Council archive · source document
Modification to alternative siting provisions - 07/0674 - 7 Stormbird Pl [As Published] · 132007.674
INTEGRATED PLANNING ACT 1997 - IDAS Assessment Checklist, Version 20, 2 April 2007 State-controlied road matters 2. The application involves: (tick applicable box/es) For more information refer to Guide 3. C1) development on land contiguous’ to a State controlled road and for - Untess you answered “none of the above” to Q2, the application triggers referral to the Department (J (a) material change of use assessable against the planning scheme; of Main Roads (DMR) as a referral agency. Cb} (b) reconfiguring alot unless - In certain circumstances OMR will be an advit : agency, while in olherciroumstances DMR Ma « the total number of lots is not increased; and ; : be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased; Sener 20 he FF Regulation wil assist you to C1 (c) operational work (not associated with a material change of use assessable against the concurrence agency-for the application. planning scheme or reconfiguring a lot mentioned in (b) above)— associated with access to a State-controlled road; or + for filing or excavation; or + involving the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a State-controlled road. . (1 (ii) development on land not contiguous to a State-controlled road and - C (a) material change of use ~ * assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation guring a and exceeding the thresholds set by that schedule; a (2 (c) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) above)— » assessable against the local government's planning scheme; and’ « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule. iii none of the above Clearing vegetation 3. The application involves: (tick applicable boxes) . pp ip! For more information refer to Guide 12. . QO (i) material change of use - Unless you answered “none of the above” to Q3, . _ . ‘ the application requires assessment by the (a) assessable against the planning scheme; Department of Natural Resources and Water ining — RR ee Resources ani ater ; (b) on a lot containing 7 if an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or manager for the application, NRWisa « ifthere is no property map of assessable vegetation for the lot - remnant vegetation; fotismater for the application in relation (c)_ where the existing use of the land is a rural or environmental use; and Ifyou ticked Q3(i} oF (i, your application requires (d)_ where the size of the land is 2 hectares or larger - complete Part J of Form 1 ‘eferral to NRW for assessment regardless of | (ii) reconfiguring a lot - , “whether vegetation clearing is proposed or not. a ‘ (a)_ on alot containing a category 1, 2 or 3 area shown on a property map of assessable vegetation or, if there is no property map of assessable vegetation for the lot, remnant vegetation; (b), where the size of the lot before the reconfiguration is 2 hectares or larger; (c) where 2 or more lots are created; and _ (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 (1 (iii) operational work - (a) for the clearing of native vegetation where the vegetation Clearing is 5 made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of Form 4 . [33 (iv) none of the above. Strategic port land 4. The application involves: For more information refer to Guide 11. If you ticked (i) - the relevant Port Authority is the assessment manager for the application, Hf you ticked (ii} Queensland Transport is a concurrence agency for the application. (1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI Act) - complete Part f of Form 1 C1 (ii) a material change of use that is inconsistent with the land use plan approved under the TI Act for the strategic Port land - complete Part | of Form 1 iii) none of the above ~ 4 Land contiguous to a State-controlled foad is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road: or that is part of a future State- controtled road. . Page2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Modification to alternative siting provisions - 07/0674 - 7 Stormbird Pl [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.