PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 JUNE 2019
d. Details of any signage proposed to be located within areas identified for
landscaping.
e. The area shown as a ‘Kids Garden Play Area’ on the USE PLAN - Site Plan,
prepared by Sparks Architects TP 1.00 Rev. A and dated 22.02.2019 must be
landscaped and not developed as a ‘Kids Garden Play Area’.
Damage to Services and Assets
16. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
ENGINEERING
Access Driveway
17. The access driveway to the site must be reconstructed in accordance with an
Operational Works approval and engineering design prepared by a suitably qualified
RPEQ (Registered Professional Engineer Queensland), and must include in
particular:
a. A driveway crossover generally in accordance with standard drawing RS-051
b. A driveway minimum width of 5.0m at boundary and 6.5m at the kerb line,
unless approved otherwise by Council
c. A clearance of 1.0m from existing power pole unless approved otherwise in
writing by Energex
d. A clearance of 1.0m from any existing or proposed kerb inlet lentil unless
approved otherwise by Council
e. Any required stormwater works to modify, replace or relocate existing
stormwater infrastructure
Car Parking
18. The carparking must be upgraded and line-marking generally in accordance with the
approved plans. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. 11 car parking spaces and 4 scooter parking spaces must and made accessible
during operation hours
b. 2 staff parking spaces within the total
c. 1 parking space for people with disabilities, and clearly marked for that purpose
d. 4 scooter parking spaces with clearly marked access aisle to prevent conflict
with parked vehicles
e. Loading zone and service vehicle/s parking, manoeuvring and standing area
clearly lined marked and posted
f. Parking spaces to be sufficiently sign posted and line marked to specify their
use (eg staff parking, customer parking etc)
Page 21 of 133
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.