Original source · versioned page text
2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Install signage for increasing beach user understanding of importance of
healthy dune systems along the Noosa Spit
Liaise with beachfront asset owners to ensure their natural disaster
Other Noosa Coastal Hazards Adaptation Plan
management plans are mitigating erosion event risks where possible
Table 16 - Five-year action plan for responding to projected coastal erosion risks in Noosa Heads
Other shire-wide actions are also identified at the beginning of this Section 5.
Inundation risks to Noosa Heads
Inundation due to storm tide and increases in tidal extents present risks to public assets throughout
the planning horizon
Inundation risksoftothis plan.
Noosa In the present day, areas and assets at risk due to storm tide include
Heads
low-lying parks, road networks and buried infrastructure (e.g. stormwater networks), and natural
Inundation due to storm tide and increases in tidal extents present risks to public assets throughout
areas within Noosa Spit.
the planning horizon of this plan. In the present day, areas and assets at risk due to storm tide
includetidal
Permanent low-lying parks, exposes
inundation road networks
manyandof buried infrastructure
the same (e.g.
assets that arestormwater
subject tonetworks), and
the effects of storm
natural areas within Noosa Spit.
tide inundation, however, these events are lesser in area and depth, albeit on a much more regular
basis.Permanent
It is this regularity that results
tidal inundation exposes in permanent
many of the tidal
sameinundation
assets thatrepresenting
are subject to athe
significant
effects of risk to
somestorm
assets tide inundation,
within Noosahowever, these events
Heads. These assetsare lessernatural
include in area and
and depth, albeit on
recreational a much more
foreshore assets
regular basis. It is this regularity that results in permanent tidal inundation representing
along the river-side of Noosa Spit, Lions Park, as well as road and other network infrastructure along a significant
risk to some assets within Noosa Heads. These assets include natural and recreational foreshore
Noosa Parade and Noosa Drive.
assets along the river-side of Noosa Spit, Lions Park, as well as road and other network
infrastructure
A small number ofalong Noosa
private Parade and
commercial andNoosa Drive.
tourism assets at the Hastings Street end of Noosa Drive
are expected to be exposed by 2100. Other private assets along Noosa Parade and Noosa Drive are
A small number of private commercial and tourism assets at the Hastings Street end of Noosa
not considered at high risk
Drive are expected to befrom inundation
exposed due
by 2100. to elevated
Other land and
private assets alongbuilding floor heights
Noosa Parade as a result
and Noosa
Drive are not considered at high risk from inundation due to elevated land and building floor
of planning controls in place through successive planning schemes.
heights as a result of planning controls in place through successive planning schemes.
Asset Type Tidal Inundation Risks by Year
Present Day 2040 2070 2100
Tourism Low Very High
Business Low Very High
Residential Low
Infrastructure Low High Very High
Recreational37 Low Medium Very High
Natural Low
Table 17 - Change in Noosa Heads asset inundation risk profiles across planning horizons
Table 17 - Change in Noosa Heads asset inundation risk profiles across planning horizons
At present, the only method for mitigating inundation risks in Noosa Heads is:
At present, the only method for mitigating inundation risks in Noosa Heads is:
- Planning and land use regulations are in place for new development including minimum
- Planning
floorand landfor
heights use regulations
new buildings are in place for new development including minimum floor
heights for new buildings
Inundation
Inundation adaptation
adaptation outcomesand
outcomes and associated
associatedactions for for
actions Noosa Heads
Noosa Heads
The assessment of inundation risks across Noosa Heads shows the level of risk to some tourism,
business, recreational and infrastructure assets is projected to become intolerable in the later
decades of the century.
37
This result is due to risks to ‘Dog Beach’ and surrounds. Lions Park was rated medium risk by 2100.
Given a range of socio-economic, environmental, and governance considerations, as well as
Noosa Council – Coastal Hazards Adaptation Plan Page 65
community feedback during the development of this plan, determine the most appropriate adaptation
pathway for responding to frequent inundation risks in this locality is one that supports existing
accessibility and infrastructure services, as well as current levels of residential, commercial and retail
development. In response to these risks, the preferred adaptation outcomes are:
37
This result is due to risks to ‘Dog Beach’ and surrounds. Lions Park was rated medium risk by 2100.
Page 63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.