Council archive · source document
Noosa District Body Corp Approval · MCU13/0224
Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
20. 2s The Body Corporate, or their authorised agent, will approach builders where necessary to bring their attention to any practices in breach of Body Corporate guidelines. The owner is further required to ensure that if approached by Body Corporate, or their authorised agent, that builders react professionally, positively and favourable to the direction provided. In the event there are issues that cannot be resolved through direct approach to the builder, the owner will be requested to attend a meeting with the Body Corporate Committee to reach agreement regarding day to day compliance. Owners will be encouraged to invite their builders to this meeting. Insurance 22, Prior to building start, the Builder is required to lodge a copy of his current public liability and contract works insurance, and provide a certificate of currency nominating the building site address. Conclusion 23. The Body Corporate Committee seeks the owner’s active cooperation in ensuring 24, 2: 26. that builders meet their commitment to these guidelines and diligently manage all those subcontracted to the site. Although the Body Corporate Committee has no direct control over the builders, it will make every effort to seek the cooperation of construction teams. Ultimately, however it will be the allotment owner’s legal and moral responsibility to ensure compliance with these guidelines and Body Corporate requests, and to minimise the disruption to other residents during construction as much as possible. Owners and their appointed Builders are required to sign and return one copy of these Guidelines to the Body Corporate, prior to building start. Builders are required to arrange access to the Estate per Item 2 prior to building start. (Item added following 2013 AGM) As provisioned under By Law 24.3 (e) the Body Corporate request you also provide certification by a Licenced Building Surveyor that: a. All construction falls 100% within the building envelop and no encroachment is made into the zones noted as ‘natural vegetation zones to remain untouched’. b. No area of the roof exceeds 8 Metres above natural ground level, or lower if your Lot is covered by an RL) We look forward to your cooperation in regard to these matters. Yours faithfully, Committee for Noosa Dunes (Noosa Dunes CTS 26506) R126506NoosaDunes\Legal\Committee 'sGuidelinesforBuilding Works-010709-Amendedl 70413.doc Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa District Body Corp ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 15.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.