Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Hydraulic Assessment 29 August 2024

Attached to the e-mail Operational Works Application OPW25/0049 - Cover Letter, DA Form 1, Hydraulic Assessment 29 August 2024 - 38 Barina Ct_ Pomona - Email 1 of 2.

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

DISCLAIMER
This Report has been prepared on behalf of and for the exclusive use of Mark Kussrow and is subject to and issued in accordance with Mark
Kussrow instruction to Engeny Australia Pty Ltd (Engeny). The content of this Report was based on previous information and studies supplied
by Mark Kussrow.

Engeny accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this Report by any third party. Copying
this Report without the permission of Mark Kussrow or Engeny is not permitted.




Rev                  Date                 Description            Author            Reviewer             Project Mgr.         Approver

0                    29/08/2024           Client Issue           Lewis Hamilton Brendon Bolt            Lewis Hamilton       Brendon Bolt

Signatures:




38 BARINA COURT, POMONA I BBNE00000_0020-REP-001-0                                                                                             ii
Log in to download the original file

Hydraulic Assessment 29 August 2024.pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.