DEHP Concurrence Agency Reponse
EHP Permit number: SPCC0486912
CONDJTIONS
Agency Interest -
General
1. All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the notice attached to this permit.
2. All materials and works must comply with Australian Standards.
3. An appropriate spill kit, personal protective equipment and relevant operator instructions/emergency
procedure guides for the management of fuel and chemicals associated with the operational works stage
must be kept on site.
4. Anyone working under this approval must be trained in the use of the spill kit.
5. Telephone the Department of Environment and Heritage Protection (EHP)Pollution Hotline on
1300130372 or local office on (07)54596132 immediately after becoming aware of any release of
contaminants or other breach of condition, not in accordance with the conditions of this approval.
6. The construction and installation of the works must not result in any adverse impacts on the surrounding
environment, nor cause any long-term maintenance and management implications.
7. Should the works result in adverse impacts, the permit holder is responsible for rectification works and
where necessary the removal of the works causing impacts.
8. The chief executive administering the Coastal Protection and Management Act 1995 may order the works
to be removed or modified within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:
(i) create a danger to the public; or
(ii) cause erosion or land degradation; or
(iii) are unstable; or
(iv) have not been constructed according to the approved plans.
Agency Interest - Land
9. No sand is to be removed from the coastal dune system or active beach system within the erosion prone
area or coastal management district.
10. Spoil removed from within the proposed development area must be stockpiled separately upon
excavation, and reused, rather than disposed of.
11. Best practice erosion and sediment control measures must be implemented and maintained to minimise
erosion and the release of sediment.
Agency Interest -
Vegetation
12. All works must be undertaken in a manner that minimises damage to the native vegetation on and
adjacent to the site.
13. There must be no death or permanent removal of marine plants, inter-tidal plants or native terrestrial
woody vegetation outside of the disturbance footprint as indicated within the attached approved plans, as
a result of these works.
Agency Interest -
Water
14. All materials used in the construction of the woks must be:
(v) clean and free of silt; and
(vi) suitable for the purpose having regard to the location of the land and to the proposed use of the
land.
15. The development must maintain local and regional drainage and hydrological systems.
16. The development must not result in a change in water chemistry that will impact on ecological values on
or off site.
17. Stockpiles of waste, spoil or other contaminated material must not be stored within thirty (30)metres of
the high water mark.
18. Chemical, waste, fuel or oil storage onsite must be appropriately bunded to contain the full volume of the
stored material.
END OF CONDITIONS
f
Page 3 of 3 120607 Version 1
. .
Department of Environment and Heritage Protection
[OCR of page images]
EHP Permit number: SPCC0486912
CONDITIONS
Agency Interest — General
1.
2.
3.
All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the notice attached to this permit.
All materials and works must comply with Australian Standards.
An appropriate spill kit, personal protective equipment and relevant operator instructions/emergency
procedure guides for the management of fuel and chemicals associated with the operational works stage
must be kept on site.
Anyone working under this approval must be trained in the use of the spill kit.
Telephone the Department of Environment and Heritage Protection (EHP) Pollution Hotline on
1300 130 372 or local office on (07) 5459 6132 immediately after becoming aware of any release of
contaminants or other breach of condition, not in accordance with the conditions of this approval.
The construction and installation of the works must not result in any adverse impacts on the surrounding
environment, nor cause any long-term maintenance and management implications.
Should the works result in adverse impacts, the permit holder is responsible for rectification works and
where necessary the removal of the works causing impacts.
The chief executive administering the Coastal Protection and Management Act 1995 may order the works
to be removed or modified within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:
(i) create a danger to the public; or
(ii) | Cause erosion or land degradation; or
(iii) are unstable; or
(iv) have not been constructed according to the approved plans.
Agency Interest — Land
9.
10.
11,
No sand is to be removed from the coastal dune system or active beach system within the erosion prone
area or coastal management district.
Spoil removed from within the proposed development area must be stockpiled separately upon
excavation, and reused, rather than disposed of.
Best practice erosion and sediment control measures must be implemented and maintained to minimise
erosion and the release of sediment.
Agency Interest — Vegetation
12.
13.
All works must be undertaken in a manner that minimises damage to the native vegetation on and
adjacent to the site.
There must be no death or permanent removal of marine plants, inter-tidal plants or native terrestrial
woody vegetation outside of the disturbance footprint as indicated within the attached approved plans, as
a result of these works.
Agency Interest — Water
14.
15.
16.
17.
18.
All materials used in the construction of the woks must be:
(v) clean and free of silt; and
(vi) suitable for the purpose having regard to the location of the land and to the proposed use of the
land.
The development must maintain local and regional drainage and hydrological systems.
The development must not result in a change in water chemistry that will impact on ecological values on
or off site.
Stockpiles of waste, spoil or other contaminated material must not be stored within thirty (30) metres of
the high water mark.
Chemical, waste, fuel or oil storage onsite must be appropriately bunded to contain the full volume of the
stored material.
END OF CONDITIONS
Page 3 of 3 * 120607 « Version 1 Department of Environment and Heritage Protection
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DEHP Concurrence Agency Reponse.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.