Skip to the record
The gold standard in government transparency.

Original source · versioned page text

TODS Stormwater Comments - TODs

of 3

Page text shows just the words. Original shows the document exactly as it was published.

17656: ENGINEERING REPORT ON EXISTING DRAINAGE
Address:         4 Tristania Drive, Marcus Beach

1. Background

Tod Consulting have been engaged to provide technical advice on an existing stormwater pipe that
traverses the property at 4 Tristania Drive Marcus Beach. The pipe runs along the southern boundary
of the property from the David Low Way road reserve to a manhole in Tristania Drive and is identified
as a Council asset on Council’s interactive mapping. It should be noted that although this pipe is a
Council asset there is no easement on the property over the pipe. Refer screen shot below.




The purpose of this report is to determine if this stormwater pipe is still an active Council asset and
if not whether it can be removed to allow a more functional design and development outcome for
the site.
Log in to download the original file

TODS Stormwater Comments - TODs.pdf · 793 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.