Council archive · source document
Decision Notice - 010.2007.00000738.001 [As Published] · 132007.738
2007/738
The assessment and certification is required immediately after installation of the equipment
and prior to any occupation of the building, and in a format approved by Council. This
assessment must take into account noise from any other fixed equipment on the property e.g.
swimming pool pump, heating/cooling equipment, etc that may increase the overall noise level
emitted.
Advice: It is highly recommended that the person you engage to certify the installation is
involved at the plan development stage so they can recommend where this equipment is best
located. They can also advise about noise enclosures and can make other suggestions to
avoid noise problems. It is a lot more costly to try and deal with noise problems after
everything is built.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Acid Sulfate Soils Advice Agency Department of PO Box 573
Natural Resources NAMBOUR QLD 4560
& Water
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
Sheet No. 1 “Industrial Development at Precinct N May 2008
Gateway Drive Noosaville” prepared by
Herwig Hartl trading as Smartarch
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
Existing Development Approved Development
Existing Use Approved Use Class / Approved
Existing Quantity
Class / Use Use Quantity
Industrial Business –
Detached House Vacant Land 3,840 m2
Type 2
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $134,661 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from March 2008 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
Page 13 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00000738.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 185 KB (small file)
- File type
No other editions are linked here.