Skip to the record
Accept no substitutions.

Original source · versioned page text

2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
adaptation pathway for responding to frequent inundation risks in this locality is one that supports
existing accessibility services, visual amenity values and natural ecological processes. Therefore,
the preferred adaptation outcomes are:

     -   The increased inundation risk to service infrastructure assetsCoastal
                                                              Noosa     is accommodated through
                                                                               Hazards Adaptation Plan
         adaptive design.


Figure 16 shows the expected progression of these preferred outcomes between 2020 and 2100.
                                                Pathways Map Legend
Table 14. provides a breakdown of actions in support ofTrigger
                                                          these     outcomes, to be pursued within the
                                                                points (points in time for when a decision needs to be made)
five year life of this plan.                             Commencement or future commencement of adaptation option
                                                                      Active action on this adaptation pathway
                                                                   	Effectiveness of this option may be reduced and require reassessment




Figure 16 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosa North Shore
Figure 16 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosa North Shore


The following actions will help progress the achievement of these outcomes:
The following actions will help progress the achievement of these outcomes:

  MANAGEMENT
  MANAGEMENT               ACTIONSACTIONS FOR NOOSA
                                   FOR NOOSA  NORTHNORTH
                                                     SHORESHORE
                                                             – THE AND
                                                                   NEXTTEEWAH –
                                                                        5 YEARS
   RESPONSE
  RESPONSE                                      THE NEXT 5 YEARS
     AREA
  AREA
 Land
 LandUse
       Use              Maintain
                          Maintainland use
                                    land   planning
                                         use        approach
                                             planning        and
                                                      approach   ensure
                                                               and      alignment
                                                                   alignment      with State
                                                                             with State      Planning
                                                                                        Planning
 Planning
 Planning               Policy
                          Policy.

 Public
  Public                Ensure road
                          Ensure    asset
                                 road      plans
                                       asset      and
                                              plans   upgrades
                                                     and upgradesonon
                                                                    Noosa North
                                                                      Noosa     Shore
                                                                            North     appropriately
                                                                                  Shore appropriately
 recreational,
  recreational,         consider periodic tidal inundation risks
                          consider periodic tidal inundation risks
 built,
  built,and
         and            Investigate opportunities for maintaining functional road access to ferry landing
 Infrastructure           Investigate opportunities for maintaining functional road access to ferry
  Infrastructure        area
 assets                   landing area
  assets
 Foreshores and         Review and update Council’s Conservation Land Guideline that supports
 Natural Areas          environmental land acquisition, to ensure the risks to Noosa’s biodiversity
                        assets from periodic tidal inundation are appropriately considered
Noosa Council – Coastal Hazards Adaptation Plan                                                                                Page 53


 Other                  Liaise with Local Disaster Management Group to ensure emergency response
                        planning for the rural fire brigade asset on the Homeport Track appropriately
                        considers increasing inundation risks in that area
                        Work with Unitywater to commence investigation of options for reducing
                        inundation risks to residential wastewater systems, including alternatives to on-
                        site septic treatment/holding tanks.

Table 14 - Five year action plan for responding to projected coastal inundation risks in Noosa North Shore


Other shire-wide actions are also identified at the beginning of this Section 5.


                                                                                                                                    Page 59
Log in to download the original file

2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan(PDF, 11MB).pdf · 11.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.