Noosa District Body Corp Approval · MCU13/0224

of 10

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

20.

2s

The Body Corporate, or their authorised agent, will approach builders where
necessary to bring their attention to any practices in breach of Body Corporate
guidelines. The owner is further required to ensure that if approached by Body
Corporate, or their authorised agent, that builders react professionally, positively
and favourable to the direction provided.

In the event there are issues that cannot be resolved through direct approach to the
builder, the owner will be requested to attend a meeting with the Body Corporate
Committee to reach agreement regarding day to day compliance. Owners will be
encouraged to invite their builders to this meeting.

Insurance

22,

Prior to building start, the Builder is required to lodge a copy of his current public
liability and contract works insurance, and provide a certificate of currency
nominating the building site address.

Conclusion
23. The Body Corporate Committee seeks the owner’s active cooperation in ensuring

24,

2:

26.

that builders meet their commitment to these guidelines and diligently manage all
those subcontracted to the site. Although the Body Corporate Committee has no
direct control over the builders, it will make every effort to seek the cooperation
of construction teams. Ultimately, however it will be the allotment owner’s legal
and moral responsibility to ensure compliance with these guidelines and Body
Corporate requests, and to minimise the disruption to other residents during
construction as much as possible.

Owners and their appointed Builders are required to sign and return one copy of
these Guidelines to the Body Corporate, prior to building start.

Builders are required to arrange access to the Estate per Item 2 prior to building
start.

(Item added following 2013 AGM) As provisioned under By Law 24.3 (e) the
Body Corporate request you also provide certification by a Licenced Building
Surveyor that:

a. All construction falls 100% within the building envelop and no encroachment
is made into the zones noted as ‘natural vegetation zones to remain
untouched’.

b. No area of the roof exceeds 8 Metres above natural ground level, or lower if
your Lot is covered by an RL)

We look forward to your cooperation in regard to these matters.

Yours faithfully,

Committee for Noosa Dunes
(Noosa Dunes CTS 26506)

R126506NoosaDunes\Legal\Committee 'sGuidelinesforBuilding Works-010709-Amendedl 70413.doc Page 5 of 6

Used in these records

About this file

File size
15.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Noosa District Body Corp Approval.pdf · 15.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.