Original source · versioned page text
Attachment C_R.B23636.001.02.SEMP_final_lowres
Very large file (26.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa Spit SEMP Final Report 69
Shoreline Erosion Mitigation Options
Community Acceptability
Planning & Consultation
Environmental or Social
Score (Go = 1, Slow = 0,
Effectiveness over time
Reversible / Adaptable
Legal / Approval Risk
Treats Erosion Issue
Maintains Foreshore
Technical Viability
Recommended
Inundation Issue
Maintains Beach
Recurrent Costs
Treats Oceanic
Option Option Type Asset Type &/or
Capital Cost
Other Comments
Stop = -1)
Amenity
Habitat
Impact
Protect - Regional Management Options
Stage 1 of the strategy was The Stage 1 training wall
Full implemented and included is performing as
construction of the training wall at
Implementation the western end of Dog Beach and S S S S S S S
intended however the
submerged structure
of Strategy submerged structure. t t l l l l l G
✓ 1/2 ✓ -1 has been damaged by
Proposed by o o o o o o o o
propeller strike and is
Stage 2 of the strategy involves a p p w w w w w
Sunshine Coast significant extension of the slumping. Scour is
Council submerged structure and addition of evident at both
two small groynes. structures.
The existing groyne
allows sand bypassing
and development of the
Extend existing structure to intercept southern spit (north of
Existing Groyne sand and reduce bypassing of the S S S S S S S Dog Beach) which
Extension at groyne into the river mouth. t t l l t t l G
1/2 -3 influences the entrance
Southern River o o o o o o o o channel alignment.
This option would potentially benefit p p w w p p w
Mouth operation of the sand shifter. Uncertainty whether a
reduced rate of
bypassing would benefit
Dog Beach.
The new structure is
intended to intercept
sand and reduce
S S S S S S S S development of the
New Groyne at New structure to intercept sand and northern spit which
t t l l t t t l
Northern side of reduce season transport into the 1/2
o o o o o o o o -5 influences the entrance
River Mouth river mouth from North Shore channel alignment.
p p w w p p p w
Uncertainty whether
these works would
benefit Dog Beach.
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.