2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Coastal Hazards Adaptation Plan
To support the objectives of the CHAP, the following monitoring activities are to commence within five
years of adoption of this plan by Council:
• Monitoring of tide levels within the Noosa River (already commenced);
• Perform seasonal monitoring of shorelines, as well as annual monitoring of dune shape and
extent, as well as vegetative cover in open coast locations using innovative drone-based
technology;
• Monitoring any impacts of intrusion of the stormwater network by tidal waters, including
expression of these waters beyond inflow points, within Noosa Heads, Noosaville, and
Tewantin;
• Investigate methods for increasing the contribution to monitoring projects via ‘citizen science’
programs (e.g. CoastSnap44)
Council will continue to enhance its program of monitoring local conditions and Noosa-specific data
collection to improve our understanding of current and future coastal hazards, and inform future
adaptation responses in partnership with the Queensland Government, research agencies, CSIRO
and the Bureau of Meteorology (BOM) where able.
Financial Sustainability
Council has a responsibility to ensure that it has sufficient resources now and into the future to
provide levels of service that are both affordable and at a level considered appropriate by the
community. A key objective of adaptation planning is to avoid reactive measures where they
may result in adverse financial implications to Council and the community that are more onerous
compared to carefully considered, well planned intervention measures. The CHAP, as well as related
information, shall be used to support the following objectives of Council’s Financial Sustainability
Policy 2019:
• Council operates in an efficient and effective manner, minimising general rate increases;
• Appropriate collection of cash funds for ongoing infrastructure and asset replacement and
renewal;
• Future trunk infrastructure financial obligations can be met;
• Informed decisions are made on discretionary new operating or capital investment proposals;
• Infrastructure and assets are maintained to required service levels.
Where exposure to intolerable coastal hazard risks exists, Council will also ensure that operational
and strategic decisions with a period of effect that overlaps with future periods of intolerable risk
(e.g. such as in the case of an asset with a long-life expectancy) give adequate consideration to
minimising the exposure of future councils to potential financial risk. In addition, revisions to the
10-year financial plan and the annual budget process should consider achieving the adaptation
outcomes identified in the CHAP, where the implementation of the outcome occurs within the relevant
planning period.
44
Example: http://www.wrl.unsw.edu.au/research/coastsnap
Page 77
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.