Original source · versioned page text
Attachment C_R.B23636.001.02.SEMP_final_lowres
Very large file (26.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
In the deployed state, further support for the transducer and pole was provide by a wood
block inserted between the Z-Pole and the vessel hull, and a ratchet strap extended around
the lower part of the Z-Pole and then tightened to secure all components to the vessel.
Figure 9: Deployment and securing of Edgetech 6205 on pole to vessel.
11 Noosa Council - Noosa River Survey 20.06.2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.