Council archive · source document
08/0831 - Response to Information Request [As Published] · 142008.831
LEGEND
SEDIMENT AND EROSION PLAN SILT FENCE (SEE DETAIL) NOTE ALL SERVICES
Objective/target Comply with all statutory regulations and FILTER TUBE SEDIMENT I TO BE LOCATED
maintain them during construction and the TRAP )SEE DETAIL) I ON SITE RY CONTRACTOR
maintenance period Comply with this erosion
and sediment control plan to control 13 FIELD INLET SEDIMENT TRAP PRIOR TO ANY CONSTRUCTION
erosion and sediment flows
Management Strategy Site foreman to identify and check direction
of storm water land flows as shown on the CONCRETE MASONRY BLOCKS
(150 SERIES)
plan Provide barriers and other measures
shown on the plan to prevent storm water SILT I FENCE FIXED IN ACCORDANCE
flows over embankments and sediments into WITH MANUFACTURERS SPEC TO
catchpits TEMPORARY SITE FENCING
Tasks/Actions Erect sediment barriers at the top of 1 Y
embankments as shown on the drawing
Strategically place check dams around gully I /
pits
FIELD INLET SEDIMENT
Performance Indicators Site foreman to check erosion and sediment
flows at the base of embankments after
TRAP DETAIL N.T S
rain STEEL / TIMBER POST long TO BE SPACED
Check that check dams are working during AT 3 Om MAXIMUM crs EXACT SPACING OF POSTS TO 7
rain periods FIELD INLET SEDIMENT
BE CONFIRMED ON SITE BY SUPERINTENDENT POSTS TRAP REFER DETAIL
Frequency/Deadline Site foreman to monitor performance after TO BE POSITIONED ON DOWNSTREAM SIDE OF FABRIC
every heavy downfall
SILT LOK' FILTER FABRIC (or approved equiv I
Responsible Person/ Site foreman to be responsible for COMPACTED BACKFILL TO TRENCH FILTER TUBE SEDIMENT
Organisation inspections TRAP REFER DETAIL
FLOW 0
Reporting/Review Site workers to advise foreman if they
notice any barrier needing repair
LAY THE TOE-IN FLAP OF FABRIC IN THE
Corrective Actions Site foreman to report and order through BOTTOM OF TRENCH AS SHOWN
supervisor, extra barrier or check dams as
required
EROSION CONTROL DEVICES
THESE DEVICES ARE DESIGNED TO MINIMISE EROSION AT A CONSTRUCTION TYPICAL SILT FENCE
SITE AND CONSEQUENTLY DECREASE DOWNSTREAM SEDIMENT TRANSPORT DETAILS N.T.S
THEY INCLUDE DIVERSION DRAINS SLOPE DRAINS ENERGY DISSIPATERS
AND LEVEL SPREADERS
DIVERSION DRAINS MAY BE FORMED AS A CUT DRAIN BANK OR BERM OR DAVID LOW WAY
A COMBINATION OF BOTH EXTENT OF EARTHWORKS
SLOPE DRAINS ARE GENERALLY STABILISED DRAINS WHICH DISCHARGE TEMPORARY CONSTRUCTION ENTRY/EXIT REFER TO DETAIL ALL
WATER FROM THE END OF A DIVERSION DRAIN DOWN AN EXPOSED SLOPE CONSTRUCTION VEHICLES TO USE THIS ENTRY THE CONTRACTOR
SHALL CONTINUOUSLY MONITOR THE ROAD ADJACENT TO THE SITE
ENERGY DISSIPATERS (EG HAY BALES) MAY BE NECESSARY AT THE FOR ANY SOIL OR OTHER MATERIAL CARRIED OFF THE SITE AND
ENDS OF SLOPE DRAINS IMMEDIATELY REMOVE SUCH MATERIAL
POST B-1 1- POST B END POCKET
LEVEL SPREADERS ARE EXCAVATED OUTLETS CONSTRUCTED AT ZERO
GRADE AT THE END OF DIVERSION DRAINS TO CONVERT CONCENTRATED
FLOW TO SHEET FLOW
JOINING SECTIONS FOR
CONTROL OF THE WIND CARRIAGE OF DUST SILT FENC E N.T.S
TO ENSURE THAT ALL WORKS DO NOT DETRIMENTALLY AFFECT THE AMENITY OF
THE GENERAL NEIGHBOURHOOD AND THE ENVIRONMENT SURROUNDS THE FOLLOWING
MEASURES SHOULD BE ADOPTED GEOTEXTILE FABRIC
BIDUM U34 OR SIMILAR
PROVIDE A WATER TRUCK ON SITE FOR THE DURATION OF THE CONTRACT PERIOD OVERLAP POSTS AS SHOWN TO PREVENT FLOW THROUGH
ALL TOPSOILED AREAS TO BE TREATED BY SURFACE SPRAYING A MINIMUM OF • DRIVE POSTS FIRMLY TOGETHER AND WIRE TIE AT TOP TO
THREE (3) TIMES PER DAY AT MAXIMUM THREE (3) HOUR INTERVALS UNTIL PREVENT SEPARATION OF FENCE
SATISFACTORY GROUND COVER IS ACHIEVED
RUNOFF FROM PAD
SEDIMENT MANAGEMENT DETAILS GEOTEXTILE FILTER TUBE
DIRECTED TO SEDIMENT TRAP
SAND FILLED
1 PROVIDE SILT FENCES AT THE TOE OF ALL FILL BATTERS BELT LOOP TO BE TWISTED
2 PROVIDE CHECK DAMS AT TABLE DRAIN OUTLETS AND WHERE DIRECTED AROUND TOP OF POST TEMPORARY CONSTRUCTION
3 PROVIDE TEMPORARY SILT TRAPS AS DIRECTED FILTER TUBE
4 THE ABOVE SILT MANAGEMENT MEASURES ARE TO BE MAINTAINED UNTIL
ENTRY/EXIT SEDIMENT TRAP
N.T.S NTS
ACCEPTANCE 'OFF MAINTENANCE
5 THE ABOVE SILT MANAGEMENT MEASURES ARE DESIGNED IN ACCORDANCE WITH
SOIL EROSION AND SEDIMENT CONTROL' BY THE IEA AND MAY BE VARIED BY THE
COUNCILS REPRESENTATIVE TO SUIT SITE CONDITIONS
6 TURFING AND SEEDING ARE TO BE CARRIED OUT AS SOON AS PRACTICABLE REFER FENCE TO POST
TO THE SPECIFICATION FOR SEED MIXES AND APPLICATION METHODS
CONNECTION N.T.S
NOTES TITLE PROJECT DATE MARCH 2008
I This is the property of the engineer and may not BARLOW GREGG M OPOIL, SEDIMENT & EROSION CONTROL PROPOSED OFFICE
CONSULTING ENGINEERS
DESKVIED JM
be used copied or reproduced wholly or in part CC
without the express permission of the engineer Raw n Iw 957 365 ACM IN 957!65 PLAN DEVELOPMENT at DAVID LOW DRAWN
SUNSHINE COAST FRASER COAST EMECKED
Infringement in any way may result in legal action 24 Wolan Steel Pane N71401 Mss WAY. PEREGIAN BEACH
IPA 8. 200
0 CROSSOVER AMENDED 27/1/08 JM 2 Figured dimensions take precedence over scaled ASSOCIATED CONSULTANTS PROJECT-SUBSET-SHEET-REVISION
cc
wodnla0a a 45571
CORAL COAST
Phone 117141S2 4655 for MORGAN & BEIERS ATF
A ISSUE FOR OPERATIONAL WORKS APPROVAL 25/3/08 3 Verify all dimensions on site Paine 1071 5444 N80 CORE ARCHITECTS
Nol Amendment Date By Nol Amendment Date By
Poe 10715444 0536
o(0tmOlmlwgi rei
wNnSUINY CDAS2
Ph.. (0714146 6672 Ph (07) 5444 4511 Fax 1071 5444 4969 M3087 - C02 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.