Noosa Spit SEMP Final Report 79
Shoreline Erosion Mitigation Options
4.3.2 Option 1b: sand plug at southern end of Dog Beach
Figure 4-5 illustrates the model representation of the sand plug as the southern end of Dog Beach.
Like Option 1a, it’s assumed a small cutter suction dredge and slurry pipeline would be used to
relocate the sand from a nearby borrow area within the Noosa River estuary. Key features of the
option include:
• The sand plug is represented by adjusting the model bathymetry in the areas shown
• The crest elevation of the sand plug is 0 mAHD (approximately mean sea level)
• The estimated volume of sand needed to construct the plug is 17,000 m3 (additional volume would
be required to nourish the shoreline).
The impacts to peak tidal current figures show:
• Very little change to peak flood current magnitude within the Dog Beach channel. Increases to
current magnitude are predicted at the edges and over the crest of the sand plug. As described
above for Option 1a, this suggests that the flood tide currents will gradually erode and smooth the
constructed sand plug.
• The pattern of impact to ebb tide currents is like Option 1a, with a significant reduction in
magnitude at the Dog Beach channel and shoreline. Option 1a and 1b are similar in terms of the
immediate benefit to Dog Beach erosion associated with ebb tide currents, but with less sand
required to implement Option 1b.
• An increase in ebb tide current magnitude through the central channel is observed, assumed to
promote the development of a dominant ebb tide flow path through this area.
• It is assumed that the sand plug would need to be maintained for the option to continue performing
as intended. In comparison to Option 1a, the single sand plug at the southern end of Dog Beach
may need to be reinstated at more regular intervals, potentially offsetting the benefit of the
reduced sand volume needed for construction.
The whole of life cost estimate for this option is $4.1M with annualised costs around $200,000/year.
This estimate assumes five campaigns between 2020 and 2040. Each campaign would seek to
relocate up to 50,000 m3 of sand.
Like Option 1a, the potential for impact to environmental values is primarily related to the extractive
dredging activities and disturbance to the estuarine habitats with opportunities to enhance terrestrial
environmental values through revegetation and dune management programs to help stabilise the
nourishment material. The increased frequency of dredging activities (i.e. more regular disturbance)
is the reason Option 1b receives a lower score in comparison to Option 1a. The increased frequency
of disturbance is also the reason for the lower score with respect to social benefits and risks to
Council. Full details of the risk assessment results are provided in Appendix D.
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.