Original source · versioned page text
20210817 Pearsons Rd, Arborist Report 2
3. Inspection Results 3.5 Site Map Figure D, Cut & Fill plan, shows the trees within the waterway corridor have a bio retention basin, cut/fill, a swale drain as well as a footpath/bikeway affecting them. There are significant changes in the hydrology in this area as well as the diversion of surface water to the existing creek. A storm water line and outlet are also shown on the STORMWATER CATCHMENT PLAN 160-001-400, which intersects many of the waterway corridor trees outside of the cut/fill area. It appears as though a stand of Paperbarks can be retained to the east of the bioretention basin outside of the swale area. The remaining allotment has been cleared of vegetation which inturn would put additional stress on the taller upper canopy species within the waterway corridor. The Swamp Mahoganys would be the most affected by the exposure. Cut and or fill works within their SRZ (structural Root Zone) would see these upper-canopy species become a high risk rating classification to the surrounding residential properties as well as the future proposed properties. Arborist report – TSA: BAX-Pearsons Rd Cooroy Treesafe Australia Pty Ltd. August 2021© P a g e 6 | 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.