2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnadaptation pathway for responding to frequent inundation risks in this locality is one that supports
existing accessibility services, visual amenity values and natural ecological processes. Therefore,
the preferred adaptation outcomes are:
- The increased inundation risk to service infrastructure assetsCoastal
Noosa is accommodated through
Hazards Adaptation Plan
adaptive design.
Figure 16 shows the expected progression of these preferred outcomes between 2020 and 2100.
Pathways Map Legend
Table 14. provides a breakdown of actions in support ofTrigger
these outcomes, to be pursued within the
points (points in time for when a decision needs to be made)
five year life of this plan. Commencement or future commencement of adaptation option
Active action on this adaptation pathway
Effectiveness of this option may be reduced and require reassessment
Figure 16 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosa North Shore
Figure 16 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosa North Shore
The following actions will help progress the achievement of these outcomes:
The following actions will help progress the achievement of these outcomes:
MANAGEMENT
MANAGEMENT ACTIONSACTIONS FOR NOOSA
FOR NOOSA NORTHNORTH
SHORESHORE
– THE AND
NEXTTEEWAH –
5 YEARS
RESPONSE
RESPONSE THE NEXT 5 YEARS
AREA
AREA
Land
LandUse
Use Maintain
Maintainland use
land planning
use approach
planning and
approach ensure
and alignment
alignment with State
with State Planning
Planning
Planning
Planning Policy
Policy.
Public
Public Ensure road
Ensure asset
road plans
asset and
plans upgrades
and upgradesonon
Noosa North
Noosa Shore
North appropriately
Shore appropriately
recreational,
recreational, consider periodic tidal inundation risks
consider periodic tidal inundation risks
built,
built,and
and Investigate opportunities for maintaining functional road access to ferry landing
Infrastructure Investigate opportunities for maintaining functional road access to ferry
Infrastructure area
assets landing area
assets
Foreshores and Review and update Council’s Conservation Land Guideline that supports
Natural Areas environmental land acquisition, to ensure the risks to Noosa’s biodiversity
assets from periodic tidal inundation are appropriately considered
Noosa Council – Coastal Hazards Adaptation Plan Page 53
Other Liaise with Local Disaster Management Group to ensure emergency response
planning for the rural fire brigade asset on the Homeport Track appropriately
considers increasing inundation risks in that area
Work with Unitywater to commence investigation of options for reducing
inundation risks to residential wastewater systems, including alternatives to on-
site septic treatment/holding tanks.
Table 14 - Five year action plan for responding to projected coastal inundation risks in Noosa North Shore
Other shire-wide actions are also identified at the beginning of this Section 5.
Page 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.