Council archive · source document
08/0831 - Response to Information Request [As Published] · 142008.831
John Robertson From: Stewart Magill [stewart magill@bspgld corn au] Sent: Tuesday, 22 July 2008 1 27 PM To: John Robertson Subject: FW Operational Works application for 247, 249 & 253 David Low Way, Peregian Beach Dear John Progress from Council Regards Stewart Magill BUILDING SURVEYING PROFESSIONALS QLD P/L Mobile: 0434 491 447 Phone. 07 5451-5079 Fax: 07 5443--5273 PO Box 1632, BUDERIM Q 4556 3/12 Aerodrome Road, MAROOCHYDORE Q 4558 u Please consider the environment before printing this e-mail -----Original Message ----- From* Tracy Jones [mailto:[email protected]] Sent. Tuesday, 22 July 2008 1:23 PM To. [email protected] Subject: Operational Works application for 247, 249 & 253 David Low Way, Peregian Beach Stewart Further to my letter of 21 July 2008, the following items require attention by the applicant in order to progress the assessment of this application 1 Please note that three (3) sets of the drawings that are required to be approved for the above Operational Works application are to be duly amended (as required below) and each signed by the consultant Registered Professional Engineer of Queensland (RPEQ). 2. Please provide a plan showing appropriate sight lines as requested in Condition 20 of Council's Decision Notice 2006/2689 dated 1 November 2007 that are in accordance with AS2890 1, sec 3.2.4. Please note that sight lines are to be provided from the property line, not the edge of the footpath. It is recommended that these sight lines be also shown on the Landscape plans. 3. Please provide construction details for the median kerb shown on drawing W-03-01. (Condition 26 of Council's Decision Notice 2006/2689 dated 1 November 2007 refers). 4. Please confirm that "EX/1" is an existing gully pit, not a manhole. Please also show the outlet pipe from that pit (Your plan M3087-CO5 D refers) 5. Please confirm that the proposed stormwater line from "3/2" to "EX/2" will not conflict with Council's existing sewer line 6. Please provide details of pit "3/2". What will prevent stormwater draining to the submersible groundwater pump? Please note that the following items will need to be received by Council before Council can issue a Development Permit for Operational Works. 7. Please show on the appropriate drawings, the existing sewer main and its 'zone of influence', in accordance with of Condition 40 of Council's Decision Notice 2006/2689 dated 1 November 2007. 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.