Council archive · source document
08/0831 - Response to Information Request [As Published] · 142008.831
PF7 PF7 PF7
a.
ISH34) ISH34)
UB28 I l UB28 _.-
Im jm iI Bq^^ / \
1-
CH42 (SH341 Sy''SI CH42 \\\ m
=N
WI a
CH42 4D -
ti Sy'Y3
O
.
CH42 CH42 CH42 (H42 CH42
x
US 0 0
/ \ u
/ LL
\I LL
/ \ M
CH42 CH42 CH42 I \\ i CH42
\ 0/
INDICATES Bmm \ ORJNG "PLATE
*PF3* 4 M16 TO EAC I CCP10
(SH34) I ISH34) pSo
r aA I I
a (p 1
PF7 PF7
L AS ERICKS INDICATES
ME BER CONTINUOUS OVER ^UPPORTS
I
-PARENTHESIS INDICATES
MEMBE^ UNDER MAIN ROOF LINE 0P
ROOF LAYOUT SCHEDULE
BR1 020 BRACING ROD WITH TURNBUCKLES
ROOF FRAMING NOTES P1 Z15012 PURLINS OT 1200 Crs Max
1 ROW OF BRIDGING TO
ALL EXPOSED STEELWORK IS TO BE HOT DIP GALVANISED FIRST LEVEL ROOF FRAMING LAYOUTS 1168 at Al P2
MANUFACTURER S SPECIFICATIONS
Z15012 PURLINS @ 600 Crs
ALL BOLTS TO BE GRADE 8 8 UNLESS NOTED OTHERWISE
REFER TO ARCHITECTURAL SPECIFICATION FOR ALL SET OUT DIMENSIONS FINISHINGS FLASHINGS WATERPROOFINGS ETC I ROW OF BRIDGING TO
ALL CHEMICAL ANCHORS ARE RAMSET CHEMSET INJECTION MANUFACTURER S SPECIFICATIONS
SYSTEM OR ENGINEER APPROVED EQUIVALENT
ALL ANCHORS ARE TO BE STAINLESS STEEL
ALL ANCHORS TO BE INSTALLED IN STRICT ACCORDANCE
WITH MANUFACTURERS SPECIFICATIONS
REFER Dwg No. 00-02 FOR
REFER DRAWING 00-01 FOR FURTHER STEELWORK NOTES STEEL MEMBER SCHEDULE
THE STRUCTURAL DRAWINGS ARE TO BE READ IN
CONJUNCTION WITH THE ARCHITECTURAL DRAWINGS
FOR CONSTRUCTION
T Suoaho, Coast TITLE PROJECT
PROPOSED DATE JANUARY 08 SCALE AS SHOWN SIZE Al
IT RLOW
NO E COPYRIGH
HOT NOT If
ETA000 i AND THE PROPERTY OF BT
B AILOW(AFGG VON l PTY LTD
H
IHMR
COPIED OR USED WITHOUT THE
ER Y O PTY LTD
18 AUTHORITY O
IING AND ITS CONTENTS ARE ELECTRONICALLY GENERATED ARE
BARLOWGREGG LNN 1 181 Braboas Read
PO Box 200 M..IPNlaU OLD 4557
T .61 1 5444 1400
P .61 7 5444 0536
ROOF FRAMING LAYOUTS OFFICE DEVELOPMENT at DESIGNED
DRAWN
JBC
MSR
AND MAY ONLY BE USED FOR THE PURPOSE FOR WHICH THEY WERE
INTENDED BARLOWGREGG VOM PTY LTD WILL NOT ACCEPT RESPONSIBILITY FOR ANY
E barINUM r80NrdrgrNm TN.ON
247 DAVID LOW WAY
CONSEQUENCES ARISING FROM THE USE OF THE DRAWING FOR OTHER THAN ITS Fraser Coast CHECKED NOW PED 3850
INTENDED PURPOSE OR WHERE THE DRAWING HAS BEEN ALTERED AMENDED OR
CHANGED EITHER MANUALLY OR ELECTRONICALLY BY ANY THIRD PARTY Consulting Engineers T .61 7 4121 3855 PEREGIAN BEACH for
F 61 7 4124 U03 ASSOCIATED CONSULTANTS PROJECT SHEET NUMBER REVISION
ISSUED FOR CONSTRUCTION ?S117 2008 M5R
A ISSUED FOR TENDER 1203 2008 ACP S AN UNCONTROLLED DOCUMENT ISSUED FOR INFORMATION PURPOSES ONLY
UNLESS THE CHECKED SECTIONS ARE SIGNED OR COMPLETED FIRMED DIMENSIONS
ACN 77 114 957 363 Coral Coast CORE ARCHITECTURE MORGAN & BEIERS ATF
No AMENDMENT I DATE I BY No AMENDMENT DATE BY
TAKE PRECEDENCE OVER SCALED DO NOT SCALE REDUCED SIZE DRAWINGS VERIF
DIMENSIONS PRIOR TO COMMENCING ANY WORKS Be FABRICATION F IN DOUBT - ASK
www badowgreggvdm com au T .61 7 4152 6655
F 61 7 4152 6633 Ph 107) 5444 4511 Fax (07) 5444 4969 MULRANY PROPERTY TRUST 2 BM003087 - R-01-B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.