Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
           Noosa Shire Council



  Figure 19 shows the expected progression of these preferred outcomes between 2020 and 2100.
  Table 20 provides a breakdown of actions in support of these outcomes, to be pursued within the
  five-year life of this plan.
  Figure 19 shows the expected progression of these preferred outcomes between 2020 and 2100.
                                                 Pathways Map Legend
  Table 20 provides a breakdown of actions in support of Trigger
                                                           these    outcomes,
                                                                 points                 towhen
                                                                        (points in time for be apursued      within
                                                                                                 decision needs        the
                                                                                                                to be made)
  five-year life of this plan.                            Commencement or future commencement of adaptation option
                                                                       Active action on this adaptation pathway
                                                                    	Effectiveness of this option may be reduced and require reassessment




        Figure 19 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosaville
        Figure 19 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosaville

  The following actions will help progress the achievement of these outcomes:

   MANAGEMENT                ACTIONS FOR NOOSAVILLE – THE NEXT 5 YEARS
   RESPONSE
   AREA

   Land Use                  Maintain land use planning approach and alignment with State Planning
   Planning                  Policy.

                             Investigate a range of backflow prevention methods and technology for parts
                             of the stormwater network identified as vulnerable

                             Investigate location, scale and design of adaptive landscape structures (e.g.
   Public                    non-intrusive levees, innovative design features for garden beds, public
   recreational,             furniture, park design and raised foreshore footpaths38) to prevent frequent,
   built, and                shallow and low flow tidal inundation of parks and road corridors
   Infrastructure
   assets                    Investigate road corridor designs that are more resilient to frequent wet/dry
                             scenarios and incorporate into asset renewal plans where appropriate

                             Ensure road asset plans and upgrades for Lake Weyba Drive appropriately
                             consider inundation risks

Page 68

  38
       Depending on the location requirements, these may range in height up to 300mm in the case of raised
Log in to download the original file

2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan(PDF, 11MB).pdf · 11.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.