Attachment 8 - Bushfire Management Plan

Attached to the e-mail Response to Information Request - RAL18/0023.

of 14

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
               UPDATED

    BUSHFIRE MANAGEMENT PLAN
FOR UNDEVELOPED AREA OF NOOSA CIVIC

                 FOR

 STOCKWELL DEVELOPMENT GROUP PTY
               LTD




                  by

  L.S. Hawkes, B.Sc.(For), MIFA, MRFAQ
     The Consultancy Bureau Pty Ltd
                April 2019
Log in to download the original file

Attachment 8 - Bushfire Management Plan.pdf · 4.7 MB (large file)

The download may take up to a minute.

Full text of the other 13 pages

Page 2

Report on Updated Bushfire Management Plan for                                           Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic




                                                       Table of Contents


1.       Introduction.................................................................................................................. 1
2.       History ......................................................................................................................... 1
3.       Description of the Site ................................................................................................. 2
4.       Bushfire Hazard and Risk Analysis ............................................................................. 3
5.       Mitigating Actions for Compliance with Bushfire Overlay............................................. 4
     5.1     Access .................................................................................................................... 4

     5.2     Bushfire Buffers / Firebreaks .................................................................................. 4

     5.3     Water ...................................................................................................................... 4

     5.4     Vegetation Management ......................................................................................... 5

       5.4.1       Internal ............................................................................................................. 5

       5.4.2       External ............................................................................................................ 5

6.       Compliance with Natural Hazards Overlay Code ........................................................ 5
     6.1     Overall Outcomes ................................................................................................... 5

     6.2     Specific Outcomes .................................................................................................. 5

7.       Conclusion................................................................................................................... 6




     19-001 Updated Report – April 2019                                                           Commercial-in-Confidence

Page 3

Report on Updated Bushfire Management Plan for            Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic


1. Introduction
The Noosa Civic site (total area 72.76ha) has enjoyed three completed stages of
development. This development has included commercial, industrial and residential
components. This has been largely in the north and west of the site. (see Aerial
Photograph No. 1)


The original Master Plan identified large areas of ecological significance which has been
quarantined by Council Park/Open Space or Environmental Covenant. (see Aerial
Photograph No. 1)


The next stages of development include the clearing of all the nodes of expansion. (see
Clearing Plan)


The entire area has enjoyed previous Bushfire Management Plans and this is an update of
these previous plans and bushfire assessments.




2. History
Prior to 2003 the site had been partially cleared and enjoyed a range of uses. In 2003 an
unplanned bushfire burnt the entire site. (Refer to Photographs in 2004 Bushfire
Management Plan) There has been no burning, planned or unplanned, on the site since
2003.


The development to date has effectively eliminated the bushfire hazard from the north and
west.




  19-001 Updated Report – April 2019                            Commercial-in-Confidence
                                                                                 Page 1

Page 4

Report on Updated Bushfire Management Plan for               Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic


3. Description of the Site
There are (5) development nodes proposed in this application. (see Developable Area
Plan) The entire precinct is gently sloping towards Eenie Creek.


These areas have a range of exposures to bushfire risk as follows:-


Area 1
Small cleared area (0.34ha) with no bushfire implications.


Area 2
Small area (<2ha) with cleared transmission easement separating the adjoining National
Park.


This area, once cleared for development, has some minor risk from the east and north.


Area 3
Small area (0.8ha) mostly cleared and with no bushfire implications.


Area 4
Large area to be cleared except environmental covenant strip along Walter Hay Drive and
against the existing shopping centre.


There is exposure to hazard and risks to the south west and south from adjoining retained
Council Park.


Area 5
Small area (1.3ha) with minor exposure to retained watercourse covenant along narrow
eastern edge. There are no bushfire implications for this node.


Overall, the proposed development removes the existing risks associated with the
adjoining Noosa Civic Shopping Centre.




  19-001 Updated Report – April 2019                               Commercial-in-Confidence
                                                                                    Page 2

Page 5

Report on Updated Bushfire Management Plan for             Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic


4. Bushfire Hazard and Risk Analysis
The State Planning Policy Bushfire Hazard Mapping (SPP) places the development area in
high and very high hazard. (see SPP Map)


Onsite inspection and assessment confirms the following:-
   1. With the development of the (5) nodes the only hazardous vegetation will be the
        small areas of environmental covenants. These are too small and linear to be
        considered a risk to the development or surrounds. (see Potential Hazard Map
        after Development)
   2. The Open Space/Park lands to the south of the development is high hazard and
        with considerable fuel loads. This land burnt in 2003 and will burn again unless the
        fuel loads are managed.
   3. The lands to the east are National Park and high hazard areas. These lands will
        burn from time to time. It is possible for some minor ember attack to reach the
        proposed development but this can be addressed under construction requirements.
        The presence of Walter Hay Drive is a major separation for most of the site from the
        eastern National Park. Area 2 has some exposure but enjoys the power line
        clearing and only a narrow and small area of National park to the north.


The proposed development includes the clearing of internal vegetation with the retention of
environment covenants. (see Clearing Plan)


The connection of Hofmann Drive to Walter Hay Drive improves access and provides
protection for the internal development north of Hofmann Drive.


Overall, the risk of a damaging bushfire threatening the nodes of development is restricted
to the external vegetation south and south west of the development. (see Aerial
Photograph No. 1)




  19-001 Updated Report – April 2019                              Commercial-in-Confidence
                                                                                   Page 3

Page 6

Report on Updated Bushfire Management Plan for                Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic


5. Mitigating Actions for Compliance with Bushfire Overlay
5.1 Access
The link of Hofmann Drive to Walter Hay Drive provides a major improvement for
emergency access to the site.


5.2 Bushfire Buffers / Firebreaks
       Walter Hay Drive provides a substantial buffer from the National Park to the east.
       The power line buffer against Area 2 provides an adequate protection for this small
        unit.
       The power line clearing extends out to Eenie Creek Road and isolates the small
        area of National Park north of Area 2. It would be prudent for some fuel load
        management in this area depending on the style of development in this area.
       The zone adjoining the Council Park at Lots 12 – 15 requires a 20m buffer from
        development. This land will be cleared and will be used for car parks and access.
        No building can be constructed in this area. (see Bushfire Buffer Plan) The
        southernmost section of Lot 12 adjoins the environmental covenant area.


The immediate 20 metres in this environmental covenant will be managed with the
following actions:-
       All weeds will be removed.
       All understorey up to 6m in height will be removed and the ground fuels maintained
        at <8 tonnes/ha by physical means.
       This will be the responsibility of the owner of Lot 12.


5.3 Water
The entire estate will have reticulated water with appropriate fire hydrants.


Lots 12 – 15 will each have a fire hydrant with a hose and reel along the outer boundary of
each lot adjoining the park land.




  19-001 Updated Report – April 2019                                Commercial-in-Confidence
                                                                                     Page 4

Page 7

Report on Updated Bushfire Management Plan for                  Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic


5.4 Vegetation Management
5.4.1 Internal
The fuel loads of the environmental covenants should be monitored and managed to <8
tonne/ha. This can be achieved by mechanical means or where attached to larger
adjoining park it may be achieved by hazard reduction burning.


5.4.2 External
       The patch of vegetation north of Area 2 in the National Park should be considered
        for a cooperative hazard reduction burn with National Parks. This would only be
        needed on a once in 10 year cycle.
       The entire Park area south to Eenie Creek should also have management that
        would include hazard reduction burning.



6. Compliance with Natural Hazards Overlay Code
    (13.28 of the Noosa Plan)
6.1 Overall Outcomes
       The previously approved development provided actions that had minimal ecological
        impact, allowed a safe environment for people and property and sufficient capacity
        for bushfire response if required.
       This final development will provide extensively improved bushfire safety for the
        existing developments and the new areas.


6.2 Specific Outcomes
13.33–04                                The proposed use does not compromise the safety of
(General)                                people or property from bushfire. The detailed set of
                                         mitigating actions provides for a very safe environment
                                        Complies
13.34-07/013                            The provision of separation buffers of up to 20 metres
(Siting, Design and                      from adjoining vegetation along with the capacity to
Construction)                            construct all building to a construction standard under
                                         AS3959 has been demonstrated.
                                        Complies




  19-001 Updated Report – April 2019                                  Commercial-in-Confidence
                                                                                       Page 5

Page 8

Report on Updated Bushfire Management Plan for                  Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic


13.35-08                                The provision of fire hydrants with hose and reel on Lot
(Water)                                  12-15 exclusively for firefighting confirms a strong
                                         response capacity for firefighting appliances.
                                        The entire site has a reticulated water supply with
                                         appropriate fire hydrants.
                                        Complies
13.36-09                                The proposed network of vehicular roads is adequate
(Vehicle Access and Fire                 for emergency vehicles.
Trails)                                 Complies
13.37-010                               The development nodes when cleared will be low
(Reconfiguring a Lot)                    bushfire risk areas and enhance the overall safety for
                                         the entire development.
                                        Complies




7. Conclusion
The proposed extension of the previously approved development will materially improve
the bushfire safety for the entire precinct.


The SPP Hazard Mapping confirms the need for a set of mitigating actions to ensure the
safety of people and property.


The details in section four of this Bushfire Management Plan confirm the capacity to
comply with the current Noosa Plan Natural Hazards Overlay Code.




L.S. Hawkes, B.Sc.(For), MIFA, MRFAQ
Senior Associate
(CV attached)




  19-001 Updated Report – April 2019                                  Commercial-in-Confidence
                                                                                       Page 6

Page 9

Vertical | Panorama | Terrain | Roadmap
Street Maps C] Properties [1

Aerial Photograph No. 1
4/11/2018

— Original Property Boundary
@) Reserved Park/Open Space
@® Mejor Development Nodes
@) Environmental Covenants

 

Page 10

 

 

 

 

 

 

 

 

 

 

 

, 0 norwoa'skeasnsyq mam, / ‘a}iu ‘aulysg OSOON :4}1J0U}NY 10907 ‘
60 seere aoNadaa3uINyld vor eee ooeeoad ° “youn yo AyuNoD, OIIIABSOON “SIAID BSOON 6O'OIEZEO UOId s!9U0s4 79 }JaUUEag
OOOV : | fanedaunsst GOL “Ul]UDMA| $O YS!IOd of WO Pa|!dWWOD UO!}0WW4OJU] 1NO}UOD,
| ee eevon vo 98 eeub0 re mudi oda soon 28
“buy uno, ‘buiddoy te aie ubisap wo.y peyiduu 1y09)

61 /VO/4 SOSREPED ous! gunnduoy “MudorBoring ‘buntoning vasgreds vo ¢ 301 Biguecin pq Ald dnoig uses snore) oleae

of f. 7 ‘ 9afqns ay} Jo salsopuno,
MN a ae o Se HI hd SpoUuBsy  }euueg puo ‘¢ # | 307] Ul S}uaWasog *|2—| S}07 JUBWUdO|aA9q |]EM4901S 40 puny yoalqns our J Puncg

6102/%0/E ayo Hus unosa| 3° NOISIAIGSNS G3SOdOud qwatig

 

 

       

RPIG0983

J
550

1
450

1
400

    

            

        

 

   

    

 

 

3 Vv
oO
i =3 8
ny
= Io gs Re
a] we So, R
: %
Eig RF =
a yy & ~
12 , a} &
8 . aS
&
18 v 9 x
o |* G 3 g gs
8 ag 28 g KY
tds <8 88 & y
a |? € 3 ss
o & Sa SS > ‘SI
3 lo ~ ; = aes
is gs aS
eg o§ X
48 Se 3 6
i _ 3
qe q : 8 ~ so
4 MN §> oe N a2 © o
a ug +8 ’ mit >
a Ss &8 a8 £23
° ga 8 Fes
: ta QO EN o ©
@y 3 sgh 20%
sh N oon
re os 3 &
—. 6?
‘£12044 PUo }}9vU0g 8
pansasas 5) 461 WY 6IOE a

€ | | ;

Jo] us|

 

 

 

 

Page 11

 

z

 

EMTU
SP182880

Se

     

  
    

   
     
 

EMTE
oy SP167978
ey, Na 712245 eur BO AD
RP844425
Cov! No, 602533554 147
SP182845 NPWEB9

No. 710227518

~%  SP182880

Lae No. 710227520

lease
Cov.K No. 710981233
SP182845

 
 
   
  

RPIN7294
No. 602533547

 
    
   
  

  
   
   
    
     
    

SPIB2B45
No. 710227518

RP2IS9B3 | P46 762

3

   

RPI60983
s
v. ;
Total Site Area — 31.73 ho (Lot 3 on SP246584) Cowl 2
SPIBZB45 §
Qeveloped Area ~ 1.2662 ho No. 710227518 gy
nt Are
Covenont l— 0.5254 he
Covenant J - 1.3000 ha 3
Covenant K - 0.2000 ha SPIEZE4S
Covenant L - 0.3466 ha ' SP182845
zu Ace
Areo | =~ 0.3375 ho ~ inclusive of sewearage Emt. 710227520 (4m *)
Area 2 ~ 2.6104 ho ~ inclusive of: A aewnped'A
~ Electricity Transmission Emt. 602533547 (6699m *) ud veloped Area
~ Water Supply Emt. 602533554 (19m *) a
= Drainage Emt. 710212346 (618m *) | Developable Areo
Area 3- 0.7919 ha .
Areo 4 — 13,0432 ha | Environmental Covenanant
Area 5 — 12891 ha es
Area 6 - 0.0197 ho
TOTAL — Disha
09 40 80 160 240 320 400

 

Developable Area Plan

 

Page 12

        Date: 12/02/2019
                                           State Planning Policy
                                         Making or amending a local planning instrument
                                        and designating land for community infrastructure
     Department of State


                                           ¢
                                                                     0           140                                  280                 420                  560

Development, Manufacturing,                     Disclaimer:                                                          Metres
 Infrastructure and Planning
                                                This map has been prepared with due care based on the best available information at the time of publication. However, the State of Queensland
                                                (acting through the department) makes no representations, either express or implied, that the map is free from errors, inconsistencies or
                                                omissions. Reliance on information contained in this map is the sole responsibility of the user. The State disclaims responsibility for any loss,
      © The State of Queensland 2019.           damage or inconvenience caused as a result of reliance on information or data contained in this map.

Page 13

  
  
  
 
 
  
  

 

Legend
Cadastre (10k)

| Cadastre (10k)

 

Bushfire prone area
| Very High Potential Bushfire Intensity
| High Potential Bushfire Intensity
Medium Potential Bushfire Intensity

Potential Impact Buffer

 

   

    

SSD Z 2044

 

Hazard Map Following the
Proposed Development

   
    

 

   

a
bate: 42169018 State Planning Policy
ate: Making or amending a focal planning instrument
and designating land for community infrastructure
Department of State 0 140 280 420 560
. a SS
Development, Manufacturing, Disclaimer: Metres
* This map has been prepared with due care based on the best available information at the time of publication. However, the State of Queensiand
infrastructure and Plannin 9g (acting through the department) makes no representations, either express or implied, that ihe map is free from errors, inconsistencies or
omissions. Reliance on information contained in this mé the sole respor lity of the user. The State disclaims responsibility for any loss,
Graremenant @ The State of Ousensiand 7019, Anmane nr inranvaniancs raiiead ae areal nf rekance nn infommalinn a data contained i this mao,

 

 

Page 14

 

 

 

 

 

 

DIAGRAM A

DI

 

Scale 1:2000 — Lengths are in Metres.
Lote L 1 1 1 L 1 L L 1 1 1 1 1 J
20 oO 20 40 60 80 100 120 140 160 180 200 220 240 260 280

 
 

 

034389.09

[Pian Ref.

 

Scale 1:2000

      
    
  

Cov. J (inc. Covenant of

SPIG2B45 ® 1658m2) P
‘. LY } ¢ EMT AJ
is YA 1524 me

Proposed

 

 

 

 

Covenant AE
3260 m2?
lw
s
oon Cov. x
PB sriszess Q
cP ee.
SP2B5856, e% EMT AK
L516 m2
| f Proposed
* Covenant AD
__.Proposed 389 m2
| Covenant AC
4 485 m2
Gg ae
les broposed
x r eC.
| al “ovenant AB
732 m2? DIAGRAM B
Scale 1:2000
5 %
SP222982 Proposed
Covenant AA
998 m2 &
A Bushfire Buffer Plan

 
       
  
 
   
 
   
    

   

 

wv
¥ @® 20m Cleared
@> Retained Vegetation

SPIB2845

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.