2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            Noosa Shire Council


  Adaptation outcomes and associated actions
  Adaptation outcomes and associated actions
   The assessment of inundation risks to these localities show the level of risk to most asset type is
   acceptable,
  The  assessment  withoftheinundation
                              exceptionrisks
                                          of risks  to natural
                                               to these        areas
                                                         localities     expected
                                                                    shows              to become
                                                                               the level    of risk tointolerable
                                                                                                            most assetbytype     2070.is
  acceptable, with the exception of risks to natural areas expected to become intolerable by 2070.
   Analysis of socio-economic, environmental, and governance considerations, as well as community
  Analysis    of socio-economic,
   input, indicate                     environmental,
                      the most appropriate              and pathway
                                                adaptation    governance        considerations,
                                                                          for responding                  as well asrisks
                                                                                                   to inundation          community
                                                                                                                                 in this
  input,  indicate   the  most   appropriate    adaptation   pathway    for   responding          to
   locality is one that seeks the continuing provision of key infrastructure services over the medium-inundation       risks   in  this to
   long-term.
  locality       As that
            is one   a result,
                          seeksthethepreferred
                                       continuingadaptation
                                                    provisionoutcome      40  for this locality
                                                               of key infrastructure          services is: over the medium- to
  long-term. As a result, the preferred adaptation outcome42 for this locality is:
       - Service
  - Service            infrastructure
               infrastructure    assetsassets    accommodate
                                         accommodate               the increase
                                                           the increase               in inundation
                                                                             in inundation                   risk through
                                                                                                   risk through       adaptive    adaptive
                                                                                                                                     design
             design
  Figure 21 shows the expected progression of these preferred outcomes between 2020 and 2100.
   Figure2421provides
  Table         shows the     expected progression
                          a breakdown     of actions inof these preferred outcomes between 2020 and 2100.
                                                               Pathways Map Legend
   Table 24ofprovides
  support                  a breakdown
                 these outcomes,      to beofpursued
                                               actions in support of Trigger
                                                                         thesepoints
                                                                                  outcomes,          to be pursued within the
                                                                                     (points in time for when a decision needs to be made)
   five-year
  within  the life of thislife
               five-year     plan.
                               of this plan.                            Commencement or future commencement of adaptation option
                                                                              Active action on this adaptation pathway
                                                                           	Effectiveness of this option may be reduced and require reassessment




         Figure 21 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Cooroibah,
        Figure 21 - Preferred long-term adaptation pathway response
                                               Cootharaba,          to projected
                                                           Como & Boreen    Point coastal inundation risks in Cooroibah,
                                              Cootharaba, Como & Boreen Point

  Thefollowing
  The followingactions
                actionswill
                        willhelp
                             helpprogress
                                  progressthe
                                           theachievement
                                               achievementofofthese
                                                               theseoutcomes:
                                                                     outcomes:

       MANAGEMENT
       MANAGEMENT               ACTIONS FOR THESE LOCALITIES
                                              ACTIONS        – THE
                                                      FOR THESE    NEXT 5 YEARS
                                                                LOCALITIES –
       RESPONSE
        RESPONSE                                                     THE NEXT 5 YEARS
       AREA
          AREA

   Land Use
   Land  Use                  Maintain
                             Maintain   land
                                      land   use
                                           use   planning
                                               planning   approach
                                                        approach   and
                                                                 and    alignment
                                                                     alignment    with
                                                                               with    State
                                                                                    State    Planning
                                                                                          Planning Policy
   Planning
   Planning                   Policy

   Public
    PublicAssets
            Assetsand
                   and Investigate a range
                         Investigate        of of
                                      a range  backflow  prevention
                                                  backflow           methods
                                                            prevention       and
                                                                       methods   technology
                                                                               and          forfor
                                                                                    technology
   Infrastructure
    Infrastructure     stormwater  network  assets  identified as vulnerable
                         stormwater network assets identified as vulnerable

   Foreshores
   Foreshoresand
               and           NoNo
                                actions proposed
                                  actions proposed
   Natural
   NaturalAreas
           Areas
   Other
   Other                     NoNo
                                actions proposed
                                  actions proposed
  Table 24 - Five-year action plan for responding to projected coastal inundation risks in Cooroibah, Cootharaba,
   Table 24 - Five- year action plan for responding to projected coastal inundation risks in Cooroibah, Cootharaba, Como &
  Como & Boreen Point                                     Boreen Point

  Other
  Other shire-wide
        shire-wideactions
                   actionsare
                           arealso
                               alsoidentified
                                    identifiedatatthe
                                                   thebeginning
                                                       beginningofofthis
                                                                     thisSection
                                                                          Section5.5.

  40
  42    Therisk
       The   risktoto natural
                    natural   assets
                            assets     in this
                                   in this     locality
                                           locality       willaddressed
                                                    will be    be addressed   via Shire-wide
                                                                        via Shire-wide       adaptation
                                                                                       adaptation        outcomes
                                                                                                  outcomes
  Noosa Council – Coastal Hazards Adaptation Plan                                                                                      Page 75
Page 74
Log in to download the original file

2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan(PDF, 11MB).pdf · 11.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.