Council archive · source document
132005.1137.05 - Delegated Report
DELEGATED REPORT PLANNING REQUEST TO EXTEND RELEVANT PERIOD Application No: 132005.1137.05 Author: Wilhelm Koschade APPLICATION DETAILS Application Number: 132005.1137.05 Applicant: Planconsult Pty Ltd Request Received Date: 04/03/2014 Original Approval Type: Development Permit for Material Change of Use (Duplex Dwelling) Development Permit for Operational Work (Landscaping, Car Parking, Access, Stormwater Drainage and Sediment & Erosion Control) Number of Submissions for Original Application: 1 PROPERTY DETAILS Property Address: 7 Park Cres SUNSHINE BEACH QLD 4567 RP Description: GTP 574 Land Area: 522m2 Existing Use of Land: Vacant Land STATUTORY DETAILS Planning Scheme: The Noosa Plan (16 September 2013) Planning Locality: Eastern Beaches Planning Zone: Attached Housing Assessment Type: Extension to Relevant Period PROPOSAL: The applicant seeks a 2 year extension of the relevant period of a Material Change of Use - Multiple housing Type 2 – Duplex and associated Operational Works at 7 Park Cres, Sunshine Beach. The applicant requests an extension of 2 years for the following reasons: Economic hardship and shortage of capital to cover costs of development. BACKGROUND: Two separate applications for a Development Permit for Material Change of Use (Duplex Dwelling) & Operational Works were issued on 23 March 2006 over 5 and 7 Park Crescent. A Negotiated Decision Notice which made amendments to Conditions 8, 29 & 39 was issued on 4 August 2006. An approval to extend the relevant period was issued on 21 April 2010 which extended the period by 2 years until 23 March 2012. On the 25 June 2012, Council further extended the approval for 2 years, until 23 March 2014. STATUTORY PROCESS: In accordance with Section 388 of the Sustainable Planning Act 2009, in deciding a request to extend the relevant period, the assessment manager must only have regard to: (a) the consistency of the approval, including its conditions, with current laws and policies applying to the development, including, for example, the amount and type of infrastructure contributions, or infrastructure charges payable under an infrastructure charges schedule; (b) the community’s current awareness of the development approval; and (c) whether, if the request were refused- (i) further rights to make a submission may be available for a further development application; and (ii) the likely extent to which those rights may be exercised; and (d) the views of any concurrence agency for the approval… ASSESSMENT: Consistency with Current Planning Scheme & State Policies/Regulations State Planning Policy The site is not affected by any of the mapped State Interests within the State Planning Policy. The Noosa Plan The application was approved as an impact assessable application under The Superseded Planning Scheme. As indicated in the previous extension to currency period reports, the proposal does not comply with The Noosa Plan’s probable solutions and specific outcomes relating to building height in storeys, roof form and setbacks. Building Height in Storeys The proposed basement no longer complies with the definitions within The Noosa Plan, making the development 4 storeys in height. Notwithstanding this non-compliance, the development is consistent with the character of the street, with the surrounding buildings all being 4 storeys in height. Given the non compliance, it is also noted that that the development complies with the maximum height of the planning scheme in metres. Roof Form – Roof Top Terrace The development includes a roof top terrace for the western unit. Although roof top terraces are generally not encouraged under The Noosa Plan, the proposal is considered acceptable as the proposed terrace will not present any opportunity to overlook the private open space of the existing residences to the north and east. While there is no development on the adjoining property to the west (5 Park Cres), the proposed design allows for sufficient vegetation along the western side setback, so as to reduce the opportunity to overlook the neighbouring private open space. The design is also compatible with the roof form of other developments along Park Crescent and the nearby locality, with a number of the buildings having roof top terraces and low pitched roofs (notably the adjoining development to the east of the site). Setbacks The proposed 3rd storey of the development has a 500mm encroachment on the northwest side setback. The encroachment is considered to comply with The Noosa Plan outcomes, as the encroachment is only 3.1m of the internal stairwell and would not interfere with the privacy or visual amenity of the adjoining allotment. The Operational Works component of the approval is still considered relevant and there have been no major changes in policy since the approval. Infrastructure Charges Under the provisions of the existing approval, infrastructure contributions have not been required for the following relevant networks: Stormwater Transport These networks are now applicable to the proposed development. In accordance with the position adopted by Council on 15 March 2013, an infrastructure agreement is required to secure the additional charges for these networks so that the approval remains consistent with current laws and policies applying to the development. These charges are additional to the infrastructure contributions and/or charges required under the provisions of the existing approval. The applicant has agreed to enter into an infrastructure agreement. The executed infrastructure agreement will be attached to the decision notice for this request. Community’s Current Awareness of the Development, Rights to Submit and Likelihood of Further Submissions The original application was impact assessable, with one submission being received. The duplex proposal is now made code assessable against The Noosa Plan, with advertising no longer required. Concurrence Agencies There were no concurrence agencies to the original application. RECOMMENDATION APPROVED - It is recommended that the Relevant Period for 132005.1137.04 is extended for a period of 2 years and will expire on 23 March 2018 Change Condition 10 to read as follows:- 10. The Development Permit for a material change of use lapses if the use has not happened by 23 March 2018, unless an application to extend the currency is approved by Council. [word/footer1.xml] FM1517s/4-22/06/2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132005.1137.05 - Delegated ReportRelated documentApplication case desk ↗
About this file
- File size
- 29 KB (small file)
- File type
- DOCX
No other editions are linked here.