Council archive · source document
07/2179 - Response to Information Request [As Published] · 172007.2179
LOT 30 (NO 66) TINGIRA CRESCENT, SUNSHINE BEACH EBIS REFERENCE NO: 278118-SU 2.5 Effluent Disposal Waste water will be disposed of via council's sewerage system. 3.0 Conclusion In accordance with the engineering principles, due regard has been given to the proposed building extension and foundations. We have also assessed the proposed stormwater system and sewage disposal and consider these will not adversely affect the site stability of this site and adjoining allotments. EBIS recommends a final inspection and evaluation of the site layout including cuts/fills retaining walls and surface and subsurface drainage systems. This is to ensure compliance to the above recommendations and sound building practices on steep and sloping sites. Please contact EBIS when this inspection is required. Yours faithfully, D. R. Stanfield BE. (civil, CP. Eng., MLE. Aust, RP-E.O, No. 4177, NTBPB STES3329, Vic EB 19910, ENCLOSURES: 1, The Noosa Plan Extract 2. Mapping of the Landslip Hazard areas 3. Map View Extract PROPOSED NEW RESIDENCE PAGE 2 OF 2 2 October 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2179 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 821 KB (small file)
- File type
No other editions are linked here.