Council archive · source document
Compiled Approved Plans 132004.240120.3
Plans and drawings: the text below has words only, no drawings.
Al structural elements including footings, walls and framing to be in ‘accordance with engineers design ‘and detail Soction Logond TB Timber boards spaced off black membrane over conc. imber duckboard with stainless steel shower tray to shower oom 72! ++ caulked timber floor to bed 1, dressing room and WC Bockwo | ne ‘tobe famed up rom structural slab es required 72 Tianum Zine fat sheet frameless les ior to wall between fating boxes RE Rendered block work ial FG Frameless glass ‘seat to crossing room BP Ste epped 2 Pac hh floor-FFL-27850 —.- — Second floor - FFL - 27 250 _ to entry sar wals 2 1 ‘referto acrylic for acrylic details: = to pond and cascade = existing boundary g NOOSA SHIRE|COUNCIL olny rece under window sil PLANS APPROVED | internal SIGNATURE: .atalk, sr doar ge -orwaa = planta RPA DATE: 3 9B [9b.. AO ‘natural ground fine - strana LS, sen oun se ‘floating’ wall with recessed pelmet lighting to top fil over and bottom - refer to lighting consultants . om YK arouna floor - FFL - 20 700_ polished concrete to fat down a a 7] nara GEPDC 7 60 ean OC 0, ih Sd Ga) OH eb wegen, ak pe "tase Pe Capron #8, Gc sis Naps Cohss nn, sea0 10S Giant Project Bag. John & Holen Krimmer ‘26 Arakoon Crescent Sunshine BeachQLD OS. WD 3.5 ‘Date offre issue Drawing ‘Checked Tobe. 36.05.06 SECTION EE 511
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans 132004.240120.3.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.