Original source · versioned page text
2016-04-19 P&E Committee - Item 1, Attachment 2 - Air Quality Assessment Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
3.4 Service Station Emission Calculations
3.4.1 Operational Data
Table 3.2 presents a summary of the proposed service station operational data. Figure 3.1 presents
the emission stack and the fugitive source locations.
Table 3.2: Service Station Operating Data
Parameter Operating Data
24 Hours a day
Operating Hours
7 days a week
Maximum 40,000 L / hour
Tanker Delivery
Phase 1 Vapour Recovery
Vent Stacks Assumed 4.0 m high
3 bowser ranks (2 filling points each side) located
Filling Stations/Petrol Bowsers below a 4.5 m canopy
Phase 2 Vapour Recovery
Service Station Trips Generated1 129 (entry and exit), in the peak hour
1 Proposed Service Station, 123 Eumundi – Noosa Road, Noosaville: Traffic Report (October 2015) prepared by Q Traffic
Engineering Consultants
Page 12 of 30
Synergy Property Partners Pty Ltd- Air Quality Assessment - Proposed Service Station, 123 Eumundi-Noosa Road, Noosaville
/Network/Projects/4484/Reporting/4484 Report03.odt
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.