRC CORRESPONDENCE
Page 1 of 2
unshine Coas
&° New Item Edit Item Delete Item ( Alert Me
Reference Number TFR-AS0801M
Date: 31/07/2008
To: Tewantin
Section: Land Use/Planning
From: Maroochydore
Section Developement Assessment
Officers Full Name: Annette Stringer
Actions (If Relevant):
Payment Method: Not Applicable
Total Amount $:
Details of Document Fwd: Further information
2008/831
247 David Low Way Peregian Beach
Signature of Council
Officer:
Created at 1/08/2008 9 02 AM by MSC\AAB Close
Last modified at 1/08/2008 9 02 AM by MSC\AAB
http://scrcintranet/custservILists/Transmittal%20DocumentIDispForm.aspx?ID=439&S... 1/08/2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 19 (of 43)
Page 2
Development Assessment
31 JUL 2008
Information Services
Building Surveying Professionals (Qld) P/L
Consulting Building Surveyors
Our Ref. 2008/0871
31 July 2008
Sunshine Coast Regional Council
PO BOX 141
TEWANTIN QLD 4564
Dear Tracey
Re: 247 ,249, 253 DAVID LOW WAY PEREGIAN BEACH
OPERATIONAL WORKS APPLICATION RESPONSE TO
INFORMATION REQUEST
Dear Tracey
In response to your information request dated 22 July 2008
Find enclosed-
3 copies of plans that address your concerns and correspondence from KHA
and Barlow Gregg
It would be appreciated if you could review and approve the documentation
provided and do not hesitate to call if you require any further information.
Yours sincerel
STEWART MAGILL
1'
Building Surveying Professionals (QLD) PAL
Page 3
John Robertson
From: Stewart Magill [stewart magill@bspgld corn au]
Sent: Tuesday, 22 July 2008 1 27 PM
To: John Robertson
Subject: FW Operational Works application for 247, 249 & 253 David Low Way, Peregian Beach
Dear John
Progress from Council
Regards
Stewart Magill
BUILDING SURVEYING PROFESSIONALS QLD P/L
Mobile: 0434 491 447 Phone. 07 5451-5079 Fax: 07 5443--5273
PO Box 1632, BUDERIM Q 4556
3/12 Aerodrome Road, MAROOCHYDORE Q 4558
u Please consider the environment before printing this e-mail
-----Original Message -----
From* Tracy Jones [mailto:[email protected]]
Sent. Tuesday, 22 July 2008 1:23 PM
To. [email protected]
Subject: Operational Works application for 247, 249 & 253 David Low Way, Peregian
Beach
Stewart
Further to my letter of 21 July 2008, the following items require attention by the
applicant in order to progress the assessment of this application
1 Please note that three (3) sets of the drawings that are
required to be approved for the above Operational Works application are to be duly
amended (as required below) and each signed by the consultant Registered Professional
Engineer of Queensland (RPEQ).
2. Please provide a plan showing appropriate sight lines as
requested in Condition 20 of Council's Decision Notice 2006/2689 dated 1 November 2007
that are in accordance with AS2890 1, sec 3.2.4. Please note that sight lines are to
be provided from the property line, not the edge of the footpath. It is recommended
that these sight lines be also shown on the Landscape plans.
3. Please provide construction details for the median kerb
shown on drawing W-03-01. (Condition 26 of Council's Decision Notice
2006/2689 dated 1 November 2007 refers).
4. Please confirm that "EX/1" is an existing gully pit, not a
manhole. Please also show the outlet pipe from that pit (Your plan
M3087-CO5 D refers)
5. Please confirm that the proposed stormwater line from "3/2"
to "EX/2" will not conflict with Council's existing sewer line
6. Please provide details of pit "3/2". What will prevent
stormwater draining to the submersible groundwater pump?
Please note that the following items will need to be received by Council before
Council can issue a Development Permit for Operational Works.
7. Please show on the appropriate drawings, the existing sewer
main and its 'zone of influence', in accordance with of Condition 40 of Council's
Decision Notice 2006/2689 dated 1 November 2007.
1
Page 4
8. Please address all the requirements of Condition 49 of the
abovementioned Decision Notice with regards to all sewers, proposed easements and
associated zones of influence.
9. Please provide a copy of the letter of authority, as
required under Condition 50 of the abovementioned Decision Notice.
You may wish to contact Kevin Slender or Mark Lewis of Council's Land Development
Section on 5449 5261 to discuss these matter Regards, Tracy.
Tracy Jones - Senior Planning Officer
Regional Strategy & Planning Department Sunshine Coast Regional Council
Ph 5449 5228 Fax: 5447 1062
Email- [email protected]
****************************************************************************
**************
The Sunshine Coast Regional Council is now open for business. There is nothing you
need to do as we have taken care of everything for you to ensure it is business as
usual. Please continue to do business with your local Council office where you will
still find the same friendly faces and the same great service. For further
information head to the Sunshine Coast Regional Council website
www.sunshinecoast.qld.gov.au This email, together with any attachments, is intended
for the named
recipient(s) only. Any form of review, disclosure, modification, distribution and or
publication of this email message is prohibited without the express permission of the
author. Please notify the sender immediately if you have received this e-mail by
mistake and delete it from your system.
Unless otherwise stated, this email represents only the views of the sender and not
the views of the Sunshine Coast Regional Council.
****************************************************************************
***************
mail5.2.13
2
Page 5
k
Our Ref: 080214S fih
ken hicks
AND ASSOCIATES
30 July 2008
Sunshine Coast Regional Council
Noosa
RE: OPERATION WORKS APPLICATION FOR 247, 249 AND 253 DAVID LOW WAY, PEREGIAN
BEACH
Dear Sir / Madam
In order to assist with the assessment of this application, the following items have been addressed.
Items 7-8
Proposed sewer and stormwater sketches (attached) have been prepared for the same (with the
zone of Influence area covered by the areas shown within the easement). The two sketches are:
1. 080214A- Proposed sewer easements.
2. 080214B - Proposed stormwater easement
Item 9
In response to Item 9 of your e-mail to Stewart Magill on 22 July 2008, I was advised by Kerry Coyle
from you office (on 23 June 2008) that the letter of consent will be added to the proposal plans
when they are lodged for sealing. (Item 9 on your email asks for a copy of the letter of authority as
required under condition 50 of the decision notice 2006/2789 dated 1 November 2007)
I understand the above response covers the outstanding Items 7-9 on your request.
Please give me a call if you have any queries or otherwise
Yours faithfully
0*1^cve rr\ Od
Manoj Sharma
Surveyor
TOWN PLANNERS I CONSULTING SURVEYORS I URBAN DESIGNERS I PROJECT MANAGERS
Ken Hicks & Associates Pty Ltd I Info®kenhlcks corn au I A.C.N. 010 278 823 I A.B.N. 74 308 405 611
Suite 7 Dalton Centre, I Newspaper Place 18!42 King Street 61-73 Sturt Street
PO Box 6380, MAROOCHYDORE BC QId 4558 PO Box 1712, CABOOLTURE, Qld 4510 PO Box 5027, TOWNSVILLE, Old 4810
P 07 5443 2844 F 07 5443 7146 P 07 5495 5318 F 07 5495 5317 P 07 47213066 F 07 47213088
n
Page 6
BARLOWGREGG
Aj4r>PA-"
Consulting Engineers
Reply to Sunshine Coast Office 30 July 2008
Enquires Mr J McDonald
Our Ref: BM003087/JM5588K
Your Ref
Sunshine Coast Regional Council
PO Box 141
TEWANTIN QLD 4565
ATTENTION: TRACY ARTHUR
Dear Tracy
RE: APPLICATION NUMBER 2008/831 FOR PROJECT AT 247. 249 AND 253
DAVID LOW WAY PEREGIAN BEACH
We write to you in response to the request for information dated 22 July 2008.
Item 1 Please find enclosed 3 sets of our amened civil and structural engineering
drawings signed by an RPEQ.
Item 3 Please refer to Barlow Gregg VDM structural drawings BM003087/B-01-P
and BM003087/B-04-C for construction details of the median kerb on the
basement ramp
Item 4 We confirm that pit "EX/1" is an existing gully pit Drawing number
M3087/C05-E has been amended to reflect this Drawing number
M3087/C06-C shows existing stormwater lines at the outlet of the system.
Item 5 Drawing number M3087/C06-C shows the location of the existing sewer
line in relation to the proposed stormwater works.
Item 6 Stormwater pit "3/2" is located some 13 metres from the nearest opening to
the basement. In the event that this pit overflows excess water will fall
toward the street frontage rather than in the direction of the basement
opening.
We trust the above is satisfactory.
Yours faithfully
PETER BARLOW
for and on behalf of
BARLOW GREGG VDM PTY LTD
Eric
Barlow Gregg VDM Pty Ltd ABN 77 1 14 957 363 ACN 1 14 957 363
Level 1, 181 Brisbane Road, PO Box 200 Mooloolaba QLD 4557
P +61 7 5444 0400 F +61 7 5444 0536 E barlowgregg@vdmgroup corn au W www barlowgreggvdm corn au -Aff -MW
co
member
FRASER COAST SUNSHINE COAST CORAL COAST
Page 7
Protect
CONSULTING SURVEYORS
& TOWN PLANNERS PROPOSED EASEM ENT A
A.C.N. 010 278 823 IN LOT 95 ON SP 137431
Suite 7 Dalton Centre,
1 Newspaper Place, PO Box 6380
MAROOCHYDORE BC Qld 4558 Designed
ken hicks
AND ASSOCIATES
Phone (07) 5443 2844
Fax (07) 5443 7146
Surveyed
Scab FIN'S 080
Date
Ref No
250608
1:400 214S 080214S
Page 8
Project
CONSULTING SURVEYORS
& TOWN PLANNERS PROPOSED EASEMENT'S A & B
A.C.N. 010 278 823 IN LOT 5 ON SP215533
Suite 7 Dalton Centre,
1 Newspaper Place, PO Box 6380
MAROOCHYDORE BC Qld 4558
ken hicks
AND ASSOCIATES
Phone (07) 5443 2844
Fax (07) 5443 7146
Surveyed
Sade
Designed
F/N's
Dote
Ref No
210608
1:400 080214S 080214S
Page 9
w
by
GENERAL NOTES
IRmd In Contuwmn With Al Drones)
DRAWINGS
Dar INYJB°T°Ed wnga Drmenaors take xefs °e
pnETnEXITmefl- Onee setttonutt eennednall lev°Ie
a- Lrrendeona
L
ne9to TmbB iet HO w VY
n brmoibu"Id"_1d me"0.ekr
AREA CALCULATIONS
to Cn1
nl npreamba rqa
CONSTRUCTION
WI wg"N U4 C
b"ode
° fl &ra0 VNflre IQfo forwr^a5and 7a LOTS 1 and 2 on RP 903222 and
SITE AREA 2021m2
^Idiry ^rebaM^,EwNa^^
mxt p ma
LOT 26 on P315
REf.
A E%NR. E- M1a BuIdW CaN44i 0.o stn BUILDING 1
em Alba m. wrreM PARISH Weyba
EdISo aBma of Sliding A^pwl
COUNTY March GROUND FLOOR 19196m°
ACCESS & TACTILE INDICATORS Ip FIRST FLOOR 200 46m°
is
wITl
ramd DM
I ;;.e'andA 2204 TOTAL BUILDING 1 392 42m0
far d,.
CAR PARKING
..°
g"$ ewmee BUILDING 2
Commercial Office Development • Class 5 GROUND FLOOR 19539m°
ycAn nib KVmENTILAn Basement Car park • Class 7a FIRST FLOOR 20046m°
laeoaNmanto w^mM wn ASl Baez
and lnawamnw wlM rtquN Itn^naahdnrmga
FIRE SAFETY TOTAL BUILDING 2 39582m°
likiln"Conue"nw aePkeld Tseoarn9 H^eplNbnv Fired
BawdyCmwehgservics, LHyaws7 Narch2008
FLOOR LEVEtlLSs BUILDING 3
aye aytl flBr GROUND FLOOR 16151 m'
prim A th ooes in renrbe mn
pibbtl. wmnenwmnt af am work FIRST FLOOR 18685m'
N mmeab alaimedellbe minfawd wncrele b 34837m'
TOTAL BUILDING 3
se to
ttpp!a
dmaJmEF g and lntmrelwlhg.
Fo
shall have a MNmwmcMea2 With
LEWAY RAAPd NEWAY OVER
TOTAL NLA 113660m°
good
° any MmrtelpbdMarnyar Kul and drveYhg
ENGINEERING ELEC SERVICES 340 m'
P.
°°°ct gsmn"B
end Islduly daaabblIII l b&Se alarm bMry 1'
EXITSIGNS &EMERGENCY LIGHTING
Prr
III^tl'^6^a^I-P.Pgr TOTAL GFA 1140m°
b EbaMml Ergire°re dis-ge
EXPANSION (CONTROL JOINTS
RaldaoE
Location Plan BASEMENT CARPARK 10876ma
amfi a w
Qaings HF'I-Oanebn bhYs
b rtare
°wPn m n 4".&^ar wwmmaraamn°
NTS
at"
EXTERNAL WALLS
My nrya Iwmslxalh iihall be mlrnum 150mm wnwab
.'1.4 read
^fl„hdeaw"d
FIRE DETECTION SYSTEMS SITE PLAN LEGEND
npIk.d ehmo' Rear EBO aro dmwaury.
LANDSCAPING Sewer man hole
Refer to L°ndee°pe ANitleda arawnte. -------'----------------------------h--- - - New-160 dia-H. saconoetllon
C EXISTING BOWLS Invert level for sewer from Noose
LOCAL AUTHORITY constructed from existing manhole Storm Water men hole
n.woikmbbawmed tris-danoe n p bb loala my CLUB Council records
mgue0mainaairgwn$"ipreeerodmmCbaiRere$pmmtroo mmn Membrane roof over stair 1
OT 81 ON Existing sewer to be removed
CoMibre 1 Exatmg Fire Hydrant
MECHANICAL VENTILATION 100. MCH 3788 Existing block r t.mirg Well as per Council Development
n i gatIn, b thetm hang
^9CAaM
a Ara` ARb °Rao" fAll°duct;:.V:
0.8185'526 ASNM&B AIIdW tone shall
roZ, ----------- --, Leaning towards bowls club) permit conditions Clause 41
PP 0 Existing power pole to be removed
^d with BOA quirittl°:ndD-WReareshaimPnawdrasa Teo
with the RCA , TP Existing laser pit
PLASTERBOARD Existing sewer manhole to
WI Anadl Eatlasnusard eaape P rmaalthdeprc raised to finish flush with carpank, Exretrig Tehre Ine
amilweadrAdlidinepety^lanedraallnard 11M.Yemmeheli Wit -,detwY
eM stab to awl eng detlals 106
awlle shin bcEineblletlmapmplbbry
Relbfir°rrigdan0
PLUMBING DUCTS Exellg Over head powedmes
MMnum Rw45 wind atbreabpn gerera l
luanMit paduucnAenalaebu a
ePp Ldtlo
ennd-a ors
ENilae
^^i loon eh bile ^s^c^mN - - - -- - Existing Sewer Ina
.n I ca lau5any
male
ppµExrea"n°ahall be aacownw in no acaBCA
lop DTH Dotble fire hydrant to Hyd emg details
NECTION
Refer Ele
SEWER CONNECTION NOTE all senses plotted from Sreveyofa
Alplu pove°b bewnreobd bmvsra°oer nkmatwn
dw nwde°Min awerdaroe over Hytlreulo
Err9srare dravngs
SMCGREEALiAITMSSE um
1 O -111A451 e^Oi m2$`e Sd^mwaaiE°ngil.eraDrawnme
ry
TTr1^VW
PII eb at
M mwa rerehal d ws -.-d
Inawardanw WNHytraib'Ergi asre Enuer
TANK BIG
Renbroeadd omoowb b°bony abbe are b be poured wthl.twlih .,I,
°b m^ va'"
aW^1^i
bdxam maciRwibnnd
a a^bacmrdareaywe,
Il be applledbyn approved contractor
TIME R
"Bgae BCA 9bnderda Mawla NOTE Pal E dam..m m be Wen In
AS 18e4119M Eig dnsendrae
p
UNDERGROUND SERVICES MebeMa¢mregapewr d I'
ss -Y .ft., NORTH PONT strop wlen ptlmin0 fron
neideerAepnlodrbmallu
nuinnw
dB1rFraMafmnebrooSoon
eltlmn Poo i en ma imporebny of tls
VEHICULAR ACCESSTOCPRPARK nwerd to awae me sybrei scab
Piuwbwwby am b c°Rark fang Meahru m
cykasrren p nc, A°
i2am Nandekdle abiker
mnmor osno1z Smkg EmryAy
rainue wrec^0 IFINDWBT ASK
tweed 25i71Me 421 PM
P
enn eentE^
t anehart system to retailed on roof as speolfed
I Bm High masonar
enclosure for Hydrant
CARE
ARCHITECTURE
Booster assembly
ewwwrwdacwmw melpemxrchmmav
IeWse aI 071114634 ha 07 IB32 Mel
$waIM4CaR .1 OrNN15fl hr S(Iornayw
Harwplep b a7417AWd to. o741ze1961
w44mnibH m d'WNi63r hrn7414d1431
Coln MbexbNpw
u06 790047a1154 pace nsd
TI6 deign b Me pnwy d8. entAee W ley im b
CWNCIL WATER LINE NOTE OVERHEAD POWER TO BE wed weed or npmdtcad whafr In nr wiled Ire
eifoiiaupeoroaabnmm erchied INniganaro nary wry
-----_K1"'y _
1081 •RL10666AHD , r RELOCATED UNDERGROUND PROM THIS POLE
10800' TRANSFORMER TO BE MOUNTED TO THS POLE
- - - - - - - - - - - - - - - - _-------- !_ Pwuco
IF REQUIRED
W6, Wwmwl PROPOSED OFFICE DEVELOPMENT
10600
247 DAVID LOW WAY
GENT
5 10 20 30 Metres MORGAN AND BEIERS ATF
Original Scale 1200 DR0N9RCn
SITE PLAN
SITE PLAN 2810712008 AS NOTED
DRAWN CAD FILE
CD
1 200
JRG 071314 Pereglan Commercial pip
pff!Pff N. Dw Nc
071314 W-0101 H
Page 10
Ge anedmwe by
Exlsung Telsba Pit
4
Existing sewer connection to be terminated
New sewer conecbonfrom erstmg manhole -
149 42 %-
16`00
2]1R 1ao4300
OPWrSRREmS
_s EM W,7
Provide Sign ge for parking t grade
One Hou Parking Only
2600 2600 3200
Carpark exhaust intake with
all weather louvre to Mach erg details
Bather retinal ground 6350 below
US of slab above
RL 114 RL 108
DFIH POTS Famed dnembm a be Van
mRwenz ro eabd wrdy as dlnanae
Hydrant wlm¢Ihshem cue beFxr oamanendp eok or naYdiw
Boater m a.N Fm9 ebop dre- wren naming -
-was a u ee reeeomer6 of eta
Assemb apertln w smiles ow required em4 e
aaaad
SETOUT
POINT
ake exiting overhead powerlines
nderground from this point
wvavhmzewdhmmau naal@neeearahcangu
BMae. wl OTk11KM beaa3932ffi0'
k-hl`w naM ail 0251N4SI1 kew Sae4er6p
EXISTING FOOT PATH wnrcyke mll op412eidda b.oralm3Eaa
WSemrAyc ryl orovet alt kral0enaruea
BIN PICK UP ARE SCQwrdrve<iump and
x$4Revar lv4 Ohcanllm
Thb deHn 4 the progeny or ma arerbe aM W be
wet 0,964 or raprodrmd eml 0 n Pan eetoa ere
amen permbbn of se er<hiaa lamwnewnery wry
mrymsullnbwlaaar
PfoJECT
PROPOSED OFFICE DEVELOPMENT
DAVID LOW WAY 247 DAVID LOW WAY
CLEW
FLOOR PLAN LEGEND Dip 150 the. down pipe as spouted with stand off SHS SHS in wall line toshu1 mg details
brackets to arch detail New Cone Path to Landscape architects detail -^5-- Existing Over head powerlmm MORGAN AND BEERS ATF
ST Stine facing loBlackwork oval asspadnd
AWN FC awning m par derail EH ElectrmlHub Locahan odlightswiches Secunty Sewer men hole -/>^- Existing Over head powwlmm
Ti Textile ground surface ndicators as scheduled To DRAVYING
CHS Circler Holowsection framing as per membrane roof keypad Riser for Powersuppy(2x50mmDiecone comply with AS 1428 4 to be removed
msnufs dela§ holm) and Distribution Board to Elm eng details TOW TopofWal Storm Water man hole GROUND FLOOR PLAN
Col 2 Reint cone column with Integral down pipe to FIP Fire Indicator Panel RL -- - - - Existing Be- Ina
Reduce level to Australian Height Datum
alma eeg and arch details FP Fixing Pantfor membrane roof as per Manure spec WO Indicates supply of Metered water supply and Remote Existing Fire Hydrant
Col 3 Remf cone column tosbuct eng details HC Hose cook as selected DFH
CSM Crim Safe mesh screening to nominated windows as HR f Handrail as per detail
wader location
4s.o
Double fire hydrant to Hyd sing details 28/0 772008 1100 & 1200 ® AS
WS Wheel stop to AS 28901 PP Q Exetng power P.I.
per schedule HR 2 Handrail wiperdetd PWD canphmt WM Water Makers in cabinet to Hyd eng details NOTE allanvices plotted tom Srwsya's DRAM CAD FILE
DFH
DB Double fire hydrant M TtNC Mumr as specified ToTraffic erg delete eve
11350 (Diagonally) Finished Floor Surface Spot level iP Exahng lebtra pit information A 071314_Pereglan Commercial pip
Electrical Distribution board MOB Man switch bond FFL11350 Finished Floor Level ( Max where falls am applicable)
DO Drainage outlets per shuct and Hyd any details PROJECT ra Danwwc rb
PH Plumbing Hub zone for servcee to be provided Stt cthml Floor Level - - - - Exstng Talsa Ine
Dp 150' is down pipe as specified with stand off
brackets to arch detail
Cold we*plpe 65mmWmtapipe and Remote water
meter Exuarg times lobe retained
071314 W-02-0 2 0
Page 11
^BARLOWGREGG BarlowGregg VDM Pty Ltd
PO Box 200
Mooloolaba QId 4557
P +61(07)54440400
F +61(07)54440536
Consulting Engineers www barlowareagvdm corn au
Document Transmittal Sheet No: 1 of 2
Project: Proposed commercial development Job Number: Issue**'
247 David Low Way, Peregian Beach
Morgan & Beiers ATF Mulrany Property Trust #2 3 08
Day 12 12 27 27 27 28 15 15 27 11 12 15 16 29 30
Month 03 03 03 03 03 03 04 04 05 06 1 06 1 07 1 07 07 07
Year 08 08 08 08 08 08 1 04 1 08 1 08 08 08 08 08 08 08
D - Deliver C - Collect M - Mail Method of Transmittal
F- Fax E- Email U- Upload E M DE E C E E E E E E M E D
Distribution Number of Copies
John Robertson Core Architecture 1 1 2 1 1 1 1 1 1 1 3
PDD 1
Australian Sheet Piling 1
Cameron O'May Hutchison Builders 1 1
Morgan & Beiers ATF
Mulrany Property Trust #2
Drawing Description Dwg. No. Drawing Revision
STRUCTURAL
Title Page & General Notes 00-01 A A A A A B B C C C
Steel Schedules 00-02 A A A A A A B B B
EaFthwerksLeyout 89-93 A A A A A A 8 * * * NO LONGER REQUIRED * * *
Basement Slab Relief Drainage System
00-03 A A B B B C D E E E
Layout
89.94 A A 8 8 a * * * NO LONGER REQUIRED * * *
89 066 A A A A A * * * NO LONGER REQUIRED * * *
9etads
Basement Slab & Footings Layout B-01 A A B B B C C D E F F F
Basement Walls & Columns Layout B-02 A A B B B C D E E E
Basement Footing Details Sheet 1 B-03 A A A A A B B C C C
Basement Footing Details Sheet 2 B-04 A A A A A B B C C C
Precast Panel Elevations B-05 A A A
Ground Level Slab Layout G-01 A A B B B C C D D D
Ground Level Walls & Columns Layout G-02 A A B B B C D D D
Ground Level Slab Bottom
G-03 A A A
Reinforcement Layout
Ground Level Slab Top Reinforcement
G-04 A A A
Layout
Ground Level Slab Sections Sheet 1 G-05 A A A A A B B C C C
Ground Level Slab Sections Sheet 2 G-06 A A B B B C C D D D
First Level Slab Layout 01-01 A A B I B B C C D D D
First Level Slab Bottom Reinforcement
01-02 A A A
Layout
First Level Slab Top Reinforcement
01-03 A A A
Layout
First Level Slab Sections 01-04 A A A A A A B B B
Page 12
I :" ;1 kel',Ttl fl- :kc'-Ic^ BarlowGregg VDM Pty Ltd
PO Box 200
Mooloolaba QId 4557
luqr> P +61(07)54440400
F +61(07)54440536
Consulting Engineers www barloworeggvdm corn au
Document Transmittal Sheet No: 2 of 2
Project: Proposed commercial development Job Number: issue:
247 David Low Way, Peregian Beach
Morgan &Beiers ATF Mulrany Property Trust #2 M 3 0 87
Day 12 12 27 27 27 28 15 15 27 11 12 15 16 29 30
Month 03 03 03 03 03 03 04 04 05 06 06 07 07 07 07
Year 08 08 08 08 08 1 081 041 08 08 08 08 08 08 08 08
D - Deliver C - Collect M - Mail - I I Method of Transmittal
F-Fax E - Email U -Upload E M D E E C E E E E E E M E D
Distribution Number of Copies
John Robertson Core Architecture 1 1 2 1 1 1 1 1 1 1 3
PDD 1
Australian Sheet Piling 1
Cameron O'May Hutchison Builders 1 1
Morgan & Beiers ATF
Mulrany Property Trust #2
Drawing Description Dwg. No. Drawing Revision
Roof Framing Layouts R-01 A A A A A A B B B
First Level Roof Purim Layouts R-02 A A A A A A B B B
Roof Framing Details Sheet I R-03 A A A A A A B B B
Roof Framing Details Sheet 2 R-04 A A A ,A A A B B B
Wall, column & stair schedules and
D-01 A B C C C
details
Precast panel details D-02 A A B B C C
Sign Details D-03 A A A
VIL
Title Sheet C01 A A A
Sediment & Erosion Control Plan C02 A A A B B B B
Carpark Layout Plan C03 A A B C D D E
Standard Details - General C04 A A B C C C C
Stormwater Layout Plan C05 A A B C D D E
Stormwater Longitudinal Sections C06 A A A A B B C
Page 13
PROPOSED OFFICE DEVELOPMENT
DAVID LOW WAY, PEREGIAN
for MORGAN & BEIERS ATF CONTRACT REF: M3087
LIST OF DRAWINGS
M3087/C01 TITLE SHEET AND LIST OF DRAWINGS
CO2 SEDIMENT AND EROSION CONTROL PLAN, NOTES AND DETAILS
CO3 CARPARK LAYOUT PLAN
C04 STANDARD DETAILS - GENERAL
COS STORMWATER LAYOUT PLAN
C06 STORMWATER LONGITUDINAL SECTIONS AND DETAILS
STANDARD DRAWINGS
INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALIA
R-0051 COMMERCIAL DRIVEWAY
D-0010 ACCESS CHAMBER DETAILS DIA 1050 TO 1500
D-0014 ACCESS CHAMBER CAST IRON COVER AND FRAME
D-0030 EXCAVATION, BEDDING AND BACKFILLING OF PIPES
BARLOW GREGG ..,
AM 77 114 157 365 ACN IN 657 363
CONSULTING CIAL and STRUCTURAL ENGINEERS
lw PROJECT MANAGERS
FRASER COAST SUNSHINE COAST CORAL COAST
ACN 010 271 440 A C N 007 079 165 ACN 010 271 440
THE ABOVE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH 94 OH "tough Rd, Ted 1/181 Bmhoe R 29 Tokoleon Street,
(P0 Boo 239 (P0 Box 2W (PO On 1141,
ALL THE ASSOCIATED CONSULTANTS DRAWINGS P'otbo 0 4655) Rooloobbo, 0 4557) bundabe 0 4670)
Phone (01) 41 283955 Phone 07) 54 40400 PhoN 07) 41526655
Far (07)
07)
( 7 41 241683 Fox (07) 54 440516 Fm (07)41 526633
[oti figddhokgelym^ai Gd MA^Idgweno tend 11M11 0 AMMA
M3087/C01 A
Page 14
LEGEND
SEDIMENT AND EROSION PLAN SILT FENCE (SEE DETAIL) NOTE ALL SERVICES
Objective/target Comply with all statutory regulations and FILTER TUBE SEDIMENT I TO BE LOCATED
maintain them during construction and the TRAP )SEE DETAIL) I ON SITE RY CONTRACTOR
maintenance period Comply with this erosion
and sediment control plan to control 13 FIELD INLET SEDIMENT TRAP PRIOR TO ANY CONSTRUCTION
erosion and sediment flows
Management Strategy Site foreman to identify and check direction
of storm water land flows as shown on the CONCRETE MASONRY BLOCKS
(150 SERIES)
plan Provide barriers and other measures
shown on the plan to prevent storm water SILT I FENCE FIXED IN ACCORDANCE
flows over embankments and sediments into WITH MANUFACTURERS SPEC TO
catchpits TEMPORARY SITE FENCING
Tasks/Actions Erect sediment barriers at the top of 1 Y
embankments as shown on the drawing
Strategically place check dams around gully I /
pits
FIELD INLET SEDIMENT
Performance Indicators Site foreman to check erosion and sediment
flows at the base of embankments after
TRAP DETAIL N.T S
rain STEEL / TIMBER POST long TO BE SPACED
Check that check dams are working during AT 3 Om MAXIMUM crs EXACT SPACING OF POSTS TO 7
rain periods FIELD INLET SEDIMENT
BE CONFIRMED ON SITE BY SUPERINTENDENT POSTS TRAP REFER DETAIL
Frequency/Deadline Site foreman to monitor performance after TO BE POSITIONED ON DOWNSTREAM SIDE OF FABRIC
every heavy downfall
SILT LOK' FILTER FABRIC (or approved equiv I
Responsible Person/ Site foreman to be responsible for COMPACTED BACKFILL TO TRENCH FILTER TUBE SEDIMENT
Organisation inspections TRAP REFER DETAIL
FLOW 0
Reporting/Review Site workers to advise foreman if they
notice any barrier needing repair
LAY THE TOE-IN FLAP OF FABRIC IN THE
Corrective Actions Site foreman to report and order through BOTTOM OF TRENCH AS SHOWN
supervisor, extra barrier or check dams as
required
EROSION CONTROL DEVICES
THESE DEVICES ARE DESIGNED TO MINIMISE EROSION AT A CONSTRUCTION TYPICAL SILT FENCE
SITE AND CONSEQUENTLY DECREASE DOWNSTREAM SEDIMENT TRANSPORT DETAILS N.T.S
THEY INCLUDE DIVERSION DRAINS SLOPE DRAINS ENERGY DISSIPATERS
AND LEVEL SPREADERS
DIVERSION DRAINS MAY BE FORMED AS A CUT DRAIN BANK OR BERM OR DAVID LOW WAY
A COMBINATION OF BOTH EXTENT OF EARTHWORKS
SLOPE DRAINS ARE GENERALLY STABILISED DRAINS WHICH DISCHARGE TEMPORARY CONSTRUCTION ENTRY/EXIT REFER TO DETAIL ALL
WATER FROM THE END OF A DIVERSION DRAIN DOWN AN EXPOSED SLOPE CONSTRUCTION VEHICLES TO USE THIS ENTRY THE CONTRACTOR
SHALL CONTINUOUSLY MONITOR THE ROAD ADJACENT TO THE SITE
ENERGY DISSIPATERS (EG HAY BALES) MAY BE NECESSARY AT THE FOR ANY SOIL OR OTHER MATERIAL CARRIED OFF THE SITE AND
ENDS OF SLOPE DRAINS IMMEDIATELY REMOVE SUCH MATERIAL
POST B-1 1- POST B END POCKET
LEVEL SPREADERS ARE EXCAVATED OUTLETS CONSTRUCTED AT ZERO
GRADE AT THE END OF DIVERSION DRAINS TO CONVERT CONCENTRATED
FLOW TO SHEET FLOW
JOINING SECTIONS FOR
CONTROL OF THE WIND CARRIAGE OF DUST SILT FENC E N.T.S
TO ENSURE THAT ALL WORKS DO NOT DETRIMENTALLY AFFECT THE AMENITY OF
THE GENERAL NEIGHBOURHOOD AND THE ENVIRONMENT SURROUNDS THE FOLLOWING
MEASURES SHOULD BE ADOPTED GEOTEXTILE FABRIC
BIDUM U34 OR SIMILAR
PROVIDE A WATER TRUCK ON SITE FOR THE DURATION OF THE CONTRACT PERIOD OVERLAP POSTS AS SHOWN TO PREVENT FLOW THROUGH
ALL TOPSOILED AREAS TO BE TREATED BY SURFACE SPRAYING A MINIMUM OF • DRIVE POSTS FIRMLY TOGETHER AND WIRE TIE AT TOP TO
THREE (3) TIMES PER DAY AT MAXIMUM THREE (3) HOUR INTERVALS UNTIL PREVENT SEPARATION OF FENCE
SATISFACTORY GROUND COVER IS ACHIEVED
RUNOFF FROM PAD
SEDIMENT MANAGEMENT DETAILS GEOTEXTILE FILTER TUBE
DIRECTED TO SEDIMENT TRAP
SAND FILLED
1 PROVIDE SILT FENCES AT THE TOE OF ALL FILL BATTERS BELT LOOP TO BE TWISTED
2 PROVIDE CHECK DAMS AT TABLE DRAIN OUTLETS AND WHERE DIRECTED AROUND TOP OF POST TEMPORARY CONSTRUCTION
3 PROVIDE TEMPORARY SILT TRAPS AS DIRECTED FILTER TUBE
4 THE ABOVE SILT MANAGEMENT MEASURES ARE TO BE MAINTAINED UNTIL
ENTRY/EXIT SEDIMENT TRAP
N.T.S NTS
ACCEPTANCE 'OFF MAINTENANCE
5 THE ABOVE SILT MANAGEMENT MEASURES ARE DESIGNED IN ACCORDANCE WITH
SOIL EROSION AND SEDIMENT CONTROL' BY THE IEA AND MAY BE VARIED BY THE
COUNCILS REPRESENTATIVE TO SUIT SITE CONDITIONS
6 TURFING AND SEEDING ARE TO BE CARRIED OUT AS SOON AS PRACTICABLE REFER FENCE TO POST
TO THE SPECIFICATION FOR SEED MIXES AND APPLICATION METHODS
CONNECTION N.T.S
NOTES TITLE PROJECT DATE MARCH 2008
I This is the property of the engineer and may not BARLOW GREGG M OPOIL, SEDIMENT & EROSION CONTROL PROPOSED OFFICE
CONSULTING ENGINEERS
DESKVIED JM
be used copied or reproduced wholly or in part CC
without the express permission of the engineer Raw n Iw 957 365 ACM IN 957!65 PLAN DEVELOPMENT at DAVID LOW DRAWN
SUNSHINE COAST FRASER COAST EMECKED
Infringement in any way may result in legal action 24 Wolan Steel Pane N71401 Mss WAY. PEREGIAN BEACH
IPA 8. 200
0 CROSSOVER AMENDED 27/1/08 JM 2 Figured dimensions take precedence over scaled ASSOCIATED CONSULTANTS PROJECT-SUBSET-SHEET-REVISION
cc
wodnla0a a 45571
CORAL COAST
Phone 117141S2 4655 for MORGAN & BEIERS ATF
A ISSUE FOR OPERATIONAL WORKS APPROVAL 25/3/08 3 Verify all dimensions on site Paine 1071 5444 N80 CORE ARCHITECTS
Nol Amendment Date By Nol Amendment Date By
Poe 10715444 0536
o(0tmOlmlwgi rei
wNnSUINY CDAS2
Ph.. (0714146 6672 Ph (07) 5444 4511 Fax 1071 5444 4969 M3087 - C02 B
Page 15
2 3 4 5 6m STANDARD NOTES
NOTE: - REFER TO ARCHITECTURAL DRA$7NGS FOR 1 THESE DRAWINGS ARE TO BE READ IN CONJUCTION
WITH ARCHITECTURAL DRAWINGS
SCALE 1100 AT AT BUILDING AND CARPARK SETOUT OMENSIONS 2 ALL LEVELS SHOWN ARE PAVEMENT LEVEL (U NO)
3 CONTRACTOR IS RESPONSIBLE FOR ALL BUILDING
EXISTING SEWER CONNECTION
AND CARPARK SETOUT
TO BE TERMINATED
4 ALL SURVEY INFORMATION SUPPLIED BY
BAY SURVEY CONSULTANTS PTY LTD
WARNING
THE LOCATION OF EXISTING TELSTRA
ELECTRICITY SEWERAGE & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS
PRIOR TO AND DURING CONSTRUCTION
OBTAIN THE PRECISE LOCATION OF ALL
SERVICES IUNDERGROUND & OVERHEADI
FROM THE RELEVANT AUTHORITY
RESPONSIBLE FOR THE SERVICE SHOWN
RL1130
+RL112
RL1115 RLif 15 a+ RL11 22
+RL111T
INDICATES WHEEL STOPS
REFER 113087/C04 FOR DETAILS
841135
LINE MARKING IN ACCORDANCE
WITH AS 2890 1
n I a a - G
+RLT122 RBI?Os _ +RL112S RL1125
RL4119
HATCHING INDICATES CONCRETE
PAVEMENT REFER STRUCTURAL
ENGINEERING DRAWINGS
8M003087/G-01-A TO G-06-A
BUILDING 2
FFL 10.80
INDICATES ROLL-UP KERB KERB
L+ REFER STRUCTURAL ENGINEERING
DRAWINGS BM003087/G-01-A TO
' G-06-A NOTE
F
PAVEMENT FINISHES AND SURFACE TREATMENT
RL1115 1500
STUB IN ACCORDANCE WITH ARCHITECTURAL DRAWINGS
14
AND SPECIFICATIONS.
+RL1125
0
RL11 28
LEGEND
L EXISTING TELECOMMUNICATION PIT
EXISTING TELECOMUNICATIONS- NEW CONCRETE
EXISTING PAVEMENT
EXISTING POWER LINE
EXISTING POWER POLE
STORMWATER PIPE
GRATED INLET PIT
DOWELLED CONTROL JOINT
EXISTING ELECTRICITY LINE
EXISTING KERB & CHANNEL
EXISTING SEWERAGE MAIN
*GRADE EVENLY TO EXISTING CROSSOVER EXISTING SEWERAGE MANHOLE
TYPICAL PAVEMENT DETAILS
RETAIN EXISTING COMMERCIAL CROSSOVER EXISTING STORMWATER LINE
DAVID LOW WAY CONCRETE PAVEMENTS
EXISTING TELSTRA LINE
150m. REINFORCED CONCRETE
EXISTING PIT
5L82 MESH 40mm TOP COVER
CARPARK LAYOUT PLANT 1OO@A1 1SOmm SELECT SUBGRADE (Min CBR 151 EXISTING WATER MAIN
NOTES TITLE PROJECT DATE MARCH 2008
1 This is the property of the engineer and may not BARLOW GREGG 3f9boi
CONSULTING ENGINEERS
CARPARK LAYOUT PLAN PROPOSED OFFICE DESIGNED JM
E COUNCIL AMENDMENTS be used copied or reproduced wholly or in port DRAWN CC
30/7/08
without the express permission of the engineer ASN 77 114 957 363 ACM IN 957 363 DEVELOPMENT at DAVID LOW
D COUNCIL AMENDMENTS 11/6/08 IM SUNSHINE COAST FRASER COAST
Infringement in any way may result m legal action CHECKED
C ADDITIONAL DETAIL ADDED 27/5/08 24 Wxlan Sheer Phone 10714121 3755 WAY, PEREGIAN BEACH
B CARPARK LEVEL AMENDMENTS 14/4/08 CC 2 Figured dimensions take precedence over smled IPA. Bm NB
MooloW.OO 0 45571
CORAL COAST ASSOCIATED CONSULTANTS
for MORGAN & BEIERS ATF PROJEC T-SUBSET-SHEET-REVISION
A ISSUE FOR OPERATIONAL WORKS APPROVAL 25/3/08 CC 3 Verify all dimensions on site Prime (I715444 0490
PAont 88 447 66SS
CORE ARCHITECTS
Not Amendment Date jByINo^ Amendment Date By
Foe 1071 5444 IS36
o6nm0rioHm9'emnet
WNOSOOAY COAST
Cl,., 8714946 6672 Ph 107) S444 4511 Fox 107) 5444 4969
M3087 - C03 E
Page 16
PAVEMENT DETAILS
DRIVEWAY AND DRIVEWAY CROSSOVER EARTHWORKS AND PAVEMENT CONSTRUCTION NOTES
1 EARTHWORKS AND PAVEMENT CONSTRUCTION ARE TO BE CARRIED OUT IN
HATCHING INDICATES CONCRETE PAVEMENT REFER STRUCTURAL ACCORDANCE WITH AS 3798 WITH GEOTECHNICAL SUPERVISION TO LEVEL
ENGINEERING DRAWINGS BM003087/G-01-A TO G-06-A
2 THE CONTRACTOR SHALL PROVIDE CERTIFICATION THAT THE WORK AND 0 _109 so
GEOTECHNICAL SUPERVISION COMPLIES WITH AS 3798
PAVEMENT DEPTHS MAY BE VARIED BY THE SUPERINTENDENT
3 THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION REPORT
FOLLOWING SUBGRADE TESTING 2440 130
4 SITE PREPARATION
COMPACTION STANDARDS 2 No 25 DIAMETER SPIKING HOLES (TO
SUIT SPIKES 20 DIAMETRE x 300
a STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE MINIMUM LENGTH)
ROADWORKS TO 300mm BELOW SUBGRADE 98% STANDARD
ALL VEGETABLE MATTER TO THE BASE OF THE SUB GRADE
ROADWORKS WITHIN 300mm OF SUBGRADE 100% STANDARD
LOT FILL 98% STANDARD
b FURTHER EXCAVATE IF REQUIRED TO BOX OUT TO MINIMUM
SUB BASE GRAVEL 100% STANDARD
PAVEMENT THICKNESS REMOVE AND RECOMPACT FILL AS PER 25 135
BASE GRAVEL 100% STANDARD GEOTECHNICAL REPORT NOTE ON THIS DRAWING
CONCRETE TYPES c COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98% WHEELSTOP DETAIL
STANDARD COMPACTION AS DEFINED IN AS 1289 IN THE TOP 200 NOT TO SCALE
STORMWATER STRUCTURES N32
HUMES TYPICAL WHEELSTOP OR
FOOTPATHS N25 d EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT APPROVED SIMILAR
DRIVEWAY PAVEMENT INCLUDING
SPOTS OR HEAVING SUBGRADE AREAS STRUCTURAL FILL SHALL BE
ROLL UP KERB N32 APPROVED GRANULAR FILL (100mm MAXIMUM PARTICLE SIZE,
MINIMUM SOAKED (BR = 15 PLACED IN LAYERS NOT EXCEEDING
NOTES 200mm AND COMPACTED TO ACHIEVE NOT LESS THAN 98 PERCENT
MAXIMUM RELATIVE DRY DENSITY (STANDARD) OR 70 PERCENT DRY
PROVIDE SUBSOIL DRAINS UNDER ALL KERB AND CHANNEL AND
DENSITY INDEX IN ACCORDANCE WITH AS 1289 SITE FILLING
OTHER KERBS AND PAVEMENT EDGING
MATERIAL AND COMPACTION UNDER THE PAVING AND BUILDING
SHALL BE AS ABOVE
PROVIDE 1000 HEAVY DUTY CONDUITS 200mm AND EXTEND
UNDER CONCRETE DRIVEWAYS WHERE CONDUIT LOCATIONS
REQUIRED
NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT
OF WORK WITHIN EXISTING ROAD RESERVES
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL
EXISTING SERVICES WITHIN THE SITE PRIOR TO COMMENCING
WORK THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO EXISTING SERVICES WHETHER SHOWN ON THE
DRAWINGS OR NOT
ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL
AUTHORITY S SPECIFICATIONS AND REQUIREMENTS
NOTES TITLE PROJECT DATE MARCH 2008 SCALE AS SHOWN
1 This is the property of the engineer and may not BARLOW GREGG
CONSULTING ENGINEERS
STANDARD DETAILS - GENERAL PROPOSED OFFICE
be used copied or reproduced wholly or in part
without the express permission of the engineer ASM 77 IN m57 763 ACM 114 957 33 DEVELOPMENT at DAVID LOW DRAWN cc
SUNSHINE COAST FRASER COAST CHECKED
C CROSSOVER DETAIL REMOVED Infringement in any way may result in legal action
27/5/08 1M 24 Wean Street PAOre 1071412019SS WAY. PEREGIAN BEACH
8 DETAILS AMENDED 75/4/08 CC 2 Figured dimensions tape precedence over scaled IPA Bee 100
CORAL COAST ASSOCIATED CONSULTANTS PRO JEC T-SUBSET-SHEET-REVISION
ISSUE FOR OPERATIONAL WORKS APPROVAL
NoolWabo 0 45571
More 1071 457 NSS for MORGAN & BEIERS ATF
25/3/08 CC 3 Verify all dimensions on site Ptore I071 S444 0400 CORE ARCHITECTS
NoJ Amendment Date By NoJ Amendment Date By
Fox 1071 5444 OS36
amne0lorgre8net
WMTSUOAY COAST
Plane 10714946 6672 Ph 1071 5444 4511 Fax (07) 5444 4969 M3087 - C04 C
Page 17
9
LEGEND EGEND
PROPOSED CATCHMENTS NEW CONCRETE
SCALE 1100 AT Al
450 x 450 FIELD INLET
0100 FLOW PATH EXISTING PAVEMENT
4S0 x 450 FIELD INLET
mpVC
ISO
STORMWATER PIPE
RL1135 EXISTING SEWER CONNECTION
GRATED INLET PIT
TO BE TERMINATED
DOWELLED CONTROL JOINT
EXISTING ELECTRICITY LINE
NEW SEWER CONNECTION
'qF EXISTING KERB & CHANNEL
EXISTING SEWERAGE MAIN
EXISTING SEWERAGE MANHOLE
EXISTING STORMWATER LINE
EXISTING TELSTRA LINE
EXISTING PIT
EXISTING WATER MAIN
WARNING
THE LOCATION OF EXISTING TELSTRA
ELECTRICITY SEWERAGE & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS
PRIOR TO AND DURING CONSTRUCTION
OBTAIN THE PRECISE LOCATION OF All
SERVICES (UNDERGROUND & OVERHEAD)
FROM THE RELEVANT AUTHORITY
RESPONSIBLE FOR THE SERVICE SHOWN
I t- - EXISTING SEWER MAIN
II
BUILDING 3
FFL 10 20
BUILDING 2
FFL 10 80
450 x 450
FEILD INLET
11111
NOTE
REFER TO STRUCTURAL ENGINEERS DRAWINGS
FOR BASEMENT DRAINAGE LAYOUT
CONNECT NEW STORMWATER
DRAINAGE INTO EXISTING GULLY PIT
MAINTAIN EXISTING STORMWATER
DRAINAGE D/S
3000 C12 CONNECT NEW STORMWATER
DRAINAGE INTO EXISTING MANHOLE
MAINTAIN EXISTING STORMWATER
DRAINAGE 0/S
600 x 600 FIELD INLET
`EXISTING TELECOMMUNICATION
/PIT
EXISTING TELECOMUNICATIONS -
.EXISTING POWER LINE
EXISTING POWER POLE
EXISTING
SEALED PAVEMENT PIT No PIT TYPE
SL IL DIST GRADE PIPEg1
/1 11150 10 300 600 01 FOX BGPCT
11150 10175 14 200 1056 1/2250 0.i
1/1 60001FOX BGPCT
3/ I 11150 9970 17400 1034 1/2250 Cu 600 GI FOX BGPCT
7 300 1301 1/38051 CLi
4/I 11150 9000
30000 1016 1/300 CL2 600GI
5/1 10900 1 470 30600 1045 1/300 0 11.2 60001
9150 EX PIT
CONSTRUCT COMMERCIAL ACCESS IN ACCORDANCE
WITH N S C STD ORG 9002
DAVID LOW WAY E%/1
1/2
10600
0850 8225
1170 Own 7/75053 mPVC 4S0 GI
i/1 B 600 B 150 650 Of
24 050 D 570 1/1500 mPVC
STORMWATER LAYOUT PLAN 1100 @A1 3/2
EX/2
8660
6570
BOOB
7910 5760 0570 1/2250 mPVC
450 GI
EX PIT
NOTES TITLE PROJECT DATE MARCH 2008 SCALE AS SHOWN
I This is the property of the engineer and may not B
BARLOW
` NEERL O
RSEGG ]1N^11 a
GR STORMWATER LAYOUT PLAN PROPOSED OFFICE DESIGNED, JM
E COUNCIL AMENDMENTS 30/7/08 JIM be used coped or reproduced wholly or in port
without the express permission of the engineer
kEN 77 114 %1061 A,ON 114 %7665 DEVELOPMENT at DAVID LOW CC
C
B
COUNCIL AMENDMENTS
ADDITIONAL DETAIL ADDED
CARPARK AMENDMENTS
11/6/08
26/5/08
15/4/08
JIM
JM Infringement in any way may result in legal action
2 Figured dimensions lake precedence over scaled
HGB
SUNSHINE COAST
21 WxIan StreeI
IP 0 Be, 100
Mxelenlam 0 4SS71
FRASER COAST
Phone 1071408111,
CORAL COAST
Phee 19714157 fill
ASSOCIATED CONSULTANTS
WAY, PEREGIAN BEACH
for MORGAN & BEIERS ATF
CHCHED A P,E a
PROJECT-SUBSET-SHEET-REVISION
/ ^'3c7
A ISSUE FOR OPERATIONAL WORKS APPROVAL 25/3/08 CC 3 Verify all dimensions on site Ph,, 10715444 0400 CORE ARCHITECTS
Nol Amendment Date By Nol Amendment Dote By
Fax 1071 S444 0516
aNW6aNwgrygnl
8NTSLOAT COAST
Phde 10714946 602 Ph (07) 5444 4511 Fax 1071 5444 4969 M3087 - C05 E
Page 18
HI
STORMWATER NOTES
i STORMWATER PIPES SHALL BE AS DETAILED ON PROFILES
a a a
THE FOLLOWING PIPE TYPES MAY BE USED IN ACCORDANCE WITH COUNCIL S
APPROVAL CLASS SIZES NOTED ARE A MINIMUM ONLY AND SHALL BE
DETERMINED BY COVER REQUIREMENTS FROM DESIGN
PVC PIPES MINIMUM CLASS 6 GREATER THAN 600mm COVER
PVC PIPES MINIMUM CLASS 9 LESS THAN 600mm COVER
RCP PIPES RRJ CLASS 2
FRC PIPES ADCOL JOINT CLASS 2
POLYPROPYLENE RIBSTRUCT PIPES
PIPES TO BE LAID IN ACCORDANCE WITH THE MANUFACTURERS
SPECIFICATIONS AND AS 3500
2 MINIMUM GRADE OF 1 IN 100 FOR ALL STORMWATER PIPES UNO
3 ALL STEEL GRATES AND FRAMES TO BE HOT DIPPED GALVANISED AND SHALL BE
CYCLE PROOF IN ACCORDANCE WITH AS 3996
4 PIT SCHEDULE
WEBFORGE OR APPROVED EQUIV
SIZE IN TRAFFICABLE AREAS OTHER
300x300 MSG33C MSG33A
450x450 MSG44C MSG44A 1/2250 CL2 2759 «: 3000 11.2 1/3DOO «2 1/3000 n2 DRAM IMO/mm/CLASS) 1/1500 mPVC 1/1500 mPVC 1/2250 mFV[
DRAM. INo/ENm/CLASSi
600x600 MSG66C MSG66A lash W4 301 1016 1045 GRADE (PERCENT) 0427 0520 0570
GRADE (PERCENT)
900x600 MSG69C MSG69A 0010/0048 ODm/0079 0056/01St 0 056/0 127 0D54/0 112 PIPE FLOW/CAPltu.m) 0 011/0 017 0 013/0 022 5070/0000
PIPE FLOW/CAP(cu mI
4200 17 400 7300 30 000 30600 REACH LENGTH (ml 11700 24 050 s260
GRATED DRAINS REACH LENGTH (m)
300 WIDE MTG30C HYD GRADELINE (m) w HYD GRADELIN E (m)
5 63 INDICATES FINISHED SURFACE LEVEL DEPTH TO INVERT (m)
DEPTH TO INVERT Im) t :2
6 THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING WORK
INVERT LEVELimI INVERT LEVEL(m)
7 THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES AND LOCATE ALL
SERVICES BEFORE COMMENCING WORK SURFACE LEVEL Iml SURFACE LEVEL (m)
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED TO
SERVICES BY THE WORKS IRRESPECTIVE OF WHETHER THE SERVICES ARE SHOWN CHAINAGE CHAINAGE
ON THE DRAWINGS OR NOT
LINE I LINE 2
STORMWATER LONGITUDINAL SECTION VEERTZ 1'104
80D/N6 SCl9'DUL£ -600mm x 600mm SO GRATE
NOMINAL GRAVEL BEDDING GRAVEL BEDDING MATERIAL SHALL HAVE A IWEBFORUE MSG66B or Equiv I
MINIMUM BEDDING MINIMUM
EXTERNAL MAXIMUM SIZE NOT EXCEEDING 9 Smm
WIDTH A DEPTH B SPACING BETWEEN
DIAMETER SAND BEDDING SAND BEDDING MATERIAL MAY BE NATURAL SAND
ft
(.in) 105 w D mm) MULTIPLE CULVERTS
D(..) MANUFACTURED AND OR A MIXTURE OF NATURAL AND MANUFACTURED
300 300 110 SANDS COMPLYING WITH AS 27561 FOR FINE AGGREGATE
375 300 135 COURSE AGGREGATE BEDDING MAY BE USED FOR ALL DEPTHS IN DRY
450 300 160 300 OR DEWATERED TRENCHES IMPORTED BEDDING MATERIAL SHALL
525 300 lea COMPLY WITH AS 27581 FOR 14mm NOMINAL SIZE COURSE AGGREGATE
600
750
900
300
450
450
205
25S
310
ENCLOSE THE BEDDING IN GEOTEXTILE SPECIFIED WHERE FLEXIBLE
PIPES ARE LAID IN SANDY TRENCH MATERIAL OR WHERE SAND
BACKFILL IS USED WHERE NO GEOTEXTILE HAS BEEN SPECIFIED THE
a 5L72 MESH (CENTRAL)
1050 450 360 OEOTEXTILE TO BE USED SHALL BE AS APPROVED BY THE
1200 450 405 600 SUPERINTENDENT
1350 450 450 CONCRETE BEDDING/CRADLE MAY BE USED WHERE THE PIPE
1500
1650
500
500
SOS
550
REQUIRES PROTECTION FROM HIGHER LOADINGS PIPE UNDERLAY SHALL SECTION e
BE N20 CONC MECHANICALLY VIBRATED TO ENSURE THAT ALL CAVITIES
1800 500 600 AROUND AND UNDER THE PIPE ARE COMPLETELY FILLED WITH CONCRETE
1950 500 665
2100 500 715 LEGEND
2400 600 010 900
FOUNDATION BEDDING/HAUNCH MATERIAL
2700 600 910
705 REP s AND R C BCa
3000 1005 '1-
BACKFILL MATERIAL
NOTES
I SIDE SUPPORT COMPACTION OF NATURAL GROUND DR
EMBANKMENT MINIMUM 90% STANDARD RELETIVE 11501 6d00 1+501
ALTERNATIVE SIDE SLOPE DRY DENSITY FOR MIN 2 5 Din EACH SIDE OF rl-1 ^
TO SUIT NATURAL STABILITY TRENCH WALL AND TO A MIN DEPTH OF 0 7 Dm
2 WHERE CULVERTS ARE UNDER ROAD PAVEMENT PLAN
BACKFILL SHALL BE APPROVED ROAD BASE MATERIAL
PIPE INSTALLATION DETAILS FIELD INLET PIT DETAILS 125
TITLE PROJECT DATE MARCH 2008 SCALE AS SHOWN
NOTES
i This is the property of the engineer and may not BARLOW GREGG STORMWATER LONGITUDINAL PROPOSED OFFICE JM APPRoV[
CONSULTNO EN014EERS
be used Copied or reproduced wholly or in port
A"N 77 114 957 363 ALN MN 857 363 SECTIONS AND DETAILS DEVELOPMENT at DAVID LOW DRAWN CC
without the express permission of the engineer
SUNSHINE COAST MASER COAST RPEO 1330
C COUNCIL AMENDMENTS 30/7/68 3M Infringement in any way may result in legal action 24 Wolgn Street More 1071603055 WAY, PEREGIAN BEACH C HEC K ED
2 Figured dimensions take precedence over scaled IBe,
P.O 200 ASSOCIATED CONSULTANTS PROJECT-SUBSET-SHEET-REVISION
8 COUNCIL AMENDMENTS 11/6/08 3M M,xIooI6*o 0 45571
CORAL COAST
for MORGAN & BEIERS ATF
A ISSUE FOR OPERATIONAL WORKS APPROVAL 25/3/08 CC 3 Veri t y a ll d imensions on si t e Pom 1071 S444 0401
Pb.. NN 487 6655
CORE ARCHITECTS
NoJ Amendment Date j ByI Noj Amendment Date By
far 1071 S444 0536
odmlorIwgrgq.kl
WNTS(RU COAST
Pom 071446 6672 Ph (071 5444 4511 Fox 107) 5444 4969
M3087 - C06 C
Page 19
1DI@VT@ID3IPMJBAH ait
247 D W WL'Y lay
m^ I^3^II HULINY IPR0IPTERIT^
'TIRUO'T H6.2
IJ WKNG II ]EX TEA
NREAD THESE DIAMONDS N CORAMETON WITH
ARCHITECTURAL AN OTHER ENGINEERING
DRAW NOS AM SPECIHCATBIS AM WITH
It AL CONCRETE WORK AM REW/KEPOT TO
BE EXECUTED N ACCORDANCE WIN THE
RELEVANT SA A IONS AND SPECAATINS
[NFFFTE NEFY MAMWY
Ill ALL CONCRETE LOCO MASONRY WORKS TO
BE EXECUTED AN ACCORDANCE MTN THE
CRAM EDITION OF-
ST TIRAL 5T05
SL ALL WORKMANSHIP B MATERIALS SMALL BE N
ACCORDANCE WITH AS 4101 S AS 554 EXCEPT
WHEN VARIED BY THE SPECIFICATION,
STRUCTURAL MOM!
It ALL WORKMANSHIP AM MATERIALS SHALL BE
A ACCORDANCE WITH THE FOLLOWING
AUSTRALIAN STANDARDS
TPT PAB^MATE AND ERECT PRECAST PAWLS IN
AEEORANCE WITH THE CURRENT EDITION OF
AS 301 AVID AS 31SO
SUCH OTHER WRITTEN MTRNTEN AS MAY N PARTICULAR THE CURRENT EOITpR OF AS
BE 651W NN AS 3700 S AA MASONRY (ME 57 ALL STEEL SHALL BE N ACCORDANCE WITH AS AS 2151 VISUALLY STRESS RAND TP2 READ THESE NOTES AN CGINHUNCTIAN WITH
AS 4455 CON SITE MASONRY UNITS %E BRAOE 250 OR 1110x0 HAS 1463 HANWOO FOR STRUCTURAL 'AEAFA[ED CONCRETE
@ PRAY SET OUT UMD610V5 SHOWN ON 3HE CO REFER DRAWL05 FOR CONCRETE AIFOISM AS 3MI S A A CONCRETE STRUCTURES C000 GRAN ISO FOR RECTANGULAR 1 STAR PURPOSES
AAWNBS MM SITE WORKS CONSTRUCTION AA BUALIlY
00-01 TITLE PAGE & GENERAL NOTES AM FABRICATION COMMENCES REFER ANY
DSCREPANCY TO THE ENTER BEFORE [1 CONCRETE TESTNO TO CIFORM WITH THE
AS 209 MASDIMY WALL TIES
AS 36912 MASNRY CONSTRUCTION
ACCESSORES
HOLLOW SECTORS OR ULAN 711 FA
CIRCULAR ALLOW SECDONS 10 MS tan 0D &
GRAD ASI AIM W fin 001
AS W4 111004 FRAHM CODE
AS U21 TWER STRUCTURES
AS VAR _ HUMAN ALLY STRESS-GRADED
TP3 WORI PRACTICES SMALL AMPLY WITH THE
MISS MUSTRY CODE OF PRACTICE FOR TILT
up CISTNICIM
00-02 STEEL SCHEDULES PRDIEEONO WITH THE WORK ACCEPTMIITY REQUIREMENTS OF THE
CURRENT EDITOR 0 AS 3661 MA CLEAN OUT At KS TO BE USED AT FIRST SO WEEDS SHALL BE TO THE AENENNTS OF
TIMBER
THE ALL PANELS SHALL BE SE TNCO V.NA
BS A NS OBTAIN DIMENSIONS BY SCALING FROM COURSE ABOVE EACH FL WA AA ALL MORTAR AS ISSA A SHALL BE Wee CONTINUOUS FILLET T2 ALL STRUCTURAL HALER SHALL BE N A MPORCED WITH SU7 FARE LAC
00-03 BASEMENT SLAB RELIEF DRAINAGE SYSTEM LAYOUT THE ORANNS CA IN CONCRETE SLUM SHALL NET BE LESS
SNW TANS AND ROT MORE THAN EM.
ID BE REMOVED FROM ECUs PRIOR R
CONCRETE MLM
WELDS LESS SHOWN OTHERWISE STRESS DAN AS 1RATED ON THE
DRAWINGS
CENTRALLY ONE
A ALL WORKMANSw AND MATERIALS SMALL BE S4 BUTT WELDS SMALL BE PRE-QUALIFIED IFS PROVE E IAMIEI BARS TO PANEL
N ACC CAKE IN THE CURRENT 5 A A CS AL CONCRETE S TO BE VIBRATED Al A NO COMETE NK USED TO LL CAVITY SO HAVE COMPLETE PENETRATION BUTT WHS. ALL 13 ALL V61BLE STRUCTURAL MOM SAGGED TO PERREER AND ALL PENEIRATMS TRIMMER
B-01 BASEMENT SLAB & FOOTINGS LAYOUT CONS AND THE BY LAWS AND ADAANES
OF THE RELEVANT BUILDING AUTHORITY
TRADESMAN LE MANNER NO WATER BE
AMA OR SITE
CARACTERISTE COMPRESSIVE STRENGTH OF
NNPP A C NAIDMIN SLUMP 031- MAXIMUM
WHEN SMALL BE ATEDORY SP N
ACCORDANCE WITH AS 554 UNLESS NOTED
BE CLEAR OR TRANSPARENT STAN FMSND
SHALL COMPLY WITH THE APPEARANCE GRAN
LAPS AND EXTENSIONS TO BE 600 "0.
AGGREGATE SIDE 6.. MMPAI 6 COURSE DTIOW1E SPECFBD IN THE RELEVANT AUSTRALIAN TPA LM MESH LAS
B-02 BASEMENT WALLS & COLUMNS LAYOUT Px THE STRUCTURAL WORK 51CYN ON THE
OAWNCS HAS BEEN ESILEO FOR THE
(1 A HOLES CASES OR VMS OTHER THAN
THOSE SHOWN ON THE STRUCTURAL DIAMONDS
CENT PLACED AT NE IIUI
SS ALL GUSSET AA IDWECTION PLATES SHALL
STANDARD WO[5 IN
B-03 BASEMENT FOOTING DETAILS SHEET 1 LADS SET OUT N M TELL BELOW W
ACLOROAXE WITH AS I'll PARIS I I 1 IT
ARE TD BE AN WITHOUT MI APPROVAL
0 THE ENGINEER
Me SLABS SUMPDRTED ON LOAD BEANS
SLOCKWOR O 70 HAVE APPROVED SLIDM IDN1
BE 1a. UNLESS SAWN OTHERWISE R ALL SOFTWOOD SHALL BE SEASONED TIMBER
HAVING A MOISTURE CONTENT RANGE BETWEEN TPl CONCRETE TO BE AM UCD AA R NMEVE
MATERIAL LAC ON A FLAT LOFACF OR TOP SE BASE /RTES SALL BE N.N 1101ESS SAWFI 11% AN 5% F REQUIRED BY THE EN7NEER 250H PRIOR 10 LFTIN SUBMIT MID DESIGN
B-04 BASEMENT FOOTING DETAILS SHEET 2 G4 ILL STLCTURAL WORK NAT BE NSPECTEO
AM APPROVED BY THE ENGINEER
M TEAR COVER TO ALL RENORCEMENT
(UNLESS 51NN OTIERN%EI TO RE N
OF BLOCKS OTHERWISE EVIDENCE Of THE TIMERS POSTURE CONTENT
SHALL BE PROVIDED BY THE SUPPLER
FOR APPROVAL
ACCORDANCE WITH REOUREMENTS OF AS 3611 ITS BLOCKWO MST ACT BE BUILT DR CONCRETE S7 IMYM SO. RADIUS CUI SMALL BE MADE TD III ALL EXTERIOR ASI Al HARDWARE TO BE
B-05 PRECAST PANEL ELEVATIONS A FORTYICVI IOU INKS NONE MUST RE
OVA TO T E URWER PRIOR TO AM
AS NOTED 011"M "GS ERNS OR BEAMS UNTIL FORWORN
SUPPORTING SALE HAS BEEN REMOVED SIT
4I RE ENTRANT MOR AS IS TIER SMALL BE HANDLED AND STORED SO
AS NT TD OVER STRESS THE MEMBERS AT
GALVAMED TOUCH A SITE WELDS WITH E
DAIS TYPE 4 MUNDANE ZONE SALIERTE
COTE ELSE FOURS OR OTHER SIMILARLY CRUCIAL Cl CONSTRUCTION RENTS WHERE MOT SHOWN ALL MERNAL STEELWORK 5 TO BE ANY Tue. TIER DELIVERED TO THE SITE PRMR
FUSES OF CONSTRUCTION. SHALL BE LOCATED 10 THE APPROVAL OF THE M6 MORTAR A BE MIXED N PROPORTION DO HEIIAMCALLY WOE AUSNEO To SHALL BE STORED LEVEL HOT LESS TAN
G-01 GROUND LEVEL SLAB LAYOUT (EMIR I ILMATM AEPMAIM
ENOREEK 111.141 CEMENT HYDRATED LNSAN IN
ENCAALENT CEMENT MIND MORTAR WITH
REMAIANTS OF AS 11111 AA HAVE 1
COATS OF A 714 RE. PRIMER PANT
ERA OFF THE GREW EYEMY SUPPORTED
WELL VENTLATED AA PROTECTED FROM THE
IPM CAST N FERRULES To BE MLA ALERTS ARC
INSTALL IlAM LDI6 A. DIAMETER BAR
Cl ALL CONCRETE SMALL L ADEQUATELY PLASTESIN AND MORTAR [IMPRESSIVE CIPLYNO WITH AS 3751
G-02 GROUND LEVEL WALLS & COLUMNS LAYOUT Ft PREPARE EXISTING FDIMATM BELOW THE
ALLOW BY REMOVAL OF ANY TDPSOL VIBRATED MID PLACE AA CORED
CMITAWSLY FOR NOT LESS THAN SEWN 171
STAAGTH AT 71 DAYS 10 BE 21FV• IMM.1
ALL EXTEND STOELWONX 6 A E NOT
ELEMENTS
IA ALL HARDWOODS SMALL AVE A 1I1M
IHROUN HOLE N BASE OF EERT UREA
IPM GROUT SMALL E A PROPRIETARY MR SHRINK
INIINNE OR4AE AN/OR INOR6MC
G-03 GROUND LEVEL SLAB BOTTOM REINFORCEMENT LAYOUT ENTER WINCH MAT WIIII COWACTM DAYS N AN APPROVED AMDI. MT CARACTEWSTE CDIPRESSRE STRENGTH OF
BLOCK I IY 5 We MN 0
DIPPED ALVANS[O STEELWORK ID BE
GALVANISED SHALL BE CLEARED TO
STRESS NAMG PA IAESS ABED
OTHERASL ALL SOFIWWDS SMALL AVE A
CEMENTITRA S GROUT MIMED TO THE
MANUFACTURERS INSTRUCTIONS
FE DEEPER FOOTINGS AE SLAB STMEMN (L FORMWORK DESIGN CONSTRUCTOR PROPPING REODRDNNIS OF AS 4X1 CLASS 21/1 DR FMIM ST SS CRACK Fe OR MGPIF FOR
G-04 GROUND LEVEL SLAB TOP REINFORCEMENT LAYOUT BEANS TO BEAR ON FOAAIM ATONAL
WITH MMMIIM SAFE SAVING PRESSURE AS
AND WEEDWEA To SUSPENDED SLABS TO
BE N AClORANCE WITH AS HATS
Me !OVER RO REPFAEMFNT 21nn M FROM
IWE FACE D DISCO LLNO
EVER A AT DP ALVANSA TO
AIRLINE MINTS OF AS ASIA
PRE NWOI IPM PANELS AVE BEEN DESIGNEE 10 RESIST
EARTH PRESSIE BAD AND LIVE LOWS
R ALL TOWER EXPOSED TO VFW EXTERNALLY WHEN THE PANEL 5 IN R VERTICAL
G-05 GROUND LEVEL SLAB SECTIONS SHEET 1 P)
NOTED N THE TABLE BELOW
COMPACT FDMOATM BELOW THE CONCRETE
CR NIPPED FORMWORK DOC MTAIM
PREPARED BY A SUITABLY RUMORED PERSON
NO PAVE STARTER BARS TO MATCH VERTICAL
REINFORCEMENT 1711 N 410 LEGI
59 BL TS 101E MM STRENGTH SOLO TINT TO
AS 4111 01 110/51 MOLD
SMALL BE SAW FINISHED UNLESS OTHERWISE
SO COCA WHEN SPECFA R BE DRESSED
POSITION AA TIED MID THE FINAL
STRUCTURE STRESSES DU TO tHIM AA
COMP YOM WITH THE USIA AN PROCEDURE ALL EXPOSED CORNERS SMALL BE ANISM HANDLING HAVE NOT BEEN CONSIDERED AN THE
G-06 GROUND LEVEL SLAB SECTIONS SHEET 2 SLABS TO R STAAWD OF COWACTM FA
FILL UNDER LABS OR FOOTINGS HEREUNDER REA MEFNTS OF AS 3615 TO BE PROVED
BY THE FORMWORK CONTRACTOR STRICT
MW. PPDYE It MRS TO AT CH VERBAL
RONACEWAT 1611 M MI LEG)
510 ALL 1015 BOLTS B WASHERS TO BE
AIVAMED TB N
ALLALL BOLTED TIMBER STRUCTURAL TATS
BASIN THE PRECAST CONTRAHEM SHALL
PADVEE EXTRA HARDWARE AND EAORCIE
UNLESS NOTED OTHERWISE
[OMPLAHEE WITH R BACOPAPPYG AND ST EL BEES AS SPECKED IN AS "IT AS AENIBA FOR THESE LADING MMINS
01-01 FIRST LEVEL SLAB LAYOUT F4 SAN D ALE UNDER SLABS OR FOOTINGS
SMALL BE PLACED N MAD Ill. LAYERS
RESHOM RERLNEWNTS OF AS 3610 5 R
BE MANTAINEO
ML PROVE MIN BIB BEAM TO TOP OF ALL
EXTERNAL WALLS AA AT FIRST FLOOR LEVEL
SI MCMG DOWN SOTS TO RE SUPPLED
COMPLETE WITH LEVELLING RUTS ALES AND
WASHERS
SMALL IE FITTED NCO PREBOED TOWER WITH
BUT HOE UAHETERS11% MAZER SAN TPO THE PRECAST (CONTRACTOR SMALL BE
MCCIIPACIED DEPTH COMPACTED N ADIOR CED WITH 2 M HORIZONTAL TOP AM BUT MITERS AND PITIED WITH WASHERS RFSPOHEBLF FOR THE TEMPORARY PROPPING
01-02 FIRST LEVEL SLAB BOTTOM REINFORCEMENT LAYOUTS AC CAKE WITH AS TM COUNTY ME TO
BE GREATER THAN 78% IN ACCORDANCE MY.
ALL FORMWORK 5 TO BE ASPECED I
APPROVED BY THE FDRHWORK DESIGNER PAM
ACTION UNLESS OTHERWISE OETAEO NOTED
OR SPECIEO SO CAUSED PANE WORK A ALL MIS BUTS
AS WEN BELOW Of THE PANELS STABILITY SMALL BE
MAINTAINED UNTIL THE FINAL SUPPORTING
AS 1IP1 TO AE PLACEMENT OF CONCRETE AND WASHE RO SMALL E CLEARED AND E N ALL BETA TIMBER STRUCTURAL IDMS STRUCTURES HAVE BEEN COMPLETED
01-03 FIRST LEVEL SLAB TOP REINFORCEMENT LAYOUTS FS FILL ATEAL OTHER THAN SAN IN NAVEL (12 SYWIS ON DRAWINGS FOR GRADE It TYPE
MHO. ROVE NM LINTEL TO TOP D ALL
OFFERXD5 UP TO LW MENACED WIN 2 NN
REINXNO AFTER ERECTION WHERE STEEL PLATE DOES HOT PROTECT
TIMBER WASHERS AS SPERM BELOW SMALL TP13 TM PRECAST CONTRACTOR SMALL SUPPLY
OF RAEYPoM ELMNI ARE AS FOLLOWS, NRMA TOP AND BOTTOM UNLESS 511. CONCRETE ERCASEO STEELWORK 70 BE LEGS BE PROVED ALL AST Al HARDWARE AE STRDDBACKS
01-04 FIRST LEVEL SLAB SECTIONS DECOMPOSED TEEN A BROKEN AUK FREE
FROM NONE MATERIAL AUG LUMPS OF HS A DE US STRUCTURAL (NAPE 230
MAY RAW BAR TO AS 4671
OTHERWISE DETAILED ACTED 0 SPECIFIED NONMED AND BE WRAPPED N FEW LI
FORM APES RCCRME SAWN. NWMM REWIRED SOU 0 NASNIS EN
AS RENAL LIFTING PROWS SMALL BE
MIALLED N ACCORDANCE WITH M
UNDER SLABS OR FOOTINGS 70 BE CMPACTE
X ON TES HOT ROLLED GRAN NO ML PAVE NM LINTEL TO TOP OF ALL STRNIIRE RIMED MYTS IOU AMPAITiMO SPNFXAMM
TO SIEVE A DENSITY RATIO ICALMAED BY
R-01 ROOF FRAMING LAYOUTS AS EN OF NOT LEO THAN E% AT
AMWM DRY DENSITY AS EENNNED BY AS
IN DE FORHEO BAR TO AS 4671
SAES NAM DRAWN MR!
BEWORAL ABBE TD AS NL
MORRIS GRATLA THAN 21. AND LESS THEN
I SS AEWONLED WITH 2 N% HMZONTAL TOP
S BOTTOM UNLESS OTIEWE STALED
SW TM A COMES OF ALL WORKSHOP DRAWINGS
TR AN SIR TIED To FINE INKO MAP
APPROVAL OBTAINED N WORM BEFORE
MILT INWN55
SNARE
WASHER RN
INSIDER 111 LPN THE PRECAS T CONTRACTOR SHALL SEMI
NM IN LENGTH
0 WORKSHOP AAWNGS RETAILING PANEL
R-02 FIRST LEVEL ROOF PURLIN LAYOUTS FA PROOF ROLL THE FOUNDATION AN REMOVE
013 MAYNUM CONCRETE AGGREGATE SIDE TO AN
ICED ON SPCIIPo FAAHATM 5 CIMNED APPROVAL DOES
HOT NLIE CHECKING MMMS W 16 N S
DENSWS AM Le 6 POINTS
REHFAEMENT AN STRONGRACES TO THE
AN RECONSTRUCT AREAS THAT BREAK UP OR IRAN UN 0 MA PROVE IN BRE BEAM MOVE AN ELM MO 21 N I ENNER FOR APPROVAL AT LEAST 2 GAYS
R-03 ROOF FRAMING DETAILS SHEET 1 SMW EVIDENCE OF MOVEMENT URGER THE
PROD LADM CU DOWEL BARE SHALL BE GROAD M NECESSARY
ALL MMES REWMED WITH 7 M
IEWMTAL WYLAI SILL ON LINTEL
M
Mp
25
31
1.5
S
45
51
PROW TO MANUFACTURE Of THE PANELS. THE
SNP ONAWNN SHALL BE PREPARED N
R HEAVE AN PROACIONS BABAS ETC REINFORCEMENT NOT YWWAIID MCORANE WIN THE CURRENT EDITION 0
R-04 ROOF FRAMING DETAILS SHEET 2 Fi CONSTRUCT FOOTINGS UNDER ALL LOAD
BALM WALLS ITY/CAL I&S. REINFORCEMENT LAYER NOTATION MS PAVE VERTICAL CORSIWCIM HUNTS AT
MW
-
41 M
I-S.1
S/ M 3550
•A• FAST GO ?TONI LAYER 6101 WAX (AS TO M APPROVAL 0 THE TM ANY PAWLS DAMAGED BURK CONSTRUCTION
T RELIC LAYER ENNEER IAESS OTHERWISE DETAILED MTED MN 6B M S TRANSPORTATION OR RECTAL SHALL BE
D-01 WALL. COLUMN AND STAIR SCHEDULES AND DETAILS FL UP AVE CORER MRS EQUIVALENT TO THE
HEM CEMENT N R FOOTING TO BE
Y' TICC LAYER
'a' LAST ITOFI AYE
OR SPECKED
i"I ALL WASHERS TO BE GALVANISED UN D
RENTED (MESS WAND UNIONIST BY
THE 06 ER SASEOLMT TO MECIM OF
PROVIDED AT CHANGES IN WEETM AM
D-02 PRECAST PANEL DETAILS AUCTION OF FOOTINGS
MORMUM LAP OF RONFORCEHENT TO BE AS
SAWN ON DRAWINGS
HAS PROVE REINFORCEMENT AS IMWYED ON
PLAN P051001(0 CENTRALLY WINM THE
BLOCK CAVITY UNLESS OTHERWISE DETAILED
THE DAMAGED PARELISI
M REFER 70 THE EEE(MUCAL REPORT AS iM PANELS RETAMO SA SMALL BE RWPED
D-03 SIGN DETAILS NOTED N THE TABLE BELOW CL BM CHARS MROUTM EMAEMWT ETC.
TO BE PROVED R THE ATEACTM OF R ACTED N SPECIFIED
OURM THE BA[LRLM OPERATON.
BAIIRL TO BE MACHO Y SUCH A MANNER
EWGMER MS ALL NOMLOAOBEANING MASONRY TO BE AS CO MNSE THE DYNAMIC LOADING AN
CONSTRUCTED WITH A HEMS OF ICS THE PANELS
WIND LOADS CS ALL CONCRETE FALLS ARE TO BE [IMOED CLLAONE FRM THE SLAT SOFFIT
• REGION B WITH HYORAUC CONSULTANT I ABONYECTS EOMRESSIBLE FALLER 6 SD BE PROVIDED 110 III PAWLS TO COMPLY WITH BU SPEC Lt"
• TERRAIN CATEGORY 20 Do MOM ETWEE THE ASOEY AN SLAB SORT
DESIGN OUST WIND SPEED CL ALL TOES ARE TO BE PLACID ON AN ELASTIC
(V711 4101/S IEDDM A WITH SOLENT EXPANSES WRITS
To ACCDIMDATE EXPECTED SMAE
IV2RII SOm/s !MOVEMENT
LIVE M N PENETRATIONS AM ALAWEO GREATER
• BALCONIES THAN 60. 0 OR CONDURTS CAST INTO
20 KPa SLABS GREATER IAN St.. 0 W110U1
• STAIRS 4.0 KPa PERMISSION FROM THE NUMBER
FLOORS 30 KP0
IN, SAFE BEARING PRESSURE
100 KPa
GEOTECNEICAL REPORT
• BY
• NUMBER
FOR CONSTRUCTION
Sunshine Coast TITLE PROJECT PROPOSED DATE JANUARY 08 SCALE AS SHOWN SRE Al
WAlAMM 15 COPYRIGHT AND THE PROPERTY OF BARLOWGRUIG ON PIT LTD
IT 1467 NOSE BE E M
RETAINED
BALDWDNEGG YOM PTY LTD
EO COPIED
E D OR USED WITMUT THE AUTHORITY OF
145 IAND AND ITS CONTENTS ARE ELECTRONICALLY GENERATED ARE
BARLOWG REGG 'Af
.41:WW D BIB FORMAL P OH M OLD 4557
F 61 7 5444 0536
TITLE PAGE &
GENERAL NOTES
OFFICE DEVELOPMENT at JBC
MSR
ROVE
CONFENRL AND MAY ONLY BE USED FOR TN PURPOSE FOR WHICH THEY WERE
INTENDED BARLDWDREN VON PTY LTD WILL NOT ACCEPT RESPONSIBILITY FOR ANY
EMPIIPWRMN4FIMp10M (MAN
247 DAVID LOW WAY
CNSEDENES ARISING FROM THE USE OF THE DRAWING FOR OTHER THAN ITS Fraser Coast CHECKED NOW APED k3850 4
ISSUED FOR CONSTRUCTOR E 2001
INTENDED PURPOSE N WHERE THE OAWM HAS BEEN ALTERED AMENDED OR
CHANGED EITHER MANUALLY OR ELECTRONICALLY BY ANY TWO PARTY Consulting Engineers 7 PEREGIAN BEACH for
DRAWING ALEX UPDATED S
15 .7111
14 ACP
MSA D F 6W3
61177441224 6 3655 ASSOCIATED CONSULTANTS PROJECT SHEET NUMBER REVISION
A ISSUED FOR TENDER 1213 2035 All S AN
UNLESS
N
UNIROLED DOCUMENT ISSUED FOR INFORMATION PURPOSES ONLY
TN CHECKED SECTIONS ARE SIGNED DR COMPLETED FIGURED OMENS M
ACN 77 114 957 363 Coral Coast CORE ARCHITECTURE MORGAN & BEIERS ATF
No AMENDMENT DATE BY No AMENDMENT DATE BY
TAKE PRE EDENCE OVER SCALED 00 NOT SCALE REDUCED SIR DRAWINGS VERIFY
DIMENSIONS PRE TO COMMENCING ANY MRXS N FABRICATION FIN RENT ASK
www barlowgreggvdm corn au 1 61 7 AIS2 66SS
F •617 4152 6633 Ph (07) 5444 4511 Fax (07) 5444 4969 MULRANY PROPERTY TRUST 2 BM003087 - 00-01-C
The text continues on page 20.
Used in these records
08/0831 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.