Approved Plans RAL22-0016 & OPW22-0180

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                 N
                                                                                                                                                                                                                                                                                                                                                                                                                                        EARTHWORKS NOTES
                                                                                                                                                                                                                                                                                                                                                                                                                                        1.    FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR TO
                                                                                                                                                                                                                                                                                                                                                                                                                                              COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
                                                                                                                                                                                                                                                                                                                                                                                                                                        2.    IT IS RECOMMENDED THAT A GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE SOIL
                                                                                                                                                                                                                                                                                                                                                                                                                                              CONDITIONS PRIOR TO CONSTRUCTION COMMENCING.
                                                                                                                                                                                                                                                                                                                                                                                                                                        3.    GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM OVER THE EXTENT OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                              WORKS UNLESS DIRECTED OTHERWISE AND STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING




                                                                                                                                                                           rant
                                                                                                                                     24.70                                                                                                                                                                                                                                                                                                    AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.
                                                                                                                                                      24.79
                                                                                                                                                                                                                                                                                                                                                                                                                                        4.    UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT MATERIALS ENCOUNTERED




                                                                                                                                                                        Hyd
                                                                                                                                                                                                                                                                                                                                                                                                                                              SHOULD BE REMOVED DURING SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE
                                                                                                                                                                                                                                                                                                                                                                                                                                              MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.




                                                                                                                                                                   Fire
                                                                                                  24.68                                                                                                                                                                                                                                                                                                                                 5.    COMPACTION OF EXPOSED SAND SUBGRADE MAY REQUIRES SUBSTANTIAL VOLUMES OF WATER COMBINED
                                                                                                  Sewer Manhole                                                                                                                                                                                                                                                                                                                               WITH VIBRATORY COMPACTION EQUIPMENT(E.G VIBRATING PLATE OR MINIMUM 4 TONNE VIBRATING
                                                                                                                                                                                  25.46
                                                                                                                                                                   25.41
                                                                                                                                                                                                                                                         102°C21
                                                                                                                                                                                                                                                              B                                                 41                                                                                                                            SMOOTH DRUM ROLLER).
                                                                                                                                                                                   25
                                                                                                                                                                                     .77                                                                     02'00"                                           RP139776
                                                                                                                                                                                                                                                                                                                                                                                                                                        6.    CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO
                                                                                                                                                       24.7
                                                                                                                                                              3
                                                                                                                                                                                                                          26.35
                                                                                                                                                                                                                      TREE 0.1
                                                                                                                                                                                                                                                          20.115                                                             C                                                                                                          7.
                                                                                                                                                                                                                                                                                                                                                                                                                                              BE COMPACTED IN ACCORDANCE WITH GEOTECHNICAL CONSULTANT RECOMMENDATIONS AND AS1289.
                                                                                                                                                                                                                                                                                                                                                                                                                                              TEMPORARY SWALE DRAINS TO BE PROVIDED ALONG CREST AND TOE OF ANY CUTS AND ABOVE FILL
                                                                                                                                                                                                                                     50805




                                                                                                                                                                        5
                                                                                                                                                                                                                                                                                                                            C21                                                                                                               BATTERS GRADING DISCHARGE TO A CONTROL POINT FOR DISCHARGE TO EXISTING STORMWATER




                                                                                                                                                                     .2
                                                                                                       A                                                24




                                                                                                                                                                   25
                                                                                                                                                                                                                                                                        26.83
                                                                                                      C2124.00
                                                                                                                                                             .69
                                                                                                                                                                                                                                    TREE 0.151004                                  27.0                                               Sewer                                                                                                   INFRASTRUCTURE IN ROAD RESERVE.
                                                                                                                                     24.10                                                                                                                                             2
                                                                                                                                                                                                                                                                                           LIL 0.1                                               Line In




                                                                                                                                                                                                                                                                    7
                                                                                                                                                                                                                                                                                  27.07                                                                 dicative                                                                        8.    A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED ON SOIL SUBGRADES ALONG




                                                                                                                                                                                                                                                                  .5
                                                                                                                                                                                                                3
                                                                                                                                                                                                                                                                                                         50905




                                                                                                                                                                                                             .7




                                                                                                                                                                                                                                                                26
                                                                                                                                                                                                                                                                        26.60




                                                                                                                                                                              9
                                                                                                                                                                                                                                                                                                                                                                    Only (N




                                                                                                                                                                                                           25
                                                                                                                              n
                                                                                                                                                                                                                                                                                                                            27.




                                                                                                                                                                            .2
                                                                                                                           Kerb
                                                                                                                                                                                                                                            26.22                                                                                                                                                                                             HAUL ROADS AND LAYDOWN AREAS TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE




                                                                                                                                                                          25
                                                                                                                                                                                                                                                                                                                                                                            o


                                                                                                                         tume
                                                                                                                                                                                                                                                                                26.69
                                                                                                                                                                                                                                                                                                                                                                             t Loca
                                                                                                                                                                                                               25.
                                                                                                                                                                                                                   52                        26.09
                                                                                                                                                                                                                                                                                                                                    5                                              ted by                                                     REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON THE SITE.




                                                                                                                                                                                                                                                             5
                                                                                                                                                                                                                                                                                                                                                          27.




                                                                                                                                                                                                                                                           .3
                                                                                                                                                                                                                                                                                                                                                    71       86                             Survey)
                                                                                                                                                                                                                                                                                                                                                27.




                                                                                                                                                                                                                                                         26
                                                                                                                                                                            2
                                                                                                                                                                                                                                                                                                                                                                                                                                        9.    IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED WHERE UNSUITABLE NATURAL



                                                                                                        Telstra ck of




                                                                                                                                                                          .8
                                                                                                                   of B i




                                                                                                                                                                                                                                                                       3
                                                                                                                                                                       24




                                                                                                                                                                                                                                                                     .4
                                                                                                                                                                                                                                                                                                                                                                                                                                              MATERIALS ARE LOCATED AND AS OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL.




                                                                                                                                                                                                                                                                  26
                                                                                                                                               24.17




                                                                                                                                                                                                                                                                                                                                           0
                                                                                                                                                                                                                                 2
                                                                                                                                                   2
                                                                                                                                                                                                                                                                                41




                                                                                                                                                                                                                                                                                                                                         .7
                                                                                                                                                                                                                              .9
                                                                                                                                              24.4
                                                                                                                                                                                                                                                                            26.                                                                                                                                                               IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC MATTER AND




                                                                                                                                                                                                                                                                                                                                      26
                                                                                                                                                                                                                            25
                                                                                                                 a
                                                                                                                                                                                                                                                                 26.41
                                                                                                               B                                                                                                                           Deck                                                                                                                                                                                               STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND CAPABLE OF BEING COMPACTED INTO COHERENT
                                                                                                     Edge




                                                                                                                                                                                                                                                                                                                      4
                                                                                                                                                                                                                                                                                                                    .6
                                                                                                                                                                                                                                                                                                                                                                                                                                              FILLING TO THE SPECIFIED STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%,




                                                                                                                                                                                                                                                                                                                  26
                                                                                                                                                                                                                           25                                   26.
                                                                                                                                                                                                                             .84                                   45                                                                                                                                                                         A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
                                                                                                         Pit




                                                                                                                                                                                                           6
                                                                                                                                                                                                        .4
                                                                                                  23.57                                                                                                                                                                                                                                                                                                                                 10.   ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE CONTENT FOR STANDARD




                                                                                                                                                                                                      25
                                                                                                                                                                                                                                                                                                                                                            A




                                                                                                                                                                       4
                                                                                                                                                                                                                                                                                                                                                                                                                                              COMPACTION.




                                                                                                                                                                     .5
                                                                                                              23.




                                                                                                                                                                                                                                                                                                                                                           C21




                                                                                                                                                                   24
                                                                                                                 67




                                                                                                                                              0"                                                                                                                                                                                                                                                                                        11.   ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROPERTY BOUNDARY OF THE
                                                                                                                                       26.150                                                                                                                                                                                 26
                                                                                                                                                                                                                                                                                                                                .50
                                                                                                                                                                                                                                                                                                                                                                                                                                              SUBJECT SITE, INCLUDING REAR OF RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS
                                                                                                                                      12°02'0

                                                                                                                                                                                                                                                                                                                                                                                                                                              IN CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH STRUCTURAL ENGINEERS




                                                                                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                                                                             .5




                                                                                                                                                                                                                                                                                                                                                    9
                                                                                                                                                                                                                                                                                                                                                                                                                                              SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL




                                                                                                                                                                                                                                                                                                          26




                                                                                                                                                                                                                                                                                                                                                 .4
                                                                                                                                                                                                                                                                                                                                        27.


                                                                                                                                                                                                                                                                                                                                               27
                                                                                                                                                                                                                     Deck                                                                                  Stairs                                                                                                                             REPORT.




                                                                                                                                                                                                                                                                                                                                        46
                                                                                                                        23.                                                                                                                                                                                                                                                                                                             12.   REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION OF RETAINING WALL COLOUR
                                                                                                                                                                                      3
                                                                                                                                                                                  071
                                                                                                                           69
                                                                                       23.22                                                                                                                                                                                                                                                                                                                                                  AND FINISH.
                                                                                                                                                                        0.5




                                                                                                                                                                                                                                                                                                    Ramp
                                                                                                         0
                                                                                                     23.3                                                                                                                                                                                                                                                                                                                               13.   ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 1' SOIL ENGINEERING SUPERVISION IN
                                                                                                                                     23




                                                                                                       23.27
                                                                                                                                                                   IN C
                                                                                                                                      .98




                                                                                                                                                                                                          5
                                                                                                                                                             PO                                                                                                                                                                                                                                                                               ACCORDANCE WITH APPENDIX B OF AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL

                                                                                                                                                                                                        .0
                                                                                                                                               2




                                                                                                                                                                                                     25
                                                                                                                              23.
                                                                                                                                            .9




                                                                                                                                 73                                                                                                                                                                                                                                                                                                           PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN CARRIED OUT IN
                                                                                                                                          23




                                                                                                              41                                                                                                                                                                                                                                                                                                                              ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AND THE CONTROLLED FILL IS SUITABLE FOR
                                                                                                          23.
                                                                                                                          23




                                                                                                                                                                          8




                                                                                                                                                                                                                                                                                                                                                                                                                                              PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY
                                                                                                                                          9




                                                                                                                                                                       .5
                                                                                                                              .65


                                                                                                                                         .7




                                                                                                                                                                   24
                                                                                                                                       23




                                                                                                                                                                                                                                                                                                              6
                                                                                                                                                                                                                                                                                                           .1
                                                                                                                                                                                                                                                                                                                                                                                                                                              THE GEOTECHNICAL REPORT.




                                                                                                                                                                                                                                                                                                                    26.1
                                                                                                                                                                                                                                                                                                         26
                                                                                                                                                                                                                                          Floor Level




                                                                                                                                                                                                                                                                                                                                9
                                                                                                                                  74




                                                                                                                                                                                                                                                                                                                            .0
                                                                                                                                                                                                                                                                                                                                                                                                                                        14.   ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO 98% STANDARD MAXIMUM DRY




                                                                                                                                                                                                                                                                                                                      8
                                                                                                                               23.




                                                                                                                                                                                                                                                                                                                                           2
                                                                                                                                                                                                                                                                                                                            27
                                                                             D
                                                                                             0




                                                                                                                                                                                                                                                                                                                                        .1
                                                                                              0




                                                                                                                                                                                                                                                                                                                                      27
                                                                                                                                                                                                                                                                                                                                                                                                                                              DENSITY OR A DRY DENSITY INDEX OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN
                                                                                                                                                                                                                                             RL26.19
                                                                                           23.




                                                                            C21
                                                                                                                                                      24




                                                                                                  23.00                                                                                                                                                                                                                                                                                                                                       LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
                                                                                                                                                        .35




                                                                                                                                                                                                                                                                                                                                                                                                                                        15.   COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS PER VERTICAL LIFT WHERE




                                                                                                                                                                                                                                                                                                                                       '00"
                                                                                                                                                         36                                                                                                                                                                                                                                                                                   STRUCTURAL FILL HEIGHTS EXCEED 300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE
                                                                                                                                                      24.
                                                                                                                                                                                            1




                                                                                                                                                                                                                                                                                                                                                                                                                                              ALL EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER AND LOCAL AUTHORITY
                                                                                                                   4




                                                                                                                                                                                         .1




                                                                                                                                                                                                                                                                                                                                 30.175
                                                                                                                 .3




                                                                                                                                                                                    25
                                                                                                              23




                                                                                                                                                                                                                                                                                                                                                                                                                                              REQUIREMENTS.




                                                                                                                                                                                                                                                                                                                                192°02
                                                                                                                                                                                                              25.25
                                                                                                                                                                   .63




                                                                          22.68
                                                                                                                                                                                                                                                                                                Deck
                                                                                                                                                                   24




                                                                                                                                                                                                                                                                                                                                                                                                                                        16.   FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH
                                                                                                                                             Co




                                                                                                                                                                                           .06                                                                                                                                                              137                                                                               LANDSCAPE/ARCHITECTURAL DRAWINGS.
                                                                                                                                              nc




                                                                                                                                                                                     25
                                                                                                                                                 re




                                                                                                                  59
                                                                                                              23.                                                                            5.1
                                                                                                                                                                                                 9                                                                                                                                                                                                                                      17.   ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
                                                                                                                                                      te




                                                                                                                                                                                         2
                                                                                                                                                                                                                                                                                                                                                           RP160425                                                                     18.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED MANAGEMENT PLANS.
                                                                                                                              23.8




                                                                                                                                        23.94
                                                                                                                                                            Dr




                                                                                                                                                                                               .23




                                                                                                                                                                                                                                                                                                                     6
                                                                                                                                                                                                                                                                                                                  .9
                                                     TBM (Screw in Kerb)               .57
                                                                                                                                                               ive




                                                                                                                                                                                                                                                                                                                26
                                                                                                                                                                                                                                                                                                                                                                                                                                        19.   CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE INSTALLED INCLUDING BUT NOT
                                                                                                                                                                                             25




                                                                                                                                                                                                                                                                                                                                       D
                                                                                                                               7




                                                                                    22                                                                                                                                                                                                                    3
                                                          RL22.58 AHD                                                                                                                                                                                                                              26.5
                                                                                                                                                                   wa




                                                                                         22.59                                                                                                                                                                                                                                        C21                                                                                                     LIMITED TO SHAKE DOWNS, SILT FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL
                                                                                                                                                                                                                                                                25
                                                                                                                          5




                                                                                                                                                                       y




                                                                                                                                                                                                                                                                                                                    26.85
                                                                                                                                                                                                                                                                                                                                                                                                                                              PLAN.
                                                                                                                                                                                                                                                                 .35
                                                                                                                        23.7




                                                                                                                                                                                                                                                                            Stairs
                                                                                                           23




                                                                                           Gully Pit                                                       5  5
                                                                                                              .




                                                                                                                                                       24.
                                                                                                                                         8
                                                                                                              21




                                                                                                                                      .2




                                                                                                                                                                                                                                                                                                                                                                                                                                        20.   ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR RETAINING WALLS
                                                                  22.36
                                                                                                                                                                                                                   Garage Level
                                                                                                                                    24




                                                                                       22.49
                                                                                                                                                                                                                                                                            1
                                                                                                                                                                                                                                                                                                                                                                                                                                              (TEMPORARY OR PERMANENT) AS PER RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.
                                                                                                                                            .35




                                                                                                                                                                                                                                                                           .3




                                                                                                                                                                                                                                                                                                                            4
                                                                             22




                                                                                                                                                                                                                                                                          25



                                                                                                                                                                                                                    RL25.33



                                                                                                                                                                                                                                                                                                                         .6
                                                                                                                                          24




                                                                                                                                                                                                                                                                                                    0



                                                                                                                                                                                                                                                                                                                      26
                                                                                                                                                                                                                                                                                                                                                                                                                                        21.   DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON DISTURBED SOILS, ACCESS TRACKS
                                                                               .47




                                                                                                                                                                                                                                                                                                          26.
                                                                                                                                                                             3




                                                                                                                                                                                                                                                                                                 .4
                                                                                                                                                                        24.9




                                                                                                                                                                                                                                                                                                25

                                                                                                                                                                                                                                                                                                              37
                                                                              22.36
                                                                                                                                                                                                                                                                                                                                                                                                                                              AND STOCKPILES AT A SUFFICIENT LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS
                                                                  22.25
                                                                                                                                                                                                                                                                                                                                                                                                                                              ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT DUST
                                                                                                                          23
                                                                                                    6




                                                                                                                                                                                  25
                                                                                                  .6




                                                                                                                               .7




                                                                                                                                                                                                      07
                                                                                               22




                                                                                                                                                                                                                                                                                                                                                                                                                                              MOVEMENT.
                                                                                                                                                                                   .15




                                                                                                                                                                                                25.
                                                                                                                                5
                                                                                                                                    32 5.69




                                                                                                                                                                                   25
                                                                                                                   4
                                                                                                                .0




                                                                                                                                                                        24.80                                                                                                                                                                                                                                                           22.   PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE CONTRACTOR IS
                                                                                                             23




                                                                                                                                      7°0 0




                                                                                                                                                                                                               24.
                                                                                                                                                                                                                     94                                                                                                                                                                                                                       TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                                                                                                                                                                                           3
                                                                                                                                         2'0




                                                                                                                                                                                                                                                        .1




                                                                                  22.21                                                                                                                                                                                                                                                                                                                                                 23.   TEMPORARY UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT 1V:2H, AND IN
                                                                                                                                                                                                                                                     25




                                                                                                                                                                                                                                                                                             3
                                                                                                                                                                                                                                                                                                 25.92




                                                                    22.10
                                                                                                                                                                                                                                                                                                                  7
                                                                                                                                                                                                                                                                                           .2




                                                                                                                          22.97                                                                                                                                                                                                                                                                                                               MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY
                                                                                                                                                                                                                                                                                                                .1
                                                                                                                                            0"




                                                                                                                                                                                                                                                                                           25




                                                                                                                                                                                                                                                                                                              26



                                                                                                                                              23
                                                                                                                                                .65                                                                                                                                                                                                                                                                                           THE GEOTECHNICAL ENGINEER. PERMANENT CUT AND FILL BATTERS TO BE A MAXIMUM 1V:2.5H.
                                                                                                                                                                                                                                                                                                                                                                                                                                        24.   EARTHWORKS FILL BATTERS TO BE MAXIMUM OF 1M IN HEIGHT, OR OTHERWISE RETAINED.
                                                                                                                                                                                                               5
                                                                                                                                                                                                        .6 4.7
                                                                                                                                                                                                            2




                                                                                                                                                                                                                                                                                                                                                                                                                                        25.   WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED, TEMPORARY SHORING WILL BE
                                                                                                                    8
                                                                                                                 .4




                                                                                                                                                                                                          9




                                                                                             22.12
                                                                                                               22




                                                                                                                                                                  23.72                                                                                                                                                                                                                                                                       REQUIRED UNDER THE ADVICE OF A SPECIALIST SHORING CONTRACTOR.
                                                                                                                                                                                                        24




                                                                                   0                 22.08                                                     23                                                                                                                                                                                                                                                                       26.   EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE SPECIFIC DESIGN TO PREVENT
                                                                             22.0
                                                                                                                                                                                                                                            80




                                                                                                                                                                 .06                     23.97
                                                                                                                                             Valve                                                                                                                                                                                                                                                                                            UNDERMINING WHICH SHOULD BE CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ
                                                                                                                                                                                                                                              .




                                                                                                                          Po
                                                                                                                                                                                                                                           24




                                                                                                                   08
                                                                                                             22.                we                                               23.37                                                                                                                                                                                                                                                        STRUCTURAL ENGINEER.
                                                                                                                                                                                                                   282°02                                                         CAP
                                                                                                                                                                                                                                                          78




                                                                                                                                   r
                                                                                                                                                                                                                                                            .
                                                                                                                                                                                                                                                         24




                                                                                             21.98
                                                                                                  Pit 8
                                                                                                                          22.09         po
                                                                                                                                             le                        Telstra P                                          '00"                          2
                                                                                                                                                                                                                                                      3 4.78                       25.20
                                                                                                                                                                                                                                                                                                                                                                                                                                        27.   A GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING
                                                                                                                                                                                                                                                                                                                                                                                                                                              STRUCTURES ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF SAFETY
                                                                                              ly 1.9                                                                                       it                       16.090                        24.4                                                 .51
                                                                                           Gul 2                         22
                                                                                                                                                                                                                                                                                                    25                                                                                                                                        AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
                                                                                                                                                                                                                                                                                        25




                                                                                                                                                                                                                                                         Fire Hydrant                               25.                                                                                                                                 28.   EARTHWORKS LEVELS SHOWN ARE NOMINALLY 200MM BELOW FINISHED SURFACE LEVELS INCLUSIVE OF
                                                                                                                                                                                                                                                                                         25 5




                                                                                                                                                      22
                                                                                                                              .00
                                                                                                                                                                            Back o                                                                                                                     37
                                                                                                                                                                                                                                                                                           .1
                                                                                                                                                                                                                                                                                            .4




                                                                                                                                                            .42
                                                                                                                                                                                    f Kerb
                                                                                                                                                                                                                                                                                               
Log in to download the original file

Approved Plans RAL22-0016 & OPW22-0180.pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.