Skip to the record
Accept no substitutions.

Original source · versioned page text

2017-07-11 Planning & Environment Committee Agenda

of 78

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     11 JULY 2017


     e)    A stormwater quality treatment system. The stormwater treatment must generally be
           in accordance with the Stormwater Management Plan for Highway Service Centre
           Cooroy, project number 161968 by Covey Associates, dated October 2016 except
           where alteration to the inclusion of proprietary water quality treatment devices are
           necessary to achieve the following objectives as predicted in MUSIC modelling in
           accordance with the Water by Design MUSIC modelling guidelines.

                                  State Planning Policy          SEQ     Water   Development
                                                                 Guidelines:     Development
                                                                 Guidelines for Water Quality
                                                                 Management     in   Drinking
                                                                 Water    Catchments    (SEQ
                                                                 Water 2012)

           Total     Suspended 90% reduction compared to an
           Solids              unmitigated development
                                                               No increase in pollutant loads
           Total Phosphorous      60% reduction compared to an
                                                               compared to a Vacant Industrial
                                  unmitigated development
                                                               Allotment
           Total Nitrogen         45% reduction compared to an
                                  unmitigated development

           Where proprietary water quality treatment devices are included within the stormwater
           quality treatment strategy, evidence of a signed contract for a minimum period of 10
           years for maintenance of the proprietary stormwater quality treatment device must be
           provided to Council prior to commencement of use.
     k)    Delete


3.   CONCLUSION
Water Quality Targets as conditioned in the original approval are unlikely to be achievable with
regard to conventional best practice stormwater management practices. Therefore the condition
has been found to be unreasonable and cannot be practically applied to the development. The
water quality measures outlined by the applicant have been found to be satisfactory for this
development in the water supply catchment area.


Previous Council Consideration
Ordinary Meeting, 19 January 2017, Item 3, Page 4
That Council note the report by the Development Planner to the Planning and Environment
Committee dated 6 December 2016 and the Further Reports to the General Committee Meetings
dated 12 December 2016 and 16 January 2017, regarding Application No. MCU16/0066 &
OPW16/0133 for a Development Permit for Material Change of Use of Premises - Retail
Business Type 2 Shop & Type 5 Vehicle Uses, Entertainment & Dining Business Type 1 - Food &
Beverages and Operational Works for Signage, situated at 6 Taylor Court, Cooroy and:
A.   Approve the application in accordance with the following conditions:
     ……
B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     Planning Scheme:




                                                                                     Page 26 of 78
Log in to download the original file

2017-07-11 Planning & Environment Committee Agenda(PDF, 6MB).pdf · 6.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.