Original source · versioned page text
202609 1 Olivine Street Rev C
From the archive 1 Olivine DA.zip, inside Lodgement of Development Application - MCU25/0136. File date in the archive: 2025-11-14 09:36.
CLIENT: Walt Construction Group
DATE: Monday, 10 November 2025
STATUS: Development Approval
1 Olivine Street
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (202609 1 Olivine Street Rev C.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 14 (of 26)
Page 2
CLIENT & PREPARED FOR: DEVELOPMENT SUMMARY DEVELOPMENT CONTROLS CONTENTS
Walt Construction Group PROPERTY DETAILS PLOT RATIO DA1.01 COVER PAGE
Lot 126 0.5:1 or 506.15m² GFA
JOB NO: Plan C5604 DA1.02 CONTENTS
202609 - 1 Olivine Street Property ID 129383 SITE COVER
Lot Area 1012.30m² 45% or 455.53m² DA1.03 DETAIL SURVEY
BY: Address 1 Olivine St, COOROY QLD 4563
Blackwood Architecture DA1.04 DEMOLITION PLAN
BUILDING HEIGHT
25/91 Poinciana Avenue, Tewantin PLANNING SCHEME 8m
QLD 4565 DA1.05 DESIGN STRATEGY
Noosa Planning Scheme 2020
07 5301 9677 SETBACKS DA1.06 PROPERTY PLAN
0416 037 424 PLANNING ZONES Front 6m
Medium Density Zone Side 1.5-2.5m DA1.07 SITE PLAN - GROUND LEVEL
www.blackwoodarchitecture.com.au Rear TBC
[email protected] LOCAL PLAN CODE DA1.08 SITE PLAN - UPPER LEVEL
Cooroy Local Plan Code LANDSCAPE
Phil Tillotson - 35% or 354.30m² DA2.01 GROUND FLOOR (PART A)
QLD Registered Architect #5386 DEVELOPMENT CODE DA2.02 GROUND FLOOR (PART B)
Dual Occupancy and Multiple Dwelling Code PROPOSED SITE USE
The designs and drawings contained in this document are the Multiple Dwellings DA2.03 UPPER FLOOR (PART A)
copyright of Blackwood Architecture and shall not be reproduced, OVERLAYS
copied or used in any other context other than the project and site None NCC EDITION DA2.04 UPPER FLOOR (PART B)
specified. The proposal herewith are conceptual, subject to change NCC 2022 Amendment #2, Volume 2
and not to be used for construction or sales and marketing. DA2.05 ROOF PLAN (PART A)
BUILDING CLASSIFICATION
Class 1a DA2.06 ROOF PLAN (PART B)
DA2.07 TYPE ONE PLANS
DA2.08 TYPE TWO PLANS
KAURI ST
DA3.01 NORTH & SOUTH ELEVATIONS
ST
I NE
OL
IV DA3.02 EAST ELEVATION
E
INSERT SNAZZY NE
LA
N
DA3.03 WEST ELEVATION
VI
MAP OLI
TI
N
RD
N DA4.01 SECTION A
ELM ST
https://snazzymaps.com/editor/edit-my-style/480884
TE
W
A
RD DA5.01 SITE COVER
RIVER
MARY
PEARL ST
DA5.02 LANDSCAPE CALCULATION
PEARL LANE
DA5.03 PLOT RATIO
DA5.04 PRIVATE OPEN SPACE
DA6.01 RENDERS
COOROY
EMERAL
D ST DA6.02 END PAGE
DIAMOND LANE
WIMME
RS LAN
E
OPAL ST
KAURI LANE
KAURI ST
GARNE
MIVA ST
T ST
ST
OAK ST
WATTLE
VICTOR
Y LANE
AL LANE
RUBY ST
HOSPIT
ST
MAPLE
Site Location SITE: 1 Olivine St, COOROY QLD 4563
Not to Scale
DRAWING REGISTER
Issue Date Description Checked
A 30/09/2025 Concept Issue PT
B 31/10/2025 Concept Issue PT
C 10/11/2025 Development Approval Issue PT PRELIMINARY ISSUE
1 Olivine Street CONTENTS
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:1, 1:4.40 @ A3 202609 10/11/2025 C DA1.02
Page 3
O L I V I N E S T R E E T
107.42 107.84 108.17
108
107.92 108.17
108.04 SWP
107.87 107.80IL
107.36 107.42 107.78
107.34 107.40 107.75
108.05 108.06
107.47 107.54 107.87 108.01 107.93
107.77 107.81
108.07 107.96
107.76 Conc Apron
107.97 107.82
108.16
108.12
L
108.41
IL
L :1
108.17
H:
108.28
:1 06
108.01
M .69
07 .8
1
Existing Site Plan / Survey
1:200
Paperbark Leopard
M
B R
108.07 108.15
L
108.40
:P:1
H
M 07
Paperbark
1
24 .92
W
107.95 108.62
97 6
108.09 42°49'30"
M
108.18 20.117 108.41 108.46
125
126
108
K
C5604
127
A
1,012.30m²
C5604
108.32
108.59
U
1 Olivine Street
Steps 10
F 9
FL . 8
8
For Walt Construction Group
108.65
R
108.81 108.98
1 Olivine St, COOROY QLD 4563
Exotic
I
109
108.27 High-Set
108.30 Timber House
108.43
109.05
Cadaghi
108.53
109.06
S
109.17
Steps 109.01
Palm 109.05
108.67
T
108.96
R
Scrub
109.04 109.46
108.88
109.26
E
109
Fig
109.60
Leopard
E
Scale
109.10
Exotic 109.21 Lillypilly
109.15 109.76
1:200 @ A3
T
Lillypilly
109.38
109.91
109.61
DETAIL SURVEY
50.321
110 109.96
132°49'30"
Metal Garage
312°49'30"
110.22 110.33 110.32
110.48
50.322 110
Silky Oak
Metal Shed
110.64
202609
110.71 110.68
110.58 110.71 110.88
Project No.
110.55
110.59 110.96 110.67 110.9
6
111
Date
10/11/2025
111.37
111
111.11 111.28
C
Mango
111.70
Revision
Hoop Pine Fig
Camphor Laurel Fig
111.74 111.96 111.94 Fig
111.96 111.80
111.54 111.98
20.117
Camphor Laurel 222°49'20" Palm 112.08
111.64
111.78
111.38 111.9111.76
6 111.95
112
111.75 112.04 112.33
O L I V I N E L A N E
111.78 112.05 112.32
112
DA1.03
PRELIMINARY ISSUE
Page 4
107.76 Conc Apron
L A N E
S T R E E T
108.06
107.81
SWP
108.12
108.17
107.82
108.41
108.17
108.62
108.98
125
111.95
112.33
111.98
112.08
Exotic
107.80IL 109 132°49'30" 112
110.88
111.37
C5604
110.68
6
110.67 110.9
107.77
50.321
107.97
112.32
111
108.07 107.96
107.93
108.16
110 109.96
Fig
109.60
109.05
109.17
108.05
Lillypilly
109.76
Scrub
109.46
108.81
108.04
110.71
108.46
108.28
Mango
111.70
Metal Garage Metal Shed
109.91
110.32
108.65
108
109.06
110.58
110.48
108.41
108.17
107.92
108.01
108.59
M
109.01
W
Silky Oak
H
110.64
111.80
111.28
108.40
110.55
110.33
111.94 Fig
110.96
107.84
107.87
111.9111.76
112.04
Palm
112.05
Hoop Pine Fig
109.26
O L I V I N E
107.75
107.78
6
Timber House
42°49'30"
109.05
107.87
20.117
High-Set
111.96
Steps
108.96
222°49'20"
20.117
108.01
110.71
112
Leopard
109.61
108.18
108.15
8
FL . 8
109.04
F 9
111.74
Steps 10
O L I V I N E
110.22
Camphor Laurel Fig
109.21
Paperbark
111.11
108.88
108.09
111.96
Paperbark
Camphor Laurel
108.07
108.32
108.43
Leopard
Lillypilly
109.10
111.78
109.38
126
Cadaghi
108.67
109.15
Exotic
108.53
110.59
111.75
Palm
111.78
111.38
108.30
107.54
107.40
107.42
1,012.30m²
107.95
108 109 50.322 110 111
107.42
312°49'30"
108.27
111.54
111.64
127
107.34
107.36
107.47
1
H: 97 6 C5604
M .69 24 .92
1 M 07
07 .8 :P:1
L :1 06 M L
L :1 B R
IL
DEMOLITION NOTES:
K = to be removed / demolished
A Demolition
Standard: To AS 2601.
U Demolished materials
Removal: Except for items to be salvaged for reuse in the works and are to be retained and materials to be
R recycled on site, take possession of demolished materials and remove them from the site. Do not burn or
bury demolished materials on the site.
Recycling: Where possible, dismantle building components for off site recycling.
I Support
Temporary supports: Until permanent support is provided, provide temporary support for sections of existing
buildings which are to be altered and which rely for support on work to be demolished.
Encroachment
General: Prevent the encroachment of demolished materials onto adjoining property, including public places.
Security
General: If walls or roofs are opened for alterations or additions, provide security against unauthorised entry.
S Asbestos removal
Method: Use wet removal methods recommended in the Code of Practice for the Removal of Asbestos
(NOHSC: 2002), including Part 4 for insulation and lagging, and Part 9 for asbestos cement.
Demolition Plan T Monitoring: Have dust monitoring performed by an independent testing authority.
1:200 R PRELIMINARY ISSUE
E
1 Olivine Street E
DEMOLITION PLAN
For Walt Construction Group Scale T Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:200 @ A3 202609 10/11/2025 C DA1.04
Page 5
BRICK CLADDING
ROOF SHEETING GUTTERING
LANDSCAPING VERTICAL CLADDING & RENDERED WALLS HORIZONTAL CLADDING & SCREENING
PRELIMINARY ISSUE
1 Olivine Street DESIGN STRATEGY
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 @ A3 202609 10/11/2025 C DA1.05
Page 6
L A N E
S T R E E T
125
C5604 132°49'30"
50.321
1.5m Setback
2.0m Setback
2.5m Setback
4.5m Setback
COMMON PROPERTY = 398.64 m2
M
W
H
O L I V I N E
42°49'30"
20.117
222°49'20"
20.117
UNIT 1 = 131.67 m2 UNIT 2 = 86.40 m2 UNIT 3 = 86.40 m2 UNIT 4 = 86.40 m2 UNIT 5 = 86.40 m2 UNIT 6= 136.40 m2
O L I V I N E
6.0m Setback 2.5m Setback
2.0m Setback
126 1.5m Setback
1,012.30m² 50.322
312°49'30"
127
C5604
K
A
U
R
I
S
Property Plan T
1:200 R PRELIMINARY ISSUE
E
1 Olivine Street E
PROPERTY PLAN
For Walt Construction Group Scale T Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:200 @ A3 202609 10/11/2025 C DA1.06
Page 7
O L I V I N E S T R E E T
107.42 107.84 108.17
108
107.92 108.17
SWP
107.87 107.80IL
107.36 107.42 107.78
107.34 107.40 107.75
108.05 108.06
107.47 107.54 107.87 107.93
107.77 107.81
107.96 107.76 Conc Apron
107.97 107.82
108.16
108.12
L
108.41
IL
L :1
H:
:1 06
108.01
M .69
07 .8
1
1:200
Site Plan Lower
Paperbark Leopard
M
B R
108.07 108.15
L
108.40
:P:1
H
M 07
Paperbark
1
24 .92
W
97 6
108.09 42°49'30"
M
108.18 20.117
125
126
108
K
C5604
127
6,450
6,450
A
1,012.30m²
C5604
8,200
U
1 Olivine Street
6.0m Setback
For Walt Construction Group
R
1 Olivine St, COOROY QLD 4563
I
109
108.30
108.43
1.5m Setback
2.0m Setback
2.5m Setback
2.5m Setback
2.0m Setback
1.5m Setback
109.05
Unit 1
S
109.05
T
R
109.26
E
109
6,317
Unit 2
E
Scale
109.21
1:200 @ A3
T
3,500
110
109.61
Unit 3
50.321
132°49'30"
SITE PLAN - GROUND LEVEL
312°49'30"
Unit 4
110.22 110.33
50.322 110
6,317
202609
Unit 5
110.71 110.68
110.88
Project No.
110.55
110.59 110.96 110.67 110.9
6
3,500
111
Date
Unit 6
10/11/2025
111.37
111
111.11 111.28
C
4.5m Setback
Revision
6,121
4,372
20.117
111.64 222°49'20" 112.08
111.38 111.9111.76
6 111.95
112
111.75 112.04 112.33
O L I V I N E L A N E
111.78 112.05 112.32
112
DA1.07
PRELIMINARY ISSUE
Page 8
1.5m Setback
2.0m Setback
5,717
5,717
6,317
2.5m Setback
4.5m Setback
8,200
Unit 2 Unit 3 Unit 4 Unit 5 6,122
6,000 Unit 1 Unit 6
3,272
5,350
6.0m Setback
8,769 6,691
6,000 2.5m Setback
3,500
3,500
3,469
2.0m Setback
1.5m Setback
Site Plan Upper
1:200
PRELIMINARY ISSUE
1 Olivine Street SITE PLAN - UPPER LEVEL
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:200 @ A3 202609 10/11/2025 C DA1.08
Page 9
Conc Ap
107.76
107.81 2,000 2,500 2,100 7,600 Unit 1 6,000 Unit 2 6,000 Unit 3
108.12
ABBREVIATIONS 107.82
108.41
125
Col Column
C5604 FT1
109
FT1 132°49'30"
107.77
317
DP Down Pipe
50.321
107.97
EG Eaves Gutter
107.96
107.93
108.16
110
FB Selected Face Brick
109.05
FC Hardies Fine Texture with
cover battens. Paint Finish 1.5m Setback
FC2 Hardies Stria 405. Paint Finish DRIVEWAY 2.0m Setback DRIVEWAY
FFL Finished Floor Level FF: Permeable 2.5m Setback FF: Concrete
6,317
Paving
6,000
FT1 Fence Type 1
LWB Linea Weatherboards. Paint Finish
NGL Natural Ground Level
RN1 Render over FC Sheet
RN2 Render over Blockwork
RW1
RW1
RN3 Render Finish 3 M
W
RS1 Custom orb Roof Sheet H
RW Retaining Wall 108.40
Scn1 Screen Type 1
8,200 WC WC
A: 2.93 m2
A: 2.93 m2
Scn2 Screen Type 2
PDR
PDR
Scn3 Screen Type 3
6,450 DP
SFL Structural Floor Level
Riser
Riser
A: 11.31 m2
A: 11.31 m2
ENTRY
ENTRY
Visitor 1 B B
A: 12.00 m2 Car Space Car Space Car Space Car Space
109.26
A: 12.96 m2 A: 12.96 m2 A: 12.96 m2 A: 12.96 m2
WC
42°49'30"
P'DR
109.05
GARAGE GARAGE
20.117
REFER TO PART B
B A: 3.40 m2 A: 20.28 m2 A: 20.28 m2
GARAGE
2
A: 33.68 m
Services
Services
WS
Unit 1 Unit 2 Unit 3
Cbd
108.01
L'DRY
Riser
Leopard
108.15
A: 1.35 m2
109.61
108.18
12,300
#LayID 5,400 Elec / Storage
WM Tub Laundry / Storage Laundry / Storage
#DrgID
Pty F Pty F Pty F
KITCHEN
Letterboxes
LIVING DINING / KITCHEN LIVING DINING / KITCHEN
A: 8.75 m2 A: 11.49 m2 A: 13.23 m2 A: 11.49 m2 A: 13.23 m2
DP
6.0m Setback S S S
REFUSE
6 x 240L
TV TV TV
CT CT CT
109.21
Paperbark
108.09
LIVING DINING
Riser
A: 17.86 m2 A: 8.93 m2
6,450
Paperbark
108.07
108.43
2.5m Setback
Terrace Terrace Terrace
FT1
2.0m Setback A: 14.90 m2 A: 12.00 m2 A: 12.00 m2
3,500
1.5m Setback
126
1,012.30m² DP DP DP DP DP DP DP DP
1,425
108.30
RW1
RW1
RW1
FT1
FT1
108 FT1 FT1 109
0. Ground Level
1:100
PRELIMINARY ISSUE
1 Olivine Street GROUND FLOOR (PART A)
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:100 @ A3 202609 10/11/2025 C DA2.01
Page 10
6,000 Unit 4 6,000 Unit 5 7,600 Unit 6 1,000 2,500 1,021
111.95
112.33
112.08
32°49'30" FT1 FT1 112
317
110.88
111.37
50.321
110.68
110.96
RW1 RW1
FT1
RW1
111
112.32
L A N E
110.67
DRIVEWAY DRIVEWAY
FF: Concrete FF: Permeable
4.5m Setback
6,317
Paving
6,000
1,672
Deep
RW1
RW1
Landscape
6,122
111.28
WC WC
110.55
110.33
A: 2.93 m2
A: 2.93 m2
PDR
PDR
O L I V I N E
DP
110.96
Visitor 2
111.76
112.04
A: 12.00 m2
Riser
Riser
A: 11.31 m2
A: 11.31 m2
ENTRY
ENTRY
B B
112.05
Car Space Car Space Car Space Car Space
A: 12.96 m2 A: 12.96 m2 A: 12.96 m2 A: 12.96 m2
WC
111.96
GARAGE GARAGE P'DR
REFER TO PART A
A: 20.28 m2 A: 20.28 m2
GARAGE
A: 3.40 m2 B ABBREVIATIONS
FT1
A: 33.68 m 2
Col Column
Services
Services
222°49'20"
Unit 4 Unit 5 Unit 6 DP Down Pipe
Cbd
FT1
20.117
112 EG Eaves Gutter
L'DRY
RW1
3,322
Riser
110.71
A: 1.35 m2
FB Selected Face Brick
12,300
Laundry / Storage Laundry / Storage Tub WM
Elec / Storage #LayID
#DrgID FC Hardies Fine Texture with
Pty Pty F Pty cover battens. Paint Finish
F F
FC2 Hardies Stria 405. Paint Finish
RW1
RW1
KITCHEN
RW1
LIVING DINING / KITCHEN LIVING DINING / KITCHEN
110.22
A: 11.49 m 2
A: 13.23 m 2
A: 11.49 m 2
A: 13.23 m 2 A: 8.75 m2 FFL Finished Floor Level
DP
FT1
S S S FT1 Fence Type 1
LWB Linea Weatherboards. Paint Finish
TV TV TV
CT CT CT NGL Natural Ground Level
4,372 RN1 Render over FC Sheet
111.11
DINING LIVING
Riser
A: 8.93 m 2
A: 17.86 m 2
RN2 Render over Blockwork
RN3 Render Finish 3
RS1 Custom orb Roof Sheet
Terrace Terrace Terrace RW Retaining Wall
A: 12.00 m2 A: 12.00 m2 A: 14.90 m2
3,500
Scn1 Screen Type 1
Scn2 Screen Type 2
DP DP DP DP DP DP DP DP
1,425
Scn3 Screen Type 3
111.75
110.59
RW1
RW1
RW1
111.78
FT1
111.38
RW1
RW1
FT1
FT1
FT1
110 111 SFL Structural Floor Level
50.322 FT1 FT1
312°49'30"
111.64
0. Ground Level
1:100
PRELIMINARY ISSUE
1 Olivine Street GROUND FLOOR (PART B)
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:100 @ A3 202609 10/11/2025 C DA2.02
Page 11
2,000 2,500 2,100 7,600 6,000 6,000
ABBREVIATIONS
Col Column
317
DP Down Pipe
EG Eaves Gutter
FB Selected Face Brick
FC Hardies Fine Texture with
cover battens. Paint Finish 1.5m Setback
FC2 Hardies Stria 405. Paint Finish 2.0m Setback
5,717
FFL Finished Floor Level 2.5m Setback
6,317
6,000
FT1 Fence Type 1
LWB Linea Weatherboards. Paint Finish
NGL Natural Ground Level
RN1 Render over FC Sheet
RN2 Render over Blockwork
RN3 Render Finish 3 Scn1
8,200
RS1 Custom orb Roof Sheet BED 2
A: 15.17 m2 BED 3
Scn1
RW Retaining Wall A: 10.44 m2
WC WC
Scn1 Screen Type 1 BED 1 BED 1
Dbl ENSUITE A: 12.46 m 2 ENSUITE A: 12.46 m2
Scn2 Screen Type 2 Qn A: 6.64 m2 A: 6.64 m2
EG DP
Qn Qn
Scn3 Screen Type 3
SFL Structural Floor Level
Robe
Unit 2 Unit 3
Fall 5.00°
RS1
Unit 1
REFER TO PART B
Robe Linen Linen
WIR WIR
A: 3.95 m2 A: 3.95 m2
BATHR'M
PASSAGE
PASSAGE
A: 7.65 m2
A: 7.65 m2
Desk
6,000
PASSAGE
A: 6.05 m2
Void
Void
A: 7.33 m2
WC WC
WC
B B
BATHR'M BATHR'M
12,300
#LayID A: 5.45 m2 A: 5.45 m2
Linen
#DrgID
EG
DP DP
ENSUITE
BED 1
A: 6.03 m2
B
RS1 A: 12.95 m2
DP
6.0m Setback
5,350 B Qn Qn
RS1 BED 2 BED 2
Robe
Robe
Qn
WC A: 11.58 m2 A: 11.58 m2
Robe
RS1 RS1
Fall 5.00°
8,769
Fall 5.00°
Fall 5.00°
DP DP DP DP DP DP
O
O
pe
pe
Scn2 Scn3
n
n
2.5m Setback
to
to
sk
sk
y
y
2.0m Setback
3,500
1.5m Setback 3,469
DP EG DP EG
DP DP DP EG
DP DP DP
1,500
1,500
1. Upper Level
1:100
PRELIMINARY ISSUE
1 Olivine Street UPPER FLOOR (PART A)
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:100 @ A3 202609 10/11/2025 C DA2.03
Page 12
6,000 6,000 7,600 1,000 2,500 1,021
317
5,717
5,717
4.5m Setback
6,317
6,000
6,122
Scn1
BED 2
BED 3 A: 15.17 m2
Scn1
2
A: 10.44 m
WC WC
BED 1 BED 1
ENSUITE A: 12.46 m2 ENSUITE A: 12.46 m2 Dbl
A: 6.64 m2 A: 6.64 m2 Qn DP EG
Qn Qn
Unit 4 Unit 5 Robe
Fall 5.00°
RS1
Unit 6
REFER TO PART A
Linen
WIR Linen
WIR
Robe
ABBREVIATIONS
A: 3.95 m2 A: 3.95 m2
Col Column
BATHR'M
PASSAGE
PASSAGE
A: 7.65 m2
A: 7.65 m2
Desk
DP Down Pipe
PASSAGE
A: 6.05 m2
3,272
Void
Void
A: 7.33 m2
WC WC
B B
WC EG Eaves Gutter
BATHR'M BATHR'M FB Selected Face Brick
12,300
A: 5.45 m2 A: 5.45 m2
#LayID
Linen
#DrgID FC Hardies Fine Texture with
EG
cover battens. Paint Finish
DP DP
FC2 Hardies Stria 405. Paint Finish
ENSUITE
BED 1
A: 6.03 m2
B
A: 12.95 m 2
RS1 FFL Finished Floor Level
DP
B FT1 Fence Type 1
Qn Qn 6,691
BED 2 BED 2 LWB Linea Weatherboards. Paint Finish
RS1
Robe
Robe
Qn
A: 11.58 m2 A: 11.58 m2 WC NGL Natural Ground Level
Robe
RS1 RS1
Fall 5.00°
RN1 Render over FC Sheet
Fall 5.00°
Fall 5.00°
RN2 Render over Blockwork
RN3 Render Finish 3
DP DP DP DP DP DP RS1 Custom orb Roof Sheet
O
O
pe
pe
Scn3 Scn3 Scn3
n
n
to
to
RW Retaining Wall
sk
sk
y
y
3,500
3,469
Scn1 Screen Type 1
Scn2 Screen Type 2
EG EG EG
DP DP DP DP DP DP DP DP Scn3 Screen Type 3
1,500
1,500
SFL Structural Floor Level
1. Upper Level
1:100
PRELIMINARY ISSUE
1 Olivine Street UPPER FLOOR (PART B)
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:100 @ A3 202609 10/11/2025 C DA2.04
Page 13
ABBREVIATIONS
Col Column
DP Down Pipe
EG Eaves Gutter
FB Selected Face Brick
FC Hardies Fine Texture with
cover battens. Paint Finish 1.5m Setback
FC2 Hardies Stria 405. Paint Finish 2.0m Setback
FFL Finished Floor Level 2.5m Setback
FT1 Fence Type 1
LWB Linea Weatherboards. Paint Finish
NGL Natural Ground Level
RN1 Render over FC Sheet
RN2 Render over Blockwork
RN3 Render Finish 3
RS1 Custom orb Roof Sheet
RW Retaining Wall
Scn1 Screen Type 1
Scn2 Screen Type 2
Scn3 Screen Type 3
SFL Structural Floor Level
Fall 5.00°
Fall 5.00°
REFER TO PART B
RS1 RS1
RS1
Fall 5.00°
#LayID
#DrgID
EG DP EG DP
6.0m Setback
DP
2.5m Setback EG DP EG DP DP EG DP DP
2.0m Setback
1.5m Setback
2. Roof
1:100
PRELIMINARY ISSUE
1 Olivine Street ROOF PLAN (PART A)
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:100 @ A3 202609 10/11/2025 C DA2.05
Page 14
4.5m Setback
Fall 5.00°
Fall 5.00°
REFER TO PART A
RS1 RS1 ABBREVIATIONS
Col Column
RS1 DP Down Pipe
EG Eaves Gutter
FB Selected Face Brick
Fall 5.00°
#LayID
#DrgID FC Hardies Fine Texture with
cover battens. Paint Finish
EG EG
FC2 Hardies Stria 405. Paint Finish
DP DP
FFL Finished Floor Level
FT1 Fence Type 1
LWB Linea Weatherboards. Paint Finish
NGL Natural Ground Level
RN1 Render over FC Sheet
RN2 Render over Blockwork
RN3 Render Finish 3
RS1 Custom orb Roof Sheet
EG DP DP EG DP DP DP EG DP
RW Retaining Wall
Scn1 Screen Type 1
Scn2 Screen Type 2
Scn3 Screen Type 3
SFL Structural Floor Level
2. Roof
1:100
PRELIMINARY ISSUE
1 Olivine Street ROOF PLAN (PART B)
For Walt Construction Group Scale Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:100 @ A3 202609 10/11/2025 C DA2.06
The text continues on page 15.