2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                   Install signage for increasing beach user understanding of importance of
                                   healthy dune systems along the Noosa Spit
                                   Liaise with beachfront asset owners to ensure their natural disaster
          Other                                                           Noosa Coastal Hazards Adaptation Plan
                                   management plans are mitigating erosion event risks where possible
                      Table 16 - Five-year action plan for responding to projected coastal erosion risks in Noosa Heads

         Other shire-wide actions are also identified at the beginning of this Section 5.
Inundation risks to Noosa Heads
Inundation due to storm tide and increases in tidal extents present risks to public assets throughout
the planning  horizon
      Inundation  risksoftothis plan.
                            Noosa     In the present day, areas and assets at risk due to storm tide include
                                   Heads
low-lying parks, road networks and buried infrastructure (e.g. stormwater networks), and natural
      Inundation due to storm tide and increases in tidal extents present risks to public assets throughout
areas within Noosa Spit.
    the planning horizon of this plan. In the present day, areas and assets at risk due to storm tide
    includetidal
Permanent    low-lying parks, exposes
                 inundation   road networks
                                        manyandof buried infrastructure
                                                  the same              (e.g.
                                                              assets that  arestormwater
                                                                                subject tonetworks), and
                                                                                           the effects of storm
    natural areas within Noosa Spit.
tide inundation, however, these events are lesser in area and depth, albeit on a much more regular
basis.Permanent
         It is this regularity     that results
                       tidal inundation   exposes in permanent
                                                      many of the tidal
                                                                   sameinundation
                                                                          assets thatrepresenting
                                                                                       are subject to athe
                                                                                                         significant
                                                                                                           effects of risk to
somestorm
        assets  tide inundation,
                   within   Noosahowever,       these events
                                      Heads. These      assetsare   lessernatural
                                                                 include   in area and
                                                                                    and depth, albeit on
                                                                                        recreational      a much more
                                                                                                        foreshore   assets
       regular    basis.  It is this regularity  that results in permanent   tidal inundation representing
along the river-side of Noosa Spit, Lions Park, as well as road and other network infrastructure along        a significant
       risk to some assets within Noosa Heads. These assets include natural and recreational foreshore
Noosa Parade and Noosa Drive.
    assets along the river-side of Noosa Spit, Lions Park, as well as road and other network
    infrastructure
A small number ofalong  Noosa
                   private      Parade and
                            commercial  andNoosa    Drive.
                                              tourism  assets at the Hastings Street end of Noosa Drive
are expected to be exposed by 2100. Other private assets along Noosa Parade and Noosa Drive are
      A small number of private commercial and tourism assets at the Hastings Street end of Noosa
not considered   at high risk
      Drive are expected  to befrom  inundation
                                 exposed        due
                                          by 2100.   to elevated
                                                   Other           land and
                                                         private assets alongbuilding floor heights
                                                                              Noosa Parade          as a result
                                                                                             and Noosa
      Drive are not considered at high risk from inundation due to elevated land and building floor
of planning  controls  in place   through successive   planning   schemes.
         heights as a result of planning controls in place through successive planning schemes.

                     Asset Type                         Tidal Inundation Risks by Year
                                          Present Day              2040                2070               2100
                     Tourism                                       Low                                  Very High
                     Business                                       Low                                 Very High
                     Residential                                              Low
                     Infrastructure                       Low                          High             Very High
                     Recreational37             Low              Medium                       Very High
                     Natural                                                  Low
                         Table 17 - Change in Noosa Heads asset inundation risk profiles across planning horizons
                    Table 17 - Change in Noosa Heads asset inundation risk profiles across planning horizons

         At present, the only method for mitigating inundation risks in Noosa Heads is:
At present, the only method for mitigating inundation risks in Noosa Heads is:
               -   Planning and land use regulations are in place for new development including minimum
       -	Planning
               floorand  landfor
                     heights   use regulations
                                 new buildings are in place for new development including minimum floor
          heights for new buildings

    Inundation
Inundation     adaptation
           adaptation     outcomesand
                        outcomes   and associated
                                       associatedactions for for
                                                   actions    Noosa Heads
                                                                 Noosa Heads
The assessment of inundation risks across Noosa Heads shows the level of risk to some tourism,
business, recreational and infrastructure assets is projected to become intolerable in the later
decades of the century.
         37
              This result is due to risks to ‘Dog Beach’ and surrounds. Lions Park was rated medium risk by 2100.
Given a range of socio-economic, environmental, and governance considerations, as well as
     Noosa Council – Coastal Hazards Adaptation Plan                                        Page 65
community feedback during the development of this plan, determine the most appropriate adaptation
pathway for responding to frequent inundation risks in this locality is one that supports existing
accessibility and infrastructure services, as well as current levels of residential, commercial and retail
development. In response to these risks, the preferred adaptation outcomes are:




37
     This result is due to risks to ‘Dog Beach’ and surrounds. Lions Park was rated medium risk by 2100.

                                                                                                                          Page 63
Log in to download the original file

2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan(PDF, 11MB).pdf · 11.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.