Original source · versioned page text
Attachment C_R.B23636.001.02.SEMP_final_lowres
Very large file (26.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa Spit SEMP Final Report v
Contents
Figure 4-1 Example of a Trigger-Based Coastal Management Strategy (Barnes et al.
2017) 64
Figure 4-2 Option 1a: sand plug at either end of Dog Beach 76
Figure 4-3 Peak Flood Currents, Option 1a: sand plug at either end of Dog Beach 77
Figure 4-4 Peak Ebb Currents, Option 1a: sand plug at either end of Dog Beach 78
Figure 4-5 Option 1b: sand plug at southern end of Dog Beach 80
Figure 4-6 Peak Flood Currents, Option 1b: sand plug at southern end of Dog Beach 81
Figure 4-7 Peak Ebb Currents, Option 1b: sand plug at southern end of Dog Beach 82
Figure 4-8 Option 2: extension of the existing training wall at Dog Beach 84
Figure 4-9 Peak Flood Currents, Option 2: extension of existing groyne 85
Figure 4-10 Peak Ebb Currents, Option 2: extension of existing groyne 86
Figure 4-11 Option 3: extension of submerged breakwater and two new groynes 88
Figure 4-12 Peak Flood Currents, Option 3: extension of existing submerged breakwater
and two new groynes 89
Figure 4-13 Peak Ebb Currents, Option 3: extension of existing submerged breakwater
and two new groynes 90
Figure 4-14 Option 4: three new groynes 92
Figure 4-15 Peak Flood Currents, Option 4: three new groynes 93
Figure 4-16 Peak Ebb Currents, Option 4: three new groynes 94
Figure 4-17 Option 5: shore parallel seawall 96
Figure 5-1 Actions along the Risk Continuum (adapted from Fisk & Kay 2010) 98
Figure 5-2 Trigger Zones for Dog Beach Shoreline Management 101
List of Tables
Table 2-1 Summary of Noosa River Mouth Channel Position 7
Table 2-2 Noosa Spit Width Measurements 18
Table 4-1 Summary of Management Options and Option Type 64
Table 4-2 Rapid Assessment Criteria 66
Table 4-3 Rapid Assessment of Options Results 67
Table 4-4 MCA Categories, Weightings and Scoring Descriptors Developed with the
PCG 73
Table 4-5 Summary of MCA Results Developed with the PCG 74
Table 5-1 Key Stages and Triggers for Proposed Management Actions 100
Table 5-2 Approval Considerations for Shoreline Erosion Management Actions 102
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.