Original source · versioned page text
202609 1 Olivine Street Rev C
From the archive 1 Olivine DA.zip, inside Lodgement of Development Application - MCU25/0136. File date in the archive: 2025-11-14 09:36.
107.76 Conc Apron
L A N E
S T R E E T
108.06
107.81
SWP
108.12
108.17
107.82
108.41
108.17
108.62
108.98
125
111.95
112.33
111.98
112.08
Exotic
107.80IL 109 132°49'30" 112
110.88
111.37
C5604
110.68
6
110.67 110.9
107.77
50.321
107.97
112.32
111
108.07 107.96
107.93
108.16
110 109.96
Fig
109.60
109.05
109.17
108.05
Lillypilly
109.76
Scrub
109.46
108.81
108.04
110.71
108.46
108.28
Mango
111.70
Metal Garage Metal Shed
109.91
110.32
108.65
108
109.06
110.58
110.48
108.41
108.17
107.92
108.01
108.59
M
109.01
W
Silky Oak
H
110.64
111.80
111.28
108.40
110.55
110.33
111.94 Fig
110.96
107.84
107.87
111.9111.76
112.04
Palm
112.05
Hoop Pine Fig
109.26
O L I V I N E
107.75
107.78
6
Timber House
42°49'30"
109.05
107.87
20.117
High-Set
111.96
Steps
108.96
222°49'20"
20.117
108.01
110.71
112
Leopard
109.61
108.18
108.15
8
FL . 8
109.04
F 9
111.74
Steps 10
O L I V I N E
110.22
Camphor Laurel Fig
109.21
Paperbark
111.11
108.88
108.09
111.96
Paperbark
Camphor Laurel
108.07
108.32
108.43
Leopard
Lillypilly
109.10
111.78
109.38
126
Cadaghi
108.67
109.15
Exotic
108.53
110.59
111.75
Palm
111.78
111.38
108.30
107.54
107.40
107.42
1,012.30m²
107.95
108 109 50.322 110 111
107.42
312°49'30"
108.27
111.54
111.64
127
107.34
107.36
107.47
1
H: 97 6 C5604
M .69 24 .92
1 M 07
07 .8 :P:1
L :1 06 M L
L :1 B R
IL
DEMOLITION NOTES:
K = to be removed / demolished
A Demolition
Standard: To AS 2601.
U Demolished materials
Removal: Except for items to be salvaged for reuse in the works and are to be retained and materials to be
R recycled on site, take possession of demolished materials and remove them from the site. Do not burn or
bury demolished materials on the site.
Recycling: Where possible, dismantle building components for off site recycling.
I Support
Temporary supports: Until permanent support is provided, provide temporary support for sections of existing
buildings which are to be altered and which rely for support on work to be demolished.
Encroachment
General: Prevent the encroachment of demolished materials onto adjoining property, including public places.
Security
General: If walls or roofs are opened for alterations or additions, provide security against unauthorised entry.
S Asbestos removal
Method: Use wet removal methods recommended in the Code of Practice for the Removal of Asbestos
(NOHSC: 2002), including Part 4 for insulation and lagging, and Part 9 for asbestos cement.
Demolition Plan T Monitoring: Have dust monitoring performed by an independent testing authority.
1:200 R PRELIMINARY ISSUE
E
1 Olivine Street E
DEMOLITION PLAN
For Walt Construction Group Scale T Project No. Date Revision
1 Olivine St, COOROY QLD 4563 1:200 @ A3 202609 10/11/2025 C DA1.04
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (202609 1 Olivine Street Rev C.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.