Council archive · source document
OPW16-0020 information request · OPW16/0020
Attached to the e-mail OPW16/0020 Council email to applicant with Information Request attached.msg.
OPW16/0020 Information Required 2 Demonstrate whether any design amendment is possible to limit necessary excavations to be shallower than 2m below the existing ground level, and therefore avoid the identified medium acid sulphate soil risks. Issue Specific Outcome O6 of the Water Sensitive Design Code requires that: Run-off that leaves the site is treated so as not to adversely impact on the ecology and hydrology of downstream environmental flows. And Specific Outcome O22 of the Natural Hazards and Natural Resources Overlay Code outlines that: Works do not disturb acid sulfate soils or are managed to avoid the release of acid or associated metal contaminants Common metal contaminants released from oxidation of Acid Sulfate Soil via drawdown from dewatering are Iron and Aluminium. Table 3.4.1 of the ANZECC guidelines outlines that in order to protect 80% of aquatic species, Aluminium and Iron should not be able to be detected in the receiving waters. The application outlines that waters will continually need to be pumped until such time as the house is properly settled. There is no indication of the maximum depth of excavation for foundations and pipework , the depth groundwater’s will need to be pumped, or how far the cone of depression of the groundwater drawdown will extend. This information is necessary to determine the full extent where oxidation and therefore new metal release into ground water is possible. There is no information regarding the existing concentration of metals in the groundwater from previous acid sulphate soil disturbance and whether there is an associated possibility for release of those metal contaminants, existing or potential, from groundwater into the receiving waters. Additionally, there is no detail provided whether there will be continual dewatering along bedding material surrounding pipework after pumping for settlement of the house ceases. Information Required 3 Provide longitudinal section plans showing the maximum depth of excavations needed in relation to the medium risk acid sulphate soil horizon and groundwater fluctuation zone and detail the expected cone of depression. 4 Detail management measures to prevent any continual dewatering via the bedding material surrounding the house and pipework. 5 Demonstrate how the development will not increase oxidation of Potential Acid Sulfate soils within the expected cone of depression via dewatering for house settlement, or continual dewaters due to bedding material surrounding the building and pipework. 6 Demonstrate how there will be no release of metals within groundwater that will affect Aquatic Ecosystem Environmental Values in the receiving waters. Issue The Acid Sulfate Soil Investigation by Core Consultants recommends for an Acid Sulfate Soils Management Plan. Page 2 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16-0020 information request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34 KB (small file)
- File type
No other editions are linked here.