Council archive · source document
Modification to alternative siting provisions - 07/0674 - 7 Stormbird Pl [As Published] · 132007.674
INTEGRATED PLANNING ACT 1997 SEQ Regional Plan For more information refer to schedule 2 of the (P Regulation. . Refer to Chapter 2, part 5A and schedule 10 of the Integrated Planning Act 1997, and schedule 2 of the Regulatory Provisions for relevant definitions, : Unless you answered “none of the above" to Q20, the application requires assessment by the Office of Urban Management-(OUM). Fisheries matters For more information refer to schedule 2of the IP Regulation. Unless you answered “none of the above" to Q21, the application requires assessment by the Department of Primary Industries and Fisheries (DPI&F), If an agency other than DPI8F is the assessment manager for the application, DPI&F is a concurrence agency for the application in relation to items (i) - (iv) and an advice agency in relation to item (v). _ IDAS Assessment Checklist, Version 20, 2 Aprit 2007 20. The application involves (tick applicable box/es) - : C1 (i) amateriat change of use of premises — “ (a) in a Major Development Area in the Urban Footprint for - OO (i) anurban activity - (1 inan area included in a structure plan where the IPA, section 3.1.6 applies; (1 inan area not included in a structure plan where - ¢ the IPA, section 3.1.6 applies to the application for the material change of use; or « the premises exceeds 10,000m2: or « the gross floor area (GFA) on the premises will exceed 10,000m2; or + impact assessment is required under the relevant planning scheme LJ (i) intensive animal husbandry, or 0 (ii) residential development involving a rural residential purpose (b) in the Regional Landscape and Rural Production Area for - 0 (i) anurban activity and not specified in section 2.4(2); or 4 1 (i) residential development involving a rural residential purpose and not specified in section 2.6(2) (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2); (d) in the Investigation Area for - OO (i) an urban activity and not specified in section 2.10(2); QO (ii) residential development involving a rural residential purpose and not specified in section 2.12(2); or CO (iii) intensive animal husbandry LO (ii) reconfiguring a lot- On land in a Major Development Area in the Urban Footprint that is: (a) not included in a structure plan; and (b) not specified in section 3.1(2), C1 (iii) none of the above 21. The application involves: (tick the applicable box/es) (i) anassessable material change of use for aquaculture - complete Part O: of Form 1; L1 (ii) assessable operational work that is the construction or raising of a waterway barrier - complete Part O3 of Form 1; Ci(iil) assessable operational work completely or partly within a declared fish habitat area- complete Part O2 of Form 1; C1 (iv) assessable operational work that is the removal, destruction or damage of a marine plant - complete Part O2 of Form 1; (1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a declared fish habitat area; (vi) none of the above. Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Modification to alternative siting provisions - 07/0674 - 7 Stormbird Pl [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.