Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment C_R.B23636.001.02.SEMP_final_lowres

of 172

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (26.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Noosa Spit SEMP Final Report                                                                                                                            74
Shoreline Erosion Mitigation Options

                                                      Table 4-5        Summary of MCA Results Developed with the PCG

                                               Effectiveness         Whole of Life     Environmental    Social Benefits        Risk
                                                                       Costs              Values                                            Overall Score
                                              (30% weighting)      (20% weighting)    (15% weighting)   (10% weighting)   (25% weighting)
Option 1a – Sand plug at either end of
                                                    100%                   50%              50%             100%              100%              83%
Dog Beach and shoreline nourishment
Option 1b – Sand plug at the southern
end of Dog Beach and shoreline                       75%                   25%              25%              75%               75%              58%
nourishment
Option 2 – Extension of the existing
training wall/groyne at western end of               75%                   75%              50%              50%               75%              69%
Dog Beach
Option 3 – Extension of submerged
                                                     25%                   75%              50%               0%                0%              30%
breakwater and two new groynes
Option 4 – Three new short groynes at
                                                     50%                   100%             50%              50%               75%              66%
Dog Beach
Option 5 – Shore parallel seawall                   100%                   25%              25%              25%               75%              60%
Option 6 – Do nothing                                0%                    100%             25%               0%                0%              24%




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

Attachment C_R.B23636.001.02.SEMP_final_lowres.pdf · 26.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.