Original source · versioned page text
Attachment 8 - Bushfire Management Plan
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
Date: 12/02/2019
State Planning Policy
Making or amending a local planning instrument
and designating land for community infrastructure
Department of State
¢
0 140 280 420 560
Development, Manufacturing, Disclaimer: Metres
Infrastructure and Planning
This map has been prepared with due care based on the best available information at the time of publication. However, the State of Queensland
(acting through the department) makes no representations, either express or implied, that the map is free from errors, inconsistencies or
omissions. Reliance on information contained in this map is the sole responsibility of the user. The State disclaims responsibility for any loss,
© The State of Queensland 2019. damage or inconvenience caused as a result of reliance on information or data contained in this map.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.