Decision Notice - MCU22 0197 [As Published] · MCU22/0197
b. all landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
19. All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
20. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the landscaping works conditions of
this Decision Notice.
*(Refer to Advisory Note)
External Works
21. Southern Cross Parade must be upgraded for the length of its frontage to the subject site.
The works must be undertaken in accordance with the conditions held within this Decision
Notice, be generally in accordance with RECOR’s Stormwater Layout Plan (040, Rev. B)
dated 23 February 2023 and must include in particular:
a. construction of kerb and channelling and underground stormwater drainage to the
development side only;
b. removal of the existing property access and reinstatement of the kerb, footpath (1.5-
metre-wide) and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed; and
c. construction of a 1.5-metre-wide pedestrian footpath across the full length of the
frontage and in accordance with the conditions of this Decision Notice.
Site Access and Driveways
22. A sealed access driveway must be provided from Southern Cross Parade to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
the conditions held within this Decision Notice and be generally in accordance with RECOR’s
Driveway Layout Plan (010, Rev. B) dated 23 February 2023.
Car Parking
23. A minimum of 4 covered car parking spaces must be provided on the site. The works must
be undertaken in accordance with the conditions held within this Decision Notice and must
include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Stormwater Drainage
24. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions held within this
Decision Notice and be generally in accordance with:
a. RECOR’s Stormwater Layout Plan (040, Rev. B) dated 23 February 2023; and
b. RECOR’s Stormwater Longitudinal Sections (046, Rev. B) dated 23 February 2023.
Easements
25. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
26. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
Page 4 of 24
Document Set ID: 22467236
Version: 3, Version Date: 20/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - MCU22 0197 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 503 KB (small file)
- File type
No other editions are linked here.