Original source · versioned page text
2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Shire Council
However, the impacts of frequent tidal inundation of low-lying areas (particularly the parks, road
reserves and some private properties around the Noosa River) require further management action
overtime. Some riverside areas are already affected by infrequent events such as catchment
flooding and storm tide inundation. The relatively long periods of time between events allow for
clean-up, recovery and repairs to be undertaken, and normal activities to resume unimpeded.
However, activities and assets in these areas are unlikely to cope with impacts caused by frequent
tidal inundation. As sea levels rise, some low-lying areas will be regularly covered with shallow sea
water. In the absence of any adaptation response, this inundation will likely restrict access to roads,
footpaths and recreational areas and cause nuisance to residents, business owners and visitors.
The cost benefit analysis of coastal inundation risks8 assessed that a number of adaptation options
are likely to be both suitable and feasible for responding to the risks associated with frequent tidal
inundation in Noosa’s coastal zone. These include:
• Continuing existing measures for responding to risks of catchment flooding and storm tide
inundation;
• Protecting buried infrastructure (stormwater and sewerage assets) through installation of
innovative technologies;
• Reducing the frequency of inundation to roads, pathways, parks and business areas through
the creation of adaptive landscape measures. This includes low rise levies (see Factsheet #1)
and landscaped walls along some foreshore edges, elevated footpaths and improvements to
drainage;
• Ensuring asset plans and upgrades appropriately consider inundation risks.
Fact sheets for these adaptation measures can be found on the project page on Your Say Noosa.
8
Aither, 2020. Noosa Shire Council CHAP – Phase 7, Noosaville Cost Benefit Analysis
Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.