Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Attachment C_R.B23636.001.02.SEMP_final_lowres

of 172

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (26.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

In the deployed state, further support for the transducer and pole was provide by a wood
block inserted between the Z-Pole and the vessel hull, and a ratchet strap extended around
the lower part of the Z-Pole and then tightened to secure all components to the vessel.




              Figure 9: Deployment and securing of Edgetech 6205 on pole to vessel.




11                            Noosa Council - Noosa River Survey                      20.06.2019
Log in to download the original file

Attachment C_R.B23636.001.02.SEMP_final_lowres.pdf · 26.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.