Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GENERAL NOTES
To be read in conjunction with all drawings; refer to                           GLAZING                                                                                                                          SMOKE ALARMS                                                                                                                                    DRAWING LIST
consultants drawings and specifications for co-ordination of                    All glazing to be designed and installed in accordance with                                                                      All smoke alarms to be installed in accordance with AS3786.
services and extent of works.                                                   AS2047 and AS1288. Manufacturer to provide certification                                                                         Smoke alarms in the dwelling must:                                                          SHEET NAME                                          SHEET NUMBER     ISSUE DATE       REVISION
                                                                                on completion.                                                                                                                   1. Be photoelectric (AS3786-2014); and
STRUCTURAL DETAILS                                                                                                                                                                                               2. Not also contain an ionisation sensor; and                                         Cover                                                     WD.1.01         21.12.2021    C
Refer to Consulting Engineer's drawings for all structural                      WATER CLOSETS                                                                                                                    3. Be hardwired to the mains power supply with a secondary                            General Notes                                             WD.1.02         21.12.2021    C
details.                                                                        The doors to sanitary compartments must be readily                                                                               power source (i.e. battery); and
                                                                                removable from outside the compartment.                                                                                          4. Be interconnected with every other smoke alarm in the                              Site Plan                                                 WD.2.01         21.12.2021    C
DIMENSIONS                                                                                                                                                                                                       dwelling                                                                              Understorey Park                                          WD.2.02         21.12.2021    C
Do not scale from drawings. Given dimensions are to have                        WC's to have a minimum clearance of 900mm.
priority over scaled dimensions.                                                                                                                                                                                 Smoke alarms must be installed on each storey:                                        GF Overall Plan                                           WD.2.03.1       21.12.2021    C
                                                                                All toilet systems to be dual flush.                                                                                             1. In each bedroom; and                                                               GF Dimension Plan                                         WD.2.03.2       21.12.2021    C
CONSTRUCTION                                                                                                                                                                                                     2. In hallways which connect bedrooms and the rest of the
All design, construction and materials to be in accordance                      SHOWERS                                                                                                                          dwelling; or                                                                          Level 1 Plan                                              WD.2.04         21.12.2021    C
with:                                                                           AAA shower roses to be supplied in accordance with QDC.                                                                          3. If there is no hallway, between the bedroom and other                              Slab Plan                                                 WD.2.05         21.12.2021    C
Australian Standards;                                                                                                                                                                                            parts of the storey; and
National Construction Code (NCC);                                               WET AREAS                                                                                                                        4. If there are no bedrooms on a storey at least one smoke                            Roof Plan                                                 WD.2.06         21.12.2021    C
Queensland Development Code (QDC);                                              Wet areas are to be waterproofed in accordance with                                                                              alarm must be installed in the most likely path of travel to exit                     Landscaping Plan                                          WD.2.07         21.12.2021    C
Building Regulations;                                                           AS3740 and the requirements of the NCC. Floor tiles and                                                                          the dwelling.
Manufacturers specifications and installation details for                       floor waste to all wet areas. Floors to fall to floor waste at a                                                                                                                                                       Elevations                                                WD.3.01         21.12.2021    C
materials used.                                                                 grade of 1 in 60. All timber walls to wet areas to be lined with                                                                 Prescribed locations for installing smoke alarms, where                               Elevations                                                WD.3.02         21.12.2021    C
                                                                                a waterproof cladding.                                                                                                           practicable, must be placed on the ceiling. Smoke alarms
SETOUT                                                                                                                                                                                                           must not be placed:                                                                   Sections                                                  WD.4.01         21.12.2021    C
Contractor/builder to confirm all dimensions, levels,                           BRACING AND TIE DOWNS                                                                                                            1. Within 300mm of a corner of a ceiling and a wall;                                  Sections                                                  WD.4.02         21.12.2021    C
boundary lines and pegs on site prior to commencement of                        Provide bracing and tie down to timber framing in                                                                                2. Within 300mm of a light fitting;
any work.                                                                       accordance with AS1170.2 and the Engineer's drawings.                                                                            3. Within 400mm of an air conditioning vent;
                                                                                                                                                                                                                                                                                                       Details                                                   WD.5.01         21.12.2021    C
                                                                                                                                                                                                                 4. Within 400mm of the blades of a ceiling fan.                                       Schedules                                                 WD.6.01         21.12.2021    C
Should site conditions differ from those indicated seek                         STORM WATER DRAINAGE
instructions from the Designer.                                                 Storm water drainage management system to be in                                                                                  There are special requirements for stairways, sloping ceilings
                                                                                                                                                                                                                                                                                                       3D Perspectives                                           WD.7.01         21.12.2021    C
                                                                                accordance with AS/NZS 3500.3.2. Surface drainage to                                                                             and ceilings with exposed beams. Specific requirements will                           Visualisations                                            WD.7.02         21.12.2021    C
DRAINAGE                                                                        discharge evenly within the site and without nuisance to the                                                                     be explained in the Building Fire Safety Regulation 2008.
Adequate site drainage should be installed to ensure that
                                                                                                                                                                                                                                                                                                       Visualisations                                            WD.7.03         21.12.2021    C
                                                                                adjoining properties.
natural runoff is directed away from the proposed
walls and footings. Subsurface drainage must be installed                       SEWERAGE DRAINAGE
behind retaining walls to prevent development of                                Sewerage drainage to be in accordance with the local
hydrostatic pressure.                                                           authority requirements.

EROSION AND SEDIMENT CONTROL                                                    DAMP PROOF COURSE
Provide erosion and sediment control structures to perimeter                    A damp proof course must be provided in accordance with
of work area and maintain in a functional condition as                          AS2870.
required by the local authority.
                                                                                LIGHTING
BUILDING PLATFORM                                                               Artificial lighting must be provided in accordance with
Platform immediately surrounding the building is to fall away                   AS1680.
from from the building at a minimum slope of 1 in 20.
                                                                                Energy efficient lighting must be 80% min of the total fixed
CUT AND FILL                                                                    artificial lighting as per QDC.
Cut and fill batters not to exceed a maximum slope of 1 in 1.
                                                                                WATER SYSTEMS
TERMITE PROTECTION                                                              Hot water, warm water and cooling water systems must be
Termite protection to be provided in accordance with AS3660                     installed in accordance with AS/NZS3666.1.
with a method to the satisfaction of the Building Certifier.
                                                                                Solar hot water system, gas hot water system or heat pump
ROOF SHEETING                                                                   must be supplied in accordance with QDC.
Roof sheeting to be installed in accordance with AS1562.1
and the manufacturers specification for the relevant wind                       STAIRS AND BALUSTRADES
classification applicable to the site.                                          Stair construction is to comply with NCC part 3.9.1.3 and
                                                                                3.9.1.4.
STEELWORK
All steelwork fittings and fixtures shall be hot dipped                         Balustrade positioned min. 865mm above nosing of treads.
galvanised.                                                                     1000mm minimum above balcony, landing of the like.

ROOF TRUSSES                                                                    Opening in balustrades to be constructed so a 125mm
Timber roof trusses to be designed and constructed to the                       sphere is not permited to pass throught and for a stair the
relevant wind category.                                                         space tested is above the nosing.

TIMBER                                                                          Balustrades to comply with NCC part 3.9.2.2 and 3.9.2.3.
All workmanship and materials shall be in accordance with
AS1684.2 and Engineer's details.                                                SWIMMING POOL
                                                                                Swimming pool fences to comply with the requirements of
Store timber 150mm minimum clear of ground, evenly                              the NCC part 3.9.3 (Swimming Pool Access).
supported, well ventilated and protected.
                                                                                Swimming pool fences must be 1200mm minimun height
Use timbers with durability class and preservative treatment                    clearance between bottom of fence and finish floor level of
suited to intended application as outlined in AS1684.2.                         deck must not exceed more than 100mm.




                                                                                                                                                                                                                                                                                                                                                                                                                    21/12/2021 11:16:20 PM
                                                                                Swimming pool gates must swing outwards from the pool
                                                                                area.
                                                                      For engineering information, Engineer's drawings and information shall take precedence over architectural drawings.                    164 Edwards Street,                                                 Date:        Rev:   Issue:                                                      Scale:     Title:                     Date:
                                                                                                                                                                                            Client Project




                                                                      The Building Designer's drawings and recommendations shall take precedence over architectural drawings. The
                                                                                                                                                                                                                                                                    Amendments




                                                                                                                                                                                                                                                                                 06.08.2021    A     Working Drawings                                             1 : 10    General Notes              21.12.2021
                                                                                                                                                                                                             Sunshine Beach




                                                                                                                                                                                                                                                                                                                                                   Job Details
                                                                      author is to be notified immediately, should any errors, discrepancies, or conflict become apparent and prior to
                                                          Copyright




                                                                                                                                                                                                                                                                                 05.10.2021    B     Outdoor Area Roof & Landscape Plan
                                                                      proceeding with the works.
                                                                      Copyright: The design content shown on this drawing remains the property of Garland Design and is provided only                                                                                            21.12.2021    C     Revised Working Drawings in Response to RFI
                                                                                                                                                                                                                                                                                                     MCU21/0192                                                  Des:  JC   Project #:   Drawing #: Issue:
                                                                      for the use described. This drawing may not be copied, altered, have sections omitted, erased or changed in any
                                                                      way without the prior written approval of Garland Design.                                                                              Adam Flanagan & Shane Tye                                                                                                                           Check:JC   21.107       WD.1.02       C
Log in to download the original file

Att 1 Revised Plans.pdf · 3.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.