Skip to the record
Accept no substitutions.

Original source · versioned page text

Traffic Engineering Report

of 32

Page text read automatically using OCR, there may be inaccuracies

 

   
  
 

 

 

Timber
ah fetain

Q

‘SITE BOUNDARY

 

‘SITE BOUNDARY

 

 

 

 

 

  
 

 

‘SITE BOUNDARY

 

 

 

po
cette
Lt

 

B85 Vehicle (Realistic min radius) (2004
Overall Length 4,910m
Overall Wid . 1.870m
Overall Body Height 1.421m
Min Body Ground Clearance 0.159m
Track Width . 1,770m
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 5.750m

 

 

I Richard Quinn <RPEQ 08565) certify that
the swept paths have been carried out in
accordance with AS2890.1 which recognises
that residential developments will have low
turnover and users are generally prepared
to accept some inconvenience when entering
or leaving the parking space.

tad

 

drawing title

QlTratfic

23 Bottlebrush Ave Noosa Heads

Swept Path B85 Car

 

 

drawn: RQ Scale:1:200 @ AZ date: 02/06/25
The base drawing Is provided to @ Traffic by others This drawhng Is
draft for discussion’ purposes only

 

 

2051_TPA968

project no,

5K.01

 

drawing no.

B

rev

 

 

 

 

Log in to download the original (Traffic Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.