2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Shire Council
Phase 4 – 5: Identifying assets of as well as from the community’s viewpoint (as it
can provide recreational, cultural, natural, public
importance and their risks health and economic benefits).
The next stage in the project was to identify Using a range of different criteria based
which important Council, community and natural on Council’s existing approach to asset
assets are expected to be exposed to each of management, and feedback provided by
the hazard scenarios, and then determine what community stakeholders, a database of built
the overall risks are to each. This stage of the assets, infrastructure, and natural areas that are
project was performed in alignment with national considered most important to the community and/
standards for risk assessment. or Council was created. Further information on
the results of this process can be found in the
Identifying areas and assets at risk Locality Risk & Action Plans in Section 5. More
In order to assess the future erosion and descriptions of each of the criteria used can be
inundation risks throughout the Noosa region, it found in the Phase 5 – Risk Assessment Report22.
is necessary to understand which areas and key
assets are presently at risk and which areas may Identifying the level of risks to areas and
become threatened in the future. The 2040, 2070 assets
and 2100 planning horizons are used to assess
A risk management approach has been applied
risk which provides insight into prioritisation of
to assessing risks related to all three coastal
adaptation planning. For instance, an asset which
hazards. The Australian Standard for identifying
is threatened in 2040 may have more urgency,
and managing risks is outlined in AS/NZ ISO
and thus priority, for an adaptation response than
31000:2018 Standard Risk Management
an asset which is not expected to be at high risk
Principles and Guidelines and this guideline has
until 2100. Contrastingly, assets with a long useful
been applied in the risk assessment used in the
life (e.g. buildings and bridges) may require
CHAP’s development.
replacement or retrofitting significantly earlier
than would have otherwise occurred (i.e. in the This risk assessment approach has been
absence of sea level rise) to ensure their safety designed to provide a process to incorporate
and functionality. By prioritising assets, Council improved data and risk knowledge over time. It
is able to commit resources accordingly based provides an important basis for focusing effort
on likely asset life, desired function (including and resources towards those assets or areas at
safety), and vulnerability to coastal hazards. greatest risk from coastal hazards now and in
future (i.e. prioritising high risk areas and assets)
Assets were identified by comparing the hazard
and then determining responses that avoid,
modelling results with existing data on public
mitigate, reduce or accept these risks where
and private asset types and locations across
feasible to an acceptable or tolerable level.
the coastal zone. It’s important to acknowledge
that not all assets require a specific response in It should be noted that many assets for which
this plan. For example, a single barbecue in a a specific risk assessment was not performed
foreshore park is considered an asset, but given can still benefit from adaptation actions taken
its low cost of replacement and relatively short for those assets that were assessed, due to their
life, it is not worth developing a specific response proximity. For example, foreshore works that
for this asset. In contrast, the entire park itself seek to prevent inundation from impacting a park
is considered important, both from Council’s will also benefit the barbeque and playground
perspective (as it owns and manages that asset), facilities within the park.
22
BMT, 2020. Noosa Shire Council – Coastal Hazard Adaptation Plan Risk Assessment
Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.