271117 Techtonic GeoTech Cooroy Mtn Rd
Attached to the e-mail TPA21/0010 - Soil test report.
Mr Ken Freeman 17385-001-Rev0
27 November 2017
4.0 ASSESSMENT OF LAND STABILITY
4.1 Existing Conditions
Noosa Shire Council (NSC) landslide hazard overlay mapping (Refer extract in Text Figure 7) indicates that
the lot has some areas assigned as being a “Landslide Hazard Area.”
Existing house
Text Figure 7: Extract from Noosa Shire Council Hazard Overlay (courtesy Noosa Shire Council Interactive Maps)
It should be noted that the NSC map is a broad-scale indication, applied at a coarse resolution, of the
potential landslide hazard only and is superseded by site specific assessment. The areas of the proposed
construction works, and the existing house are not designated as a “Landslide Hazard Area.”
4.2 Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 2 on the
following page, and the Qualitative Terminology for Use in Assessing Risk to Property is also attached.
Table 2: Stability Risk Levels
Risk Level Example Implications(1)
Unacceptable without treatment. Extensive detailed investigation and research, planning
Very High
VH and implementation of treatment options essential to reduce risk to Low; may be too
Risk
expensive and not practical. Work likely to cost more than value of property.
Unacceptable without treatment. Detailed investigation, planning and implementation of
H High Risk treatment options required to reduce risk to Low. Work would cost a substantial sum in
relation to the value of the property.
May be tolerated in certain circumstances (subject to regulators’ approval) but requires
Moderate
M investigation, planning and implementation of treatment options to reduce risk to Low.
Risk
Treatment options to reduce to Low risk should be implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk
L Low Risk
to this level, ongoing maintenance required.
Very Low
VL Acceptable. Manage by normal slope maintenance procedures.
Risk
7/13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.