OPW15/0195 - Operational Works Application - IDAS form 1 & 6
£L (RiKarie D &¢ Pos Mes 4 [2 Ber Zot” Conlek Nev tee Neegg- Genje., [BAS Forrs / ab <p. Che Gite sodGe nent Com e-/ } Uhr pag uestel vn your emat D Op B/N AMeached a Ke forma mypriheo ao a keg fo PAT. foo.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 12 pages
Page 2
Department of Infrastructure, Local Government and Planning IDAS form 1—Application details (Sustainable Planning Act 2009 version 4.2 effective 3 August 2015) This form must be used for ALL development applications. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: ¢ complete this form (IDAS form 1—Application details) * complete any other forms relevant to your application * provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Pianning Regulation 2009. This form and any other IDAS form relevant to your application must be used for development applications relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. PLEASE NOTE: This form is not required to accompany requests for compliance assessment. Mandatory requirements Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any development permit or preliminary approval that may be issued as a consequence of this application will be issued to the applicant.) Name/s (individual or company name in full) Elana boby lok bppnte Z For companies, contact name Postal address LO . bey. /L Gf Suburb Naor be Lb AGA State C-Lb Postcode emer County | AusreaciA Contact phone number SE “AT 27 68 7 Mobile number (non-mandatory requirement) Fax number (non-mandatory requirement) Government
Page 3
Department of Infrastructure, Local Government and Planning a 2 Email address (non-mandatory requirement) ‘KC Row/€ @ biehonl) 1 NET, Att. Applicant's reference number (non-mandatory requirement) 1. What is the nature of the development proposed and what type of approval is being sought? Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.) a) What is the nature of the development? (Please only tick one box.) Cc] Material change of use | Reconfiguring a lot CL Building work Operational work b) What is the approval type? (Please only tick one box.) C] Preliminary approval OC Preliminary approval | Development permit under s241 of SPA under s241 and s242 of SPA c) Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) INTER EERANCE WITH VECETAT ron d) Whatis the level of assessment? (Please only tick one box.) | Impact assessment oO Code assessment Table B—Aspect 2 of the application (If there are additional asp€cts to the application please list in Table C— Additional aspects of the application.) Vy a) What is the nature of development? (Please only tick oné box.) L] Material change of use EF Reconfiguring a lot Ol Building work . CT] Operational work b) What is the approval type? (Please only tick one box.) O Preliminary approval CI Preliminary approval Oo Development under s241 of SPA under s241 and s242 permit of SPA c) Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) d) Whatis the level of assessment? Ly Impact assessment Oo Code assessment Table C—Additional aspects of the application (If there are additional aspects to the application please list in a separate table on an extra page and attach to this form.) ; ds CI Refer attached schedule CT Not required N/ /r 7 IDAS form 1—Application details Version 4.2—3 August 2015
Page 4
Department of Infrastructure, Local Government and Planning 2. Location of the premises (Complete Table D and/or Table E as applicable. Identify each lot in a separate row.) Table D—Street address and lot on plan for the premises or street address and lot on pian for the land adjoining or adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water.) (Attach a separate schedule if there is insufficient space in this table.) L] Street address and lot on plan (All lots must be listed.) O Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.) Street address 7 _ Lot on plan Local government area L SBE, N/ Ty Coos E description (e.g. Logan, Caims) Lot Unit Street Street name and official Post- Lot no. Plan type no. no. suburb/ locality name code and plan no. Al CarA Shy hex i) 6 pekenity Ceoer |Met7| © | SP 18 8Qb) ii)” Nookp Wend iii) Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a separate row in the below table. Non-mandatory) Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s i) / ii) N/ A iii) Table E—Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient space in this table.) Coordinates Zone Datum Local government (Note: place each set of coordinates in a separate row) reference area (if applicable) Easting Northing Latitude Longitude L] cGpag4 K/ /A OC wessa CE] other 3. Total area of the premises on which the development is proposed (indicate square metres) LO Nel 4. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.) PPE RRTIVIENT faa % Codewany ALEW- IDAS form 1—Application details Version 4.2—-3 August 2015
Page 5
Department of Infrastructure, Local Government and Planning 5. Are.there any current approvals (e.g. a preliminary approval) associated with this application? (Non- mandatory requirement) wa No [_] Yes—provide details below List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) 6. Is owner’s consent required for this application? (Refer to notes at the end of this form for more information.) Pk] No L] Yes—complete either Table F, Table G or Table H as applicable Table F Name of owner/s of the land We, the above-mentioned owner/s of the land, consent to the making of this application. Signature of owner/s of the land Date Table G Name of owner/s of the land CE] The owner's written consent is attached or will be provided separately to the assessment manager. Table H Name of owner/s of the land CI By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. N i Identify if any of the following apply to the premises (Tick applicable box/es.) N/ ir Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table | On strategic port land under the Transport Infrastructure Act 1994—complete Table J In a tidal water area—complete Table K On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.) On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion) OOOOOd Listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 (no table requires completion) Table | i Name of water body, watercourse or aquifer x / # IDAS form 1—Application details Version 4.2—3 August 2015
Page 6
Department of Infrastructure, Local Government and Planning Table J Lot on plan description for strategic port land Port authority for the lot 7 Table K Name of focal government for the tidal area (if applicable) Port authority for the tidal area (if applicable) N/M 8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc) No CT] Yes—ensure the type, location and dimension of each easement is included in the plans submitted Does the proposal include new building work or operational work on the premises? (Including any services) No CC] Yes—ensure the nature, location and dimension of proposed works are included in plans submitted 10. . Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the end of this form for more information.) Ki No—go to question 12 [] Yes 11. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more information.) O CO No Yes—complete Table L and submit with this application the yellow local government/private certifier’s copy of the receipted QLeave form Table L r JL a Amount paid 7 it Date paid QLeave project number (6 digit number (dd/mmiyy) starting with A, B, E, L or P) 12. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of the Sustainable Planning Act 2009? ‘al O No Yes—please provide details below Name of local government Date of written notice given | Reference number of written notice given by local government by local government (if applicable) (dd/mm/yy) IDAS form 1—Application details Version 4.2—-3 August 2015
Page 7
Department of Infrastructure, Local Government and Planning 13. List below all of the forms and supporting information that accompany this application (Include all IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application) Description of attachment or title of attachment Method of lodgement to assessment manager bas 6 Har ber vereey AR BattsT. REPO] [Bech Tb WD Cont Hand b&b /ECD 7 eer o/s) 14, . Applicant’s declaration Dfpy making this application, | declare that all information in this application is true and correct (Note: it is unlawful to provide false or misleading information) Notes for completing this form ¢ Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application. Note, the assessment manager has discretion to accept an application as properly made despite any non- compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the Sustainable Planning Act 2009 Applicant details e Where the applicant is not a natural person, ensure the applicant entity is a real legal entity. Question 1 ¢ Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of assessment. Where schedule 3 identifies assessable development as “various aspects of development’ the applicant must identify each aspect of the development on Tables A, B and C respectively and as required. Question 6 ¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. If a development application relates to a state resource, the application is not required to be supported by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state resource is a separate process and will need to be obtained before development commences. Question 7 « Ifthe premises is listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to seek compliance assessment. Schedule 18 of the Sustainable Planning Regulation 2009 identifies where compliance assessment is required. Question 11 e The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. * The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. IDAS form 1—Application details Version 4.2—-3 August 2015
Page 8
Department of Infrastructure, Local Government and Planning Question 12 « The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. ¢ Building and construction industry notification and payment forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or visit www.qieave.qld.gov.au. Privacy—The information collected in this form will be used by the Department of Infrastructure, Local Government and Planning (DILGP), assessment manager, referral agency and/or building certifier in accordance with the processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of the IDAS process or the provisions about public access to planning and development information in the Sustainable Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by Parliament. This information may be stored in relevant databases. The information collected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received Reference numbers NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To Council. | have been engaged as the private certifier for the building work referred to in this application BSA Certification license Building Date of engagement | Name number classification/s QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if applicable.) Date receipted form sighted by assessment manager Name of officer who sighted the form QLeave project Amount paid Description of the work number (8) Date paid The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. IDAS form 1—Application details Version 4.2—-3 August 2015
Page 9
Department of Infrastructure, Local Government and Planning IDAS form 6—Building or operational work assessable against a planning scheme (Sustainable Planning Act 2009 version 3.1 effective 3 August 2015) This form must be used for development applications for building work or operational work assessable against a planning scheme. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: e complete DAS form 1—Application details * complete any other forms relevant to your application * provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. This form must be used for building work or operational work relating on strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. Mandatory requirements 1. . What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable boxes.) C] Building work—complete Table A av Operational work—-complete Table B Table A a) Whatis the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? N/# b) Are there any current approvals associated with this application? (e.g. material change of use.) No ~[] Yes— provide details below List of approval reference/s Dajeyapproved (dd/mm/yy) Date approval lapses (dd/mm/yy) AIL My Queensland Government
Page 10
Department of Infrastructure, Local Government and Planning Table B a) What is the nature of the operational work? (Tick all applicable boxes.) [-] Road works [-] Stormwater ["] Water infrastructure [-] Drainage works (| Earthworks [] Sewerage infrastructure [_] Landscaping [-] Signage MM Clearing vegetation under the planning scheme [| Other—provide details b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.) ‘Al No | Yes—specify the number of lots being created c) Are there any current approvals associated with this application? (E.g. material change of use.) M No EL] Yes—provide details below List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) 2. What is the dollar value of the proposed building work? (Inc-GST, materials and labour.) ‘hor Alepwcrbte 3. What is the dollar value of the proposed operational work? (Inc GST, materials and labour.) Sor knows Mandatory supporting information 4. Confirm that the following mandatory supporting information accompanies this application Mandatory supporting information Confirmation of lodgement Method of lodgement All applications involving building work or operational work A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are ix Confirmed recommended scales) which shows the following: e the location and site area of the land to which the application relates (relevant land) 4 Bok . the north point a7 e the boundaries of the relevant land hep - « the allotment layout showing existing lots, any proposed lots (including the OK/ dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) © any existing or proposed easements on the relevant land and their function any access limitation strips all existing and proposed roads and access points on the relevant land. haveRreb Fo Cotta Cf o- 7 OTF Qow IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—3 August 2015
Page 11
Department of Infrastructure, Local Government and Planning
A statement about how the proposed development addresses the local C] Confirmed
government's planning schemes and any other planning documents relevant Ny a
to the application. .
A statement addressing the relevant part(s) of the State Development C] Confirmed
Assessment Provisions (SDAP). Ld Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are [_] Confirmed
recommended scales) which show the following: {1 Not applicable
e the north point
e the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
e the room layout (for residential development only) with all rooms clearly
labelled
the existing and the proposed built form (for extensions only)
e the gross floor area of each proposed floor area.
Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are C Confirmed
recommended scales) which show plans of all building elevations and N icabl
facades, clearly labelled to identify orientation (e.g. north elevation). is ot applicable
Plans showing the size, location, proposed site cover, proposed maximum C] Confirmed
number of storeys, and proposed maximum height above natural ground level Not icabl
of the proposed new building work. ix applicable
Plans showing the extent of any demolition that is assessable development. [_] Confirmed
[xd Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing: [_] Confirmed
* existing and proposed contours Bd Not applicable
® areas to be cut and filled
e the location and level of any permanent survey marks or reference
stations used as datum for the works
e the location of any proposed retaining walls on the relevant land and their
height
@ the defined flood level (if applicable)
e the fill level (if applicable).
Applications for operational work involving roadworks
Drawings showing: L] Confirmed
e existing and proposed contours i Not applicable
e the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
e information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
e kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
edge of pavement where kerb is not constructed
e position and extent of channelisation
location and details of all traffic signs, guideposts, guardrail and other
street furniture
@ pavement markings including details on raised pavement markers
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.1—3 August 2015
Page 12
Department of Infrastructure, Local Government and Planning caichpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing material. Applications for operational work involving stormwater drainage Drawings showing: Cc Confirmed existing and proposed contours bd Not applicable e drainage locations, diameters and class of pipe, open drains and easements e manhole location, chainage and offset or coordinates and inlet and outlet invert levels e inlet pit locations, chainage and offset or coordinates and invert and kerb levels. Applications for operational work involving water reticulation Drawings showing: _] Confirmed e kerb lines or edge of pavement where kerb is not constructed hd Not applicable e location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs. Applications for operational work involving sewerage reticulation Drawings showing: [_] Confirmed location of all existing and proposed services betnot applicable location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable). Applications for operational work involving street lighting Drawings showing: CL] Confirmed location of ail light poles and service conduits Not applicable location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—-3 August 2015
Page 13
Department of Infrastructure, Local Government and Planning e details of lighting levels. | Applications for operational work involving public utility services Drawings showing: [_] Confirmed ® any existing light poles and power poles Not applicable ® any existing underground services e details of proposed services ® alteration to existing services. Applications for operational work involving landscaping works Drawings showing: [_] Confirmed e the location of proposed plant species [x] Not applicable e aplant schedule indicating common and botanical names, pot sizes and numbers of plants e planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details. Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—3 August 2015