Original source · versioned page text
Hydraulic Assessment 29 August 2024
Attached to the e-mail Operational Works Application OPW25/0049 - Cover Letter, DA Form 1, Hydraulic Assessment 29 August 2024 - 38 Barina Ct_ Pomona - Email 1 of 2.
LEGEND
TUFLOW Model Boundary
Site Boundary
Cadastral
Flood level contour 1m
Flood Level
<= 103.5 mAHD
103.5 - 104.5 mAHD
104.5 - 105.5 mAHD
105.5 - 106.5 mAHD
106.5 - 107.5 mAHD
107.5 - 108.5 mAHD
108.5 - 109.5 mAHD
109.5 - 110.5 mAHD
110.5 - 111.5 mAHD
111.5 - 112.5 mAHD
112.5 - 113.5 mAHD
> 113.5 mAHD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.